My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20461
COE
>
City of Eugene
>
Ordinances
>
2010 No. 20450-20469
>
Ordinance No. 20461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 1:24:23 PM
Creation date
1/21/2011 3:32:58 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
8/11/2010
Document_Number
20461
Author
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geographic Estimated <br />Name Limits Description Jurisdiction Cost Length Number <br />ber <br />Project Category: Study <br />Status: Programmed <br />Status Sub -Total $3,375 <br />Status: Unprogrammed <br />1 -5 Interchange <br />Study <br />Wilamette River south <br />to 30 Avenue <br />Comprehensive study of 1 -5 <br />interchanges <br />ODOT <br />$750,000 <br />-- <br />250 <br />18th Avenue <br />Bertelsen Road to Agate <br />Street <br />Corridor study to determine <br />Eugene <br />$250,000 <br />4.79 118 <br />improvements <br />Chambers Street <br />8th Avenue to 18th <br />Avenue <br />Corridor Study to determine <br />Eugene <br />$250,000 <br />0.8 136 <br />Coburg Road <br />Crescent Avenue to <br />improvements <br />Access management) <br />Eugene <br />$900,000 <br />2.24 619 <br />Oakway Road <br />safety - operational study <br />GOLAh Bank Street <br />W 11 th Avenue <br />Mill 6treet-te 1 10 <br />Be1#line Road to <br />Chambers Street <br />Beveiap refinef"ent I slam fef <br />Access Management, <br />Safety, and Operational <br />Eti <br />Eugene <br />$269,99% <br />$100,000 <br />4 <br />2.74 332 <br />Study <br />Willamette <br />Street/Amazon <br />13th Avenue to 33rd <br />Avenue <br />Corridor study to determine <br />improvements <br />Eugene <br />$250,000 <br />5.55 187 <br />Parkway /Patterson <br />Street(Hilyard Street <br />Main Street/ <br />Highway 126 <br />1 -5 to UOB <br />Access management plan <br />ODOT15pringfield <br />$100,000 <br />6.0 838 <br />Eugene-Springfield <br />Hwy. <br />1 -5 to Main <br />Corridor Study <br />ODOT /Springfield <br />$150,000 <br />6.5 835 <br />Main St. and 52nd <br />St./Hwy 126 Int. <br />52nd to Main <br />interchange Plans <br />ODOT /Springfield <br />$100,000 <br />1.5 96 <br />Beltline <br />River Rd to Coburg Rd <br />Facility Plan Study <br />ODOT <br />$500,000 <br />3.46 555 <br />Status Sub -Total $3 <br />Project Category Sub -Total $69425,000 <br />TransPl'an <br />July 202 <br />` Chapter 3, Page 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.