Laserfiche WebLink
projects, a respons~le person must be identified for each phase. <br /> <br /> 7.1.5 A construction schedule,/ncluding identification of any work that will <br /> be done during the wet:weather season (October 15 - April 30) and for that work, all <br /> additional BMP's to be implemented to meet wet-weather requirements. <br /> <br /> 7.1.6 If any of the required information is to be provided by a contractor, <br /> indicate on the CSMP that k is to be provided by others. The/nformation must be <br /> submitted prior to approval of the permit. <br /> <br /> 7.2 UmbrellaPermit - CSMP Contents. The Construction Site Management Plan <br /> for Umbrella Permits shall address all of the factors 1/sted in subsection 7.1 above, and shall <br /> also include: <br /> <br /> 7.2.1 Identification of all construction activities or phases which w/ll be <br /> covered by the permit. <br /> <br /> 7.2.2 A construction schedtde for each of the construction activities or <br /> phases identifiec[ <br /> <br /> 7.2.3 Idemification of any period covered by the permit when no <br /> construction activity will be occurring, and the person that will be responsible for <br /> maintaining the BMPs and providing for any needed site stabilization during the <br /> periods of no construction. <br /> <br /> 7.3 Individual Residential Permit - Terrmlate. If the proposed construction is for <br /> one single family dwelling, or one duplex dwelling, the property owner need not utilize the <br /> services of a certified professional in the preparation of the Plar~ A template plan may be <br /> submitted, and upon approval by the City it ~¢All serve to satisfy requirements for the single <br /> family dwelling and duplex construction activities. <br /> <br /> 7.4 kamual Permit. If the proposed construction activity qualifies for an armnal <br /> permit, preparation of a CSMP is not necessary. In lieu of a CSlVlP, the applicant shall <br /> submit all of the following/nformation with the application: <br /> <br /> 7.4.1 Description of the scope of work and types of construction activities to <br /> be performed. <br /> <br /> 7.4.2 Identification ofthe sites where construction activities will occur during <br /> the life of the permit, ffknown at the time the application is submitted. <br /> <br /> 7.4.3 Description of the erosion, sedimentation, and construction site <br /> management practices, including a description oferosionpreventionmaterials located <br /> <br />Administrative Rule - 16 <br />CA I~EMPX03 EmsionPre v-2ao WlXt <br /> <br /> <br />