My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: Bond Measure to Fix Streets
COE
>
City of Eugene
>
Council Agendas 2011
>
CC Agenda - 05/11/11 Work Session
>
Item A: Bond Measure to Fix Streets
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2011 1:39:46 PM
Creation date
5/6/2011 1:20:04 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Additional Streets to be Repaired with Proceeds from the Street Bond Measure <br />Ped Ramps <br />Bike <br />Proposed Functional Transit Missing or Programmed <br />Street nameFromToWard(s)Facilities/ <br />TreatmentClassificationRoute?Need Cost <br />Route? <br />Upgrades <br />5th AvenueHigh StreetBlair Street7Reconstruct/OverlayLocal (High - Wash.)YesYesYes $ 2,000,000 <br />Major Collector (Wash - <br />Blair) <br />West 18th AvenueWashington Street 510' east of 1ReconstructMinor ArterialYesYesYes $ 2,300,000 <br />Chambers <br />Coburg RoadCity LimitsCrescent Avenue4,5OverlayMajor ArterialYesYesYes $ 260,000 <br />Harris Street18th Avenue28th Avenue3Reconstruct/OverlayNeighborhood YesYesNo $ 800,000 <br />Collector <br />Marshall AvenueHughes Echo Hollow Road6OverlayNeighborhood NoYesNo $ 310,000 <br />Collector <br />Roosevelt Blvd.Danebo RoadTerry St.8OverlayMinor ArterialNoYesYes $ 200,000 <br />Donald StreetWillamette Street40th Avenue2Reconstruct/OverlayMajor CollectorYesYesNo $ 690,000 <br />Total <br /> $ 6,560,000 <br />ATTACHMENT <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.