My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20461
COE
>
City of Eugene
>
Ordinances
>
2010 No. 20450-20469
>
Ordinance No. 20461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 1:24:23 PM
Creation date
1/21/2011 3:32:58 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
8/11/2010
Document_Number
20461
Author
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geographic <br />Estimated <br />Name <br />Limits <br />Description <br />Jurisdiction <br />Cost <br />Length Number <br />Status. <br />Unprogrammed <br />28th Street <br />Main Street to Centennial <br />Widen /provide sidewalks <br />Springfield <br />$1,050,000 <br />0.7 <br />909 <br />Boulevard <br />and bike lanes; provide <br />intersection and signal <br />improvements at Main Street <br />31 st Street <br />Hayden Bridge Road to U Upgrade to 2 to 3 -lane urban <br />Lane County <br />$1,275,000 <br />0.85 <br />765 <br />Street <br />facility <br />35th Street <br />Commercial Avenue to <br />Upgrade to 3 -lane urban <br />Springfield <br />$920,000 <br />0.46 <br />918 <br />. <br />Olympic Street <br />facility <br />42nd Street <br />Marcola Road to Railroad <br />Reconstruct to 3 -lane urban <br />Springfield <br />$2,064,000 <br />1.03 <br />713 <br />Tracks <br />facility <br />48th Street <br />Main Street to G Street <br />Upgrade to 2 -lane urban <br />Springfield <br />$720,000 <br />0.48 <br />3 <br />facility <br />52nd Street <br />G Street to <br />Upgrade to 2 -lane urban <br />Springfield <br />$300,000 <br />0.2 <br />6 <br />Eugene- Springfield <br />facility <br />Highway (SR 126) <br />69th Street <br />Main Street to Thurston <br />Widen on east side of <br />Springfield <br />$840,000 <br />0.56 <br />15 <br />Road <br />roadway <br />Agate Street <br />30th Avenue to Black Oak Upgrade to 2 -lane urban <br />Eugene <br />$585,000 <br />0.39 <br />215 <br />Road <br />facility <br />Aspen Street <br />West D Street to <br />Reconstruct to 2 to 34ane <br />Lane County, <br />$750,000 <br />0.5 <br />809 <br />Centennial Boulevard <br />urban facility <br />Springfield <br />Baldy View Lane <br />Deadmond Ferry Road to <br />Upgrade to urban standards <br />Springfield <br />$420,000 <br />0.28 <br />715 <br />the and of dedicated <br />right-of-way <br />Bethel Drive <br />Roosevelt Boulevard to <br />Upgrade to 2 -lane urban <br />Eugene <br />$2,500,000 <br />1.68 <br />414 <br />Highway 99 <br />facility <br />Commercial Street <br />35th Street to 42nd Street Upgrade to 34ane urban <br />Springfield <br />$1,620,000 <br />0.81 <br />933 <br />facility <br />County Farm Loop <br />North -to -South Section <br />Upgrade to 3 -lane urban <br />Lane County, <br />$825,000 <br />0.55 <br />631 <br />facility <br />Eugene <br />• County Farm Loop <br />West -to -East Section <br />Upgrade to 2 -lane urban <br />Lane County, <br />$795,000 <br />0.53 <br />632 <br />._ <br />facility„„_,.,,,,....,.... - - -- ._... -- <br />Eugene _,.,_.,. <br />_..... <br />._- <br />Deadmond Ferry <br />Baldy Lane to <br />Upgrade to urban standards <br />Springfield <br />$1,095,000 <br />0.73 <br />724 <br />Road <br />McKenzie River <br />Division Avenue <br />Division Place to River <br />Upgrade to 2 to 3 -lane urban <br />Eugene <br />$1,720,000 <br />0.85 <br />509 <br />-Elm,Fa Read <br />Avenue <br />Beke'sen Read to <br />facilit <br />Up to 2 'one <br />Eu <br />TramPlan <br />tifbam <br />4 1 4.24 <br />July 2002 <br />408 <br />Chapter 3, Page <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.