My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20326
COE
>
City of Eugene
>
Ordinances
>
2004 No. 20307-20332
>
Ordinance No. 20326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:45:26 PM
Creation date
8/2/2004 2:50:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/26/2004
Document_Number
20326
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
infrastructure specifications and requirements of the developing area can be <br /> addressed. Appropriate engineering design practices must be used during the <br /> development and expansion into sensitive areas that are approved for <br /> development (ex.- hillside construction, etc.). Expansion of the existing <br /> collection system will be necessary to meet demands of growth over this time <br /> period. <br /> <br />2. Based on 2003 analysis, lhe Eugene-Springfield metropolitan area treatment <br /> facilities will require facility improvements to address both dry and wet weather <br /> regulatory requirements relating to pollutant loads and wastewater flows. <br /> Regional and local wastewater improvements to the collection and treatment <br /> systems are being planned for and will be implemented to allow for growth within <br /> the UGB and for regulatory compliance. <br /> <br />6. Add Table 16a following Table 16, as follows: <br /> <br /> Table 16a <br /> MWMC Wastewater Treatment and Collection System Improvements, Rough Cost <br /> Estimate, and Timing Estimate <br /> <br /> Project Project Name/Description Cost* Estimated <br /> Number ($000) Completion Year <br /> 300 WPCF Treatment Project $120,500 2025 <br /> 301 Residuals Treatment Project $6,000 2018 <br /> 302 Beneficial Reuse Project $25,000 2018 <br /> 303 Willakenzie Pump Station $6,000 2010 <br /> 304 Screw Pump Station $2,000 2010 <br /> 305 Glenwood Pump Station $500 2012 <br /> *Cost estimated in 2004 dollars <br /> <br />7. Add a new chapter to the Public Facilities and Services Plan, to be Chapter <br /> VI., reading as follows: <br /> <br /> VI. Amendments to the Plan <br /> <br /> This chapter describes the method to be used in the event it becomes necessary or <br /> appropriate to modify the text, tables or the maps contained in the Public Facilities and <br /> Services Plan C~the Plan"). <br /> <br /> Flexibility of the Plan <br /> <br /> Certain public facility project descriptions, location or service area designations will <br /> necessarily change as a result of subsequent design studies, capital improvement <br /> programs, environmental impact studies and changes in potential sources of funding. The <br /> <br /> Appendix B Page 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.