Laserfiche WebLink
Metropolitan Wastewater Management Commission Eugene Budget Detail <br />Work cooperatively on the CIP elements and effectively integrate capital project work with ongoing <br />O&M activities, with emphasis on maintaining an effective CIP management and coordination <br />program with Springfield. <br />Achieve ongoing sustainable efficiencies by initiating projects to reduce energy consumption. This <br />includes the Aeration Blower Design & Engineering project that will provide significant ongoing <br />electrical energy savings. The two-year project includes $275,000 in the proposed FY11-12 budget <br />for design and engineering work, and an estimated $1,225,000 to be budgeted in FY12-13 for <br />equipment and construction costs to complete the project. <br />Manage the Operations & Maintenance (O&M) aspects of the Biocycle Farm, continuing the <br />development of the biosolids irrigation practices and poplar tree management. <br />SIGNIFICANT CHANGES IN THE O & M BUDGET FOR FY 11-12 <br />The proposed budget for Operations and Maintenance of the regional wastewater treatment facilities <br />. <br />(personnel, materials and services, and capital outlay) for FY 11-12 totals $12,112,828 The amount <br />represents an increase of 4.3% from the FY 10-11 budget. The largest cost centers for the proposed budget <br />are personnel costs, utilities, materials, maintenance, and chemicals. Details of significant items and changes <br />proposed for the FY 11-12 Operations and Maintenance budget as compared to the FY 10-11budget include: <br />Personnel Services <br />Personnel Services totaling $7,445,623 represents a FY 11-12 increase of $423,498 or 6%. The major <br />changes are in the following budget categories: <br />Staffing <br />An increase of 0.19 FTE is proposed for FY11-12 due to rebalancing FTE between local and regional <br />funds. <br />FTE Fund Reallocations – During the preparation of the annual budget proposal, the distribution of FTE <br />hours for regional and non-regional activities from the previous year are reviewed and adjustments are <br />made to the proposed year’s budget. This is done to project proper charges of staffing based on actual <br />time spent between the regional and local funds, and planned labor activities for the coming fiscal year. <br />(+0.19 FTE increase) <br />Regular Wages $4,726,022 [Increase of $120,028 or 2.6%] <br />Salaries are based upon negotiated management/labor contracts between the City of Eugene and the local <br />union (AFSCME). The Cost of Living (COLA) is projected at 2.0%. <br />The increase is also a result of annual merit increases for existing staffs, as applicable. <br />Employee Benefits $1,484,936 [Increase of $174,706 or 13.3%] <br />Page 33 DRAFT FY 11-12 BUDGET AND CIP <br />