Laserfiche WebLink
APPENDIX B <br /> CHANGES TO THE PUBLIC FACILITIES <br /> AND SERVICES PLAN (PFSP) <br /> <br />1. Modify the text preceding existing Table 3 to read as follows: <br /> <br />Planned Wastewater System Improvements <br /> <br />Planned wastewater system improvement projects are listed in tables 3, 4, 4a and 4b. The <br />general location of these facilities is shown in Map 2: Pla~med Wc~stewater Facilities~ and <br />Map 2a: Existing Wastewater Collection and Treatment Systems. [NOTE: This map <br />presently exists as Map 6 in the Technical Background Report: Existing Conditions <br />and Alternatives and should be incorporated without change.] <br /> <br />2. Insert, following Table 4, Tables 4a and 4b, as follows: <br /> <br /> Table 4a <br /> MWMC Wastewater Treatment System Improvement Projects <br /> <br /> Project Project Name/Descnptmn <br /> Number <br /> <br /> 300 WPCF Treatment Project <br /> <br /> 301 Residuals Treatment Project <br /> <br /> 302 Beneficial Reuse Project <br /> <br /> Table 4b <br /> MWMC Primary Collection System Improvement Projects <br /> <br /> Project Project Name/Descnptmn <br /> Number <br /> 303 Willakenzie Pump Station <br /> 304 Screw Pump Station <br /> 305 Glenwood Pump Station <br /> <br />3. Modify Map 2 to show Projects 300 through 305, and insert Map 2a. <br /> <br /> Appendix B Page 1 <br /> <br /> <br />