Laserfiche WebLink
ATTACHMENT D <br /> <br />Bascom Village - St. Vincent de Paul Society of Lane County (SVDP) and the Housing & <br />Community Services Agency of Lane County (HACSA): <br /> SVDP and HACSA requested <br />funding for Bascom Village, a mixed townhome and flat-style development providing 101 rental <br />units to those earning at or below 50% of area median income, including 5 units set aside for <br />clients of St. Vincent de Paul’s Living Independently Following Treatment (LIFT) Program. <br /> <br />Bascom Village includes 101 units and two community centers within 29 buildings constructed <br />in two phases (53 units in phase I and 48 in phase II). The 29 buildings consist of 17 two-story <br />townhome style duplexes, 8 three-story apartment buildings, 1 single story community center, 2 <br />combination one- and two-story buildings, and 1 two-story community center that includes a <br />classroom and 5 flats. The two story buildings along Park View Drive are similar in height to the <br />existing single family homes in the Mountain Terrace subdivision, north of Park View Drive. <br />The three story buildings on the south property line are designed to be within the maximum <br />height of 35 feet. Included on site are two community centers, laundry facilities and several play <br />areas. The first phase will be completed by SVDP, with the second developed by HACSA. <br />Once complete, both phases will be managed by SVDP and include resident services delivered <br />by SVDP. <br /> <br />SVDP requested $346,000 in HOME funds, $249,593 in Eugene SDCs, and a $58,671 EWEB <br />SDC grant for Phase I. HACSA requested $244,000 in HOME funds, $224,346 in Eugene <br />SDCs, and a $53,136 EWEB SDC grant for Phase II. Each developer will also apply for <br />Eugene’s 20-year Low-Income Rental Housing Property Tax Exemption. Total local funds <br />requested: HOME - $590,000, Eugene SDC waivers - $473,939, EWEB SDC grant - $111,807. <br /> <br />Phase I includes a large community center with a Head Start Classroom and residential units on <br />the second floor, children’s play areas and covered bicycle storage. Phase II includes a smaller <br />community meeting room, children’s play areas and additional covered bicycle storage. Total <br /> <br />estimated project cost for both phases is approximately $17.5 million. <br /> <br />SVDP and HACSA formed a team of local professionals to design and develop Bascom Village. <br />The design team includes Bergsund DeLaney Architecture and Planning, P.C. and Meili <br />construction. SVDP and HACSA take a great deal of care and attention in designing <br />developments that will enhance existing neighborhoods. In addition, each has strong histories of <br />dependable and solid property management. Both vigorously screen prospective tenants (more so <br />than market rate owners). <br /> <br />