My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20224
COE
>
City of Eugene
>
Ordinances
>
2001 No. 20220-20243
>
Ordinance No. 20224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2012 12:28:15 PM
Creation date
6/15/2011 2:33:57 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
2/26/2001
Document_Number
20224
CMO_Effective_Date
2/26/2001
Author
Sandra Stubbs
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
muffled .and reduced pursuant to those standards. <br />6. A landscape plan drawn to scale showing proposed and existing <br />landscaping, including type, spacing, size and irrigation methods. <br />7. Plans showing the connection to utilities/right-of-way cuts required, <br />ownership of utilities and easements required. <br />S. Documents demonstrating that necessary easements have been <br />obtained; <br />9. Plans showing how vehicle access will be provided; <br />10. Signature of the property owner(s) on the application form or a <br />statement from the property owner(s) granting authorization to <br />proceed with development permit and land use processes; <br />11. Documents demonstrating that the FAA has reviewed and approved <br />the proposal, and Oregon Aeronautics Division has reviewed the <br />proposal. Alternatively, when a site review or conditional use <br />process is required, submit a statement documenting that notice of <br />the proposal has been submitted to the FAA and Oregon Aeronautics <br />Division. The site review or conditional use process may proceed <br />and approval may be granted for the proposal as submitted, subject <br />to FAA approval. If FAA approval requires any changes to the <br />proposal as initially approved, then that initial approval shall be void. <br />A new application will need to be submitted, reviewed and approved <br />through an additional site review or conditional use process. No <br />development permit application shall be submitted without <br />documents demonstrating FAA review and approval and Oregon <br />Aeronautics Division review. <br />(c) Site review and conditional use pen applications. In addition to the <br />application requirements specified in paragraph (b) above, applications for <br />site review or conditional use permits also shall include the following <br />information: <br />1. A visual study containing, at a minimum, a graphic simulation <br />showing the appearance of the proposed tower, antennas, and <br />ancillary facilities from at least 5 points within a 3 mile radius. Such <br />points shall be chosen by the provider with review and approval by <br />the planning director to ensure that various potential views are <br />represented. <br />2. Documentation that alternative sites within a radius of at least 2000 <br />feet have been considered and have been determined to be <br />technologically unfeasible or unavailable. For site reviews, <br />alternative sites zoned C-4, I -1, I -2, and I -3 must be considered. For <br />conditional use permits alternative sites zoned PL, C -2 and C -3, C -4, <br />I- 1, I -2, and I -3 must be considered. <br />3. Evidence demonstrating collocation is impractical on existing tall <br />buildings, light or utility poles, water towers, existing transmission <br />Ordinance - 194 <br />
The URL can be used to link to this page
Your browser does not support the video tag.