My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2A: Approval of City Council Minutes
COE
>
City of Eugene
>
Council Agendas 2011
>
CC Agenda - 06/13/11 Meeting
>
Item 2A: Approval of City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2011 3:02:39 PM
Creation date
6/10/2011 2:23:49 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT D <br />M I N U T E S <br /> <br />Eugene City Council <br />McNutt Room—City Hall <br />777 Pearl Street—Eugene, Oregon <br /> <br />May 11, 2011 <br />Noon <br /> <br />COUNCILORS PRESENT: Betty Taylor, George Brown, Andrea Ortiz, George Poling, Mike Clark, <br />Chris Pryor, Alan Zelenka, Pat Farr. <br /> <br />Her Honor Mayor Kitty Piercy called the May 11, 2011, work session of the Eugene City Council to <br />order. <br /> <br />A. WORK SESSION: <br />Authorize Additional Street Preservation Projects to Use Anticipated Bond Proceeds <br />Remaining Upon Completion of 32 Streets Identified in Bond Measure <br /> <br />City Engineer Mark Schoening joined the council for the item. He introduced members of the Street <br />Repair Review Panel present, who included Howard Bonnett, John Barofsky, and Janet Calvert. Other <br />members of the panel included Jim Wilcox, Steve Lee, Gary Wildish, Paul Holbo, Dan Brown, Paul <br />Adkins, Bob Kline, Clayton Walker, and Bruce Mulligan. <br /> <br />Mr. Schoening presented the panel’s recommendations for street projects to be funded using the <br />remaining moneys from the Bond Measure to Fix Streets. He anticipated $10 million would remain after <br />the 32 projects listed in the measure were completed. He sought council approval to fund additional <br />projects. Mr. Schoening anticipated that if the council approved the project list, the City would begin to <br />work immediately with the goal of commencing construction in 2013. <br /> <br />Mr. Schoening briefly described the process used by staff to identify the initial project list. The panel <br />reviewed the initial list and narrowed it to a list of geographically distributed projects that cost about $6.5 <br />million. He reported that the panel was in the process of considering additional projects. <br /> <br />Mr. Schoening called attention to the project list, reflected in Attachment A of the Agenda Item Summary <br />(AIS), entitled Additional Streets to be Repaired with Proceeds from the Street Bond Measure. He <br />invited questions. <br /> <br />Mayor Piercy expressed appreciation for the projects on the list, noting many of the streets had been <br />discussed as needing repairs for a long time. She solicited questions and comments from the council. <br /> <br />Mr. Zelenka determined from Mr. Schoening that the surplus funding was a result of the recession and the <br />bidding climate, the cost of interest, and the paving technique used, which allowed contractors to recycle <br />the roadway materials in place and reduced the number of trucks needed. In addition, some of the streets <br />identified in the measure were in better condition than anticipated because of good design and the failure <br />did not extend to the street base, which lowered the project costs. <br /> <br /> <br /> <br />MINUTES—Eugene City Council May 11, 2011 Page 1 <br /> Work Session <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.