Laserfiche WebLink
Metropolitan Wastewater Management Commission Capital Improvement Program <br />EFFLUENT REUSE - PHASE 1 <br /> <br />Description: <br /> This project is the first package of funding for effluent reuse to address thermal load <br />issues and for multiple environmental benefits. This project combines two projects <br />identified in the 2004 MWMC Facilities Plan; Level II Reuse at Seasonal Industrial Waste <br />and Level 4 Effluent Reuse Demonstration Projects. Project components may include <br />additional treatment, disinfection, pumping, pipeline, and distribution/irrigation systems. <br />The projects will be better defined as the planning for reuse continues and as markets <br />for reuse are identified. <br />Status: <br />Ongoing planning phase. The MWMC reached a settlement agreement on October 28, <br />2009 with the Department of Environmental Quality (DEQ) related to Willamette River <br />total maximum daily loads (TMDL) for temperature. <br />Justification: <br /> Implements reuse so that thermal load is removed from the Willamette River and for <br />multiple environmental benefits. <br />Project Driver: <br />Expansion of effluent reuse programs. Address NPDES permit thermal load compliance <br />related to Willamette River total maximum daily loads (TMDL) temperature requirements. <br />Project Trigger: <br />Potential exceedance of NPDES thermal load limit.Identification of water needs for <br />potential clients. <br />Project Type: <br />100% Performance <br />Improvement SDC Eligibility: <br />26% <br />Estimated Project Cost: <br />$ $3,325,000 <br />Expected Cash Flow: <br />FY 06-07 = $7,000; FY 07-08 = $0; FY 08-09 = $2,904; FY 09-10 = $12,757; <br />FY 10-11 = $213,271; FY 11-12 = $2,064,000; FY 12-13 = $1,025,068 <br />PriorEst. Act. <br />Expenditure/Category:Years2010-112011-122012-132013-142014-152015-16Total <br />Design/Construction $22,661 $213,271 $3,089,068 $0000$3,325,000 <br />Other 00000000 <br />Total Cost $22,661 $213,271 $3,089,068 $0$0$0$0$3,325,000 <br />Page 57 DRAFT FY 11-12 BUDGET AND CIP <br />