Laserfiche WebLink
<br /> <br />design, if available, including data from laboratory <br />testing and pilot/full-scale operations, and information <br />regarding the operations of any full-scale installations; <br />c. Any other available information about the proposed <br />design, including peer review articles, scientific or <br />engineering journals, and approvals from other <br />jurisdictions. <br /> 3. The applicant has submitted a method and schedule for <br />monitoring the effectiveness of the proposed design once <br />constructed, and a schedule for its maintenance; <br /> 4. The applicant has submitted a signed statement that the <br />applicant will replace the alternative flow control facility if the <br />facility does not function as proposed. <br />(e) The requirement in EC 9.6795(3) that oil control facilities be sited, <br />designed and constructed according to the oil control provisions and the <br />facility design requirements set forth in the Stormwater <br />Management <br /> Manual may be adjusted if the applicant can demonstrate that the <br /> selected oil control facility will achieve the same result as those <br /> listed in the Stormwater Management Manual. <br />(f) The requirement in EC 9.6796(3) that source controls be sited, <br />designed and constructed according to source control provisions <br />set forth in the Stormwater Management Manual may be adjusted <br />if the applicant can demonstrate that the selected source control <br />will achieve the same result as those listed in the Stormwater <br />Management Manual. Applicants seeking an adjustment to EC <br />9.6796(3) must submit a completed authorization request form <br />adopted as part of the Stormwater Management Manual. <br /> <br /> <br />Section 6 <br /> . Subsection (1) of Section 9.8055 of the Eugene Code, 1971 is <br />amended as follows: <br />9.8055 Cluster Subdivision- Approval Criteria - General. <br />The planning director <br />shall approve, approve with conditions, or deny a proposed cluster <br />subdivision. Approval or approval with conditions shall be based on the <br />following: <br />(1) <br />The proposed subdivision complies with: <br />(a) EC 9.8515 Subdivision, Tentative Plan Approval Criteria- General <br />except for the standards related to EC 9.2760 Residential Zone <br />Lot Standards; <br />(b) EC 9.2750 Residential Zone Development Standards; <br />(c) EC 9.2000 through 9.3915 regarding lot dimensions, solar <br /> <br />Ordinance - <br />17 <br />L:\CMO\2006 Council Agendas\M060410\S0604104-attA.doc <br />4/3/06 - Ordinance includes changes made pursuant to the 1/9/06, 1/10/06 and 2/13/06 PC meetings and the 3/13/06 <br />City Council Work Session. <br />