My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20224
COE
>
City of Eugene
>
Ordinances
>
2001 No. 20220-20243
>
Ordinance No. 20224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2012 12:28:15 PM
Creation date
6/15/2011 2:33:57 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
2/26/2001
Document_Number
20224
CMO_Effective_Date
2/26/2001
Author
Sandra Stubbs
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirements in EC 9.7000 through 9.7885, Application Procedures, and any <br />additional requirements of EC 9.8000 through 9.8865. To the extent there is a <br />conflict, the provisions in EC 9.8000 through 9.8865 control. <br />(2) If an initial proposal also requires an application be submitted for one or more <br />of the following: <br />(a) Adjustment review; <br />(b) Site review; <br />(c) Conditional use permit; <br />(d) Planned unit development; <br />(e) Zone change; or <br />(e) Willamette Greenway permit, <br />the applicant may elect to have the applications reviewed concurrently according <br />to the highest application type. All other provisions of this code would continue <br />to apply to each application, including, but not limited to, the approval criteria. <br />(3) If the city's final decision for any land use application reviewed and approved in <br />accordance with the provisions of this land use code includes a finding of <br />compliance with specific land use development standards, those standards shall <br />not be considered at the time of a development permit application. <br />9,8010 List of Ado ted Plans. The documents listed in the following Table 9.80 1 0, <br />including any adopted amendments, are the currently effective adopted plans that may <br />be applicable to a particular land use application. The plans and adopted policies are <br />more particularly set forth beginning at EC 9.9500, and the boundaries for each are <br />depicted on Map 9.8010 Adopted Plans. <br />Table 9.5010 List of Adopted Plans <br />Bethel- Danebo Refinement Plan (Phase II) -- 1979 <br />River Road -Santa Clara Urban Facilities Plan-- 1987 <br />Bethel- Danebo Refinement Plan -- 1982 <br />Riverfront Park Study- - 1986 <br />Comprehensive Stormwater Management Plan -- 1994 <br />South Hills Study- - 1974 <br />Eugene Commercial Lands Study- - 1992 <br />South Willamette Subarea Study 1988 <br />Eugene Downtown Plan --- 1984 <br />TransPlan (Metro Area Transportation Plan) -- 1986 <br />Eugene Parks and Recreation Plan -- 1989 <br />West Eugene Wetlands Plan-- 1992 <br />Eugene -- Springfield Metropolitan Area General Plan <br />(Metro Plan) <br />West University Refinement Plan-- 1982 <br />FairmountlU of G Special Area Study - 1982 <br />Westside Neighborhood Plan -- 1987 <br />Jefferson/Far West Refinement Plan - 1983 <br />whiteaker Plan -- 1994 <br />Laurel Hill Neighborhood Plan - 1982 <br />willakenzie Area Plan —1992 <br />19'' and Agate Special Area Study - 1988 <br />Willow Creek Special Area Study- - 1982 <br />Resolution No. 3862 Adopting the Vest 11 <br />Commercial Land Use Policy and Refining the <br />Eugene - Springfield Metropolitan Area General Plan <br />( Adopted June 13, 1984) <br />Resolution No. 3885 Establishing Areas for the <br />Application of C-4 Commercial - Industrial District <br />Zoning, and Amending Resolution No. 3862 (Adopted <br />on November 13, 1984 <br />Ordinance - 326 <br />
The URL can be used to link to this page
Your browser does not support the video tag.