Laserfiche WebLink
<br />that amount. Specifically, the local motor vehicle fuel tax funds approximately $3 million annually and <br />the five-year street bond funds approximately $6.5 million annually through FY14. <br /> <br />Road Operations and Maintenance (O&M) Needs – The Road Fund (O&M) provides for street operations <br />, <br />services such as street lighting and signals, street signage and striping, pothole patching and crack sealing <br />concrete and asphalt street repairs, and snow and ice operations. Prior to the passage of HB 2001, the <br />Road Fund had come to rely on service reductions and the use of reserves together with transfers from the <br />General Fund and other sources to maintain a minimum level of service. The operating reserve balance <br />was exhausted by FY10 and the annual deficit for street operation and maintenance services in the Road <br />Fund was projected to exceed $3 million in FY11, growing to over $4 million by FY13. However, with <br />the new state transportation bill, the City is expecting to receive approximately $3 million in additional <br />state highway funding each year. This funding, combined with revenues from the utility systems for the <br />use and occupancy of the City's right-of-way, will lessen the road operations funding gap reported in <br />previous years. Even with the progress realized from the current funding levels, the six-year forecast ends <br />with less than one month of balance available, an amount below the two-month target. This forecast <br />includes continuing the pavement repair project on unimproved streets (aka the “Enhanced Pothole Repair <br />Program”) at the level of $200,000 per year for the next six years. <br /> <br />Pavement Preservation Progress <br />Since the local gas tax funded Pavement Preservation Program (PPP) was started in 2002, the City has <br />completed nearly $18 million in street preservation project work funded through the local gas tax, and <br />another $4.8 million in gas tax funded projects is scheduled in 2011. Through 2010, nearly 250 lane miles <br />of streets – more than 20 percent of the City’s total improved street system – have been repaired with PPP <br />slurry seals, overlays and reconstruction. The PPP projects are in addition to bond measure, assessment, <br />and grant-funded paving projects and the crack sealing, pothole patching, concrete panel replacement and <br />other ongoing street repair services performed by Public Works Maintenance Division. Gas tax funded <br />ththrd <br />projects completed in 2010 include portions of 11 Avenue, 13 Avenue, 33 Avenue, Goodpasture <br />Island Road, Hawkins Lane, Oakway Road, Patterson and Valley River Drive. Projects planned for 2011 <br />th <br />include portions of City View, Wilson Street, Conger Street, Jefferson Street, Washington Street and 13 <br />Avenue. Attachment A provides a history of pavement preservation program projects from 2002 – 2011. <br /> <br />The 2011 Pavement Management Report (Attachment B) was compiled by the Public Works Maintenance <br />Division’s Surface Technical Team to provide updated information on the condition of asphalt paving in <br />Eugene using 2010 rating and inventory data. The report includes an inventory of streets by improvement <br />status and functional classification, details how a pavement management system is used to inspect and <br />rate pavement surfaces, explains Eugene’s pavement preservation program, and includes updated <br />information about treatment types and costs. The updated report on the condition of Eugene’s streets <br />shows progress has been made but more work is needed to further reduce the backlog of needed repairs on <br />the 1,324 lane miles of streets in the City. <br /> <br /> <br />RELATED COUNCIL GOALS AND POLICIES <br />The council’s Vision and Goals Statement with respect to Fair, Stable and Adequate Financial Resources <br />reaffirms commitment to “a local government whose ongoing financial resources are based on a fair and <br />equitable system of taxation and other revenue sources and are adequate to maintain and deliver <br />municipal services.” The council’s goals include “Transportation Initiative: Develop mechanisms to <br />adequately fund our transportation system for cars, trucks, bikes and pedestrians including maintenance <br /> \ \cesrv500\CC Support\CMO\2011 Council Agendas\M110615\S110615A.doc <br /> <br />