ATTACHMENT A
<br />
<br />History of Pavement Preservation Program
<br />Projects as of May 2011
<br />
<br />Since the local gas-tax-funded Pavement Preservation
<br />Program (PPP) was started in 2002, the City has completed
<br />nearly $18 million in street preservation project work funded
<br />through the local gas tax, and another $4.8 million in gas-tax
<br />funded projects is scheduled in 2011. Through 2010, nearly
<br />250 lane miles of streets – more than 20 percent of the City’s
<br />total improved street system – have been repaired with PPP
<br />slurry seals, overlays and reconstruction. The PPP projects
<br />listed below are in addition to bond measure, assessment,
<br />and grant-funded paving projects and the crack sealing,
<br />pothole patching, concrete panel replacement and other
<br />ongoing street repair services performed by Public Works
<br />Maintenance Division.
<br />
<br />2011
<br />thth
<br />
<br /> City View (18 to 28 avenues)
<br />
<br /> Jefferson and Washington street intersections
<br />thth
<br />
<br /> Wilson Street (7 to 11 avenues)
<br />thth
<br />
<br /> Conger Street (5 to 7 avenues)
<br />stth
<br />
<br /> Jefferson Street (1 to 8 avenues)
<br />stth
<br />
<br /> Washington Street (1 to 6 avenues)
<br />th
<br />
<br /> 13 Avenue (Alder to Kincaid streets)
<br />thththththth
<br />
<br /> Slurry seals: portions of 36 and 39 Place, East 37, 38 39 and 44 avenues, Dillard
<br />Road, Fox Glen Avenue, Alder and Hilyard streets and Pinecrest in the west Amazon area;
<br />st
<br />portions of Potter Street, 41 Avenue, Kincaid Street, Amazon cul de sac, Larch and Snell
<br />streets, Center Way, Whiteaker and Garnet streets, Nectar Way, Alpine Loop and Martin Way
<br />in the east Amazon area; portions of Thomason Lane, Cheshire and Sycamore avenues,
<br />Cross, Polk, Clark, Jackson, Van Buren, Cedar, Adams, Ash, Madison and Jefferson streets,
<br />and the Own Rose Garden parking lot in the Whiteaker area; and portions of Alexandra Court,
<br />Arrowhead Street, Barstow and Blackfoot avenues, Dahlia Lane (north), Dorchester Lane, Dry
<br />Creek Road, Hammer Lane, Hyacinth Street cul de sac, Leonards Way, Merlot Avenue, Piper
<br />Sonoma Street, Rhine Way, Risdon Place and cul de sac, Swenson Lane, and Willowbrook
<br />Street in a cooperative project with Lane County Public Works in the Santa Clara area.
<br />
<br />2010
<br />
<br /> 11th Avenue (Garfield to Tyinn streets)
<br />
<br /> 13th Avenue (Alder to Washington streets)
<br />
<br /> 33rd Avenue (Hilyard to Willamette streets)
<br />
<br /> Goodpasture Island Road (Valley River Drive to culvert crossing)
<br />
<br /> Hawkins Lane (18th Avenue to Videra)
<br />
<br /> Oakway Road (Cal Young Road to Fairway Loop)
<br />rdth
<br />
<br /> Patterson (23 to 24 avenues)
<br />
<br /> Valley River Drive (Valley River Way to Goodpasture Island Road)
<br />ththththththstrdth
<br />
<br />
<br /> Slurry seals:portions of 34, 35, 36, 37, 38, 39, 41 and 43 avenues, 39 Place,
<br />Knob Hill, Oak, Patterson, Spencer, Southridge, Dana and Stafford courts, and Ferry, Oak,
<br />Pearl Street, High, Mill, Fillmore, Powell Tiara, Durbin, Garfield and Cleveland streets,
<br />Glen Oak and Emray drives, Heather Way, Lemery Lane, Ingalls Way and Whitbeck
<br />Boulevard in south Eugene; and portions of Applewood Lane, Balboa, Tulip, Acacia,
<br />Norkenzie, Holly, Crescent cul de sac, Elysium, Birchwood, Nirvana, Palmer, Providence ,
<br />Valhalla, Azure Medina and Lillian streets and Rocky Lane in north Eugene.
<br />
|