My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2A: Approval of City Council Minutes
COE
>
City of Eugene
>
Council Agendas 2011
>
CC Agenda - 09/12/11 Meeting
>
Item 2A: Approval of City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2011 2:20:33 PM
Creation date
9/9/2011 10:01:32 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
9/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
used and where such improvements might encourage bicycling. Mr. Inerfeld said staff proposed bicycle <br />improvements on North Park Avenue in recognition of how challenging it was to bicycle through that <br />area. He said there were many improvements proposed for the areas mentioned by Ms. Ortiz. <br /> <br />Mayor Piercy encouraged staff to provide the council with a more focused look at the facility <br />improvements planned for the Bethel area. <br /> <br />Mr. Farr said the Bethel area was linked to downtown through a bicycle connection from Terry Street, but <br />that connection was out of the way, causing people to use less safe routes such as Highway 99. He <br />acknowledged the improvements that had been made in the area but continued to advocate for better, <br />more direct connections between Bethel and downtown and for improved access for Bethel residents to <br />the Ruth Bascom Riverbank Trail. Mr. Inerfeld assured Mr. Farr that staff attempted to create a bicycle <br />network for the entire city; the challenge was getting the system funded and built. <br /> <br />Mr. Farr noted the challenge of reaching downtown from the Bethel area by either car or bicycle and <br />advocated for improved access for all modes. <br /> <br />Responding to a question from Mr. Zelenka, Mr. Inerfeld said that the American Community Survey <br />indicated that Eugene had the highest percentage of bicycle commuters (about 11 percent) in the country. <br /> <br />Mr. Zelenka asked about plans to improve connectivity to the Laurel Hill Valley and if there was a way to <br />access the river across the railroad tracks in that area. Mr. Inerfeld reported there was a proposed project <br />that followed the alignment of the I-5 off-ramp to the Laurel Hill Valley as well as a proposed path at the <br />south end of the valley to connect to the Lane Community College basin. In addition, ODOT planned to <br />widen the sidewalk on the south side of Franklin Boulevard between Walnut Street and Judkins Point. He <br />said the Oregon Department of Transportation looked into that possibility of river access in conjunction <br />with the I-5/Willamette River Bridge and found there was insufficient clearance to create a path. <br /> <br />Mr. Zelenka suggested the frontage road would be a good opportunity for a separated lane due to the high <br />speed vehicles traveled when leaving the freeway. <br /> <br />Responding to a question from Mr. Zelenka, Mr. Inerfeld said the City was using green thermoplastic <br />paint markings to draw motorists’ attention to conflict zones where bicyclists had the right-of-way. <br /> <br />Mr. Zelenka asked the percentage breakdown for spending on bicycle and pedestrian improvements. Mr. <br />Inerfeld did not have that information with him but said he could provide it. He asked if Mr. Zelenka was <br />referring to discretionary dollars. Mr. Zelenka suggested the information would be most useful at the <br />metropolitan planning organization level, although he was also interested in the City’s expenditures. He <br />recalled that the City Council directed five percent of the street preservation bond to bicycle facilities. <br />Mr. Inerfeld said some street preservation projects funded by the bond included striping for bicycle paths <br />st <br />where previously there had been none. He cited 1 Avenue as an example. <br /> <br />th <br />Mr. Zelenka called staff’s attention to a conflict area where the bicycle path crossed 19 Avenue at High <br />Street. <br /> <br />Ms. Taylor asked what the City was doing in regard to bicycle theft, which was a serious problem. Mr. <br />Inerfeld said the City offered bicycle registration to help track stolen bicycles for recovery and education <br />on how to properly lock a bicycle. <br /> <br /> <br /> <br />MINUTES—Eugene City Council July 11, 2011 Page 3 <br /> Work Session <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.