My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Ratification of MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2011
>
CC Agenda - 05/23/11 Meeting
>
Item 3: Ratification of MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2011 9:40:12 AM
Creation date
5/20/2011 1:36:38 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br /> <br />FACILITY PLAN ENGINEERING SERVICES <br />Description: <br /> Engineering services for analysis, project definition, cost estimating, and general <br />consultation regarding the 20-Year Facilities Plan. <br />Status: <br />This year, work included continued assistance with overall coordination of utility needs <br />for the various projects in the capital program at the plant, assistance with plant wide <br />corrosion control and cathodic protection of piping systems, and a load study and <br />modeling of WPCF electrical systems. <br />Justification: <br /> Projects were developed to varying levels of specificity in the 20-Year Facilities Plan and <br />there is an on-going need to have a consistent technical and engineering resource to <br />help in further refining projects and generally assisting with implementation of the plan. <br />Another need addressed by this resource is assurance that the new improvements <br />maintain the overall integrity of the plant in terms of treatment processes and hydraulics. <br />Project Driver: <br />Ongoing goal to efficiently follow and update the 20-Year Facilities Plan. <br />Project Trigger: <br />On-going need. <br />Estimated Project Cost: <br />$617,585 (Note: Staff anticipates continuation of the need for facility plan engineering <br />services in 2015-2016 and beyond. Therefore, $81,446 was added for FY 15-16, which <br />assumes 5% inflation annually) <br />Expected Cash Flow: <br />FY 06-07 = $50,000; FY 07-08 = $50,044; FY 08-09 = $25,467; <br /> FY 09-10 = $31,829; FY 10-11 = $90,000; FY 11-12 = $67,005; <br /> FY 12-13 = $70,355; FY 13-14 = $73,873; FY 14-15 = $77,567; <br /> FY 15-16 = $81,445 <br />PriorEst .Act. <br />Expenditure/Category:Years2010-112011-122012-132013-142014-152015-16Total <br />Design/Construction 00000000 <br />Other $157,340 $90,000 $67,005 $70,355 $73,873 $77,567 $81,445 $617,585 <br />Total Cost $157,340 $90,000$67,005$70,335$73,873$77,567 $81,445$617,585 <br />Page 51 DRAFT FY 11-12 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.