Laserfiche WebLink
Finding 6 and Policy G.3 in the proposed amendments addresses this requirement. In <br /> regard to the PFSP, the modification of the introductory narrative under "Planned- <br /> wastewater System Improvements (Page 28)," the insertion of new Tables 4a and 4b <br /> (Page 2S), and the modification of Map 2 and the insertion of new Map 2a, also address <br /> this requirement. <br /> <br /> OAR 660-011-0035(1)) requires that the public facility plan include a rough cost estimate <br /> for sewer public facility projects identified in the facility plan. In conformity with this <br /> requirement, it is proposed that the PFSP be amended by the insertion of Table 16a <br /> (Inserted following Page 101), which addresses rough cost estimates and a timing <br /> estimate for MWMC Wastewater Treatment and Collection System Improvements. The <br /> rough cost estimates in Table 16a are based on costs set forth in the MWMC 2004 <br /> Facilities Plan and Project list. This 2004 Plan was the result of an exhaustive study that <br /> examined alternatives ranging from $144M to $233M (See Attachment 3). The preferred <br /> alternative, found in Table ~[6a, was selected because, among other reasons, it provides <br /> the least expensive means to comply with federal requirements, and maximizes MWMC's <br /> existing investments. <br /> <br /> OAR. 660-011-0045(3) provides that modifications to projects listed within a public <br /> facility plan may be made without amendment to the public facility plan. This <br /> application proposes to add a new chapter to the PFSP regarding amendments to that <br /> plan. Proposed Chapter VI incorporates the standards for amending a public facility plan <br /> allowed by OAR 660-011-0045(3) and adopts an amendment process. <br /> <br /> Goal 12 - Transportation <br /> <br /> This goal is not applicable to the proposed amendments. <br /> <br /> Goal 13 - Energy Conservation <br /> <br /> This goal is not applicable to the proposed amendments. <br /> <br /> Goal 14 - Urbanization - To provide for an orderly and efficzent transition from rural to <br /> urban land use. <br /> <br /> This goal is not applicable to the proposed amendments, as they do not affect the existing <br /> urban growth boundary. <br /> <br /> Goal 15 - Willamette River Greenway <br /> <br /> This goal is not applicable to the proposed amendments. <br /> <br /> Goal 16 Estuarine Resources, Goal 17 Coastal Shorelands, Goal 18 Beaches and <br /> Dunes, and Goal 19 Ocean Resources <br /> <br /> These goals do not apply to the Eugene-Springfield Metropolitan Area. <br /> <br />Exhibit 1 - 7 <br /> <br /> <br />