Laserfiche WebLink
MEMORANDUM <br /> <br />July 19, 2004 <br /> <br />TO: Hearings Official <br /> <br />FROM: Mark Schoening, City Engineer <br /> <br />SUBJECT: PROPOSED SIDEWALKS, CURBS, GUTTERS, CONDUIT, STORM <br /> DRAINAGE SYSTEM ON SANTA CLARA AVENUE FROM RIVER ROAD TO <br /> APPROXIMATELY 600 FEET WEST (JOB ~4'108) <br /> <br />BACKGROUND <br /> <br />The project was petitioned by three Irrevocable Petitions received by the City, in October 1989 and <br />September 1989. These petitions represent 81.13% of the assessable frontage within the boundaries <br />of the proposed Local Improvement District (LID). St. Vincent DePaul has recently completed the land <br />use approvals to construct a 60 unit Iow income residential development just west of the proposed LID. <br />In addition, City of Eugene Fire Station #11 is under construction on a parcel representing 16.82% of <br />the frontage in the LID. Within the boundaries of the proposed LID there is no sidewalk, only curb and <br />gutter on a portion of the North side of the street. Lane County completed street improvements to Santa <br />Clara Avenue in 2003 immediately west of the proposed LID. In anticipation of the increased traffic from <br />development of the new Fire Station and of the St. Vincent DePaul residential development, the City <br />Engineer initiated the preparation of plans and specifications, pursuant to Section 7.160(8) of the <br />Eugene Code, 1971 on February 20, 2004. The LID improvements would bring Santa Clara Avenue up <br />to full City standards and run from the easterly end of the County's project approximately 600 feet west <br />to River Road, and are proposed to meet the current and future pedestrian, bicycle and vehicular needs <br />in this developing area of the community. <br /> <br />Bids were opened on July 1,2004, with Brown Contracting, Inc. as the apparent Iow bidder. The <br />property owners were notified of the pending LID hearing ten (10) days prior to the hearing as required <br />by Municipal Code. The LID formation hearing on July 19, 2004, is to review the bid information, <br />confirm whether the LID should be formed and to identify any special conditions that should be included <br />in the resolution forming the LID. <br /> <br />CORRESPONDENCE <br /> <br />City staff has not received any phone calls from property owners wanting to attend the hearing and no <br />written correspondence has been received as of 5:00 July 19, 2004. <br /> <br /> PROJECT <br /> <br /> Staff is proposing to upgrade this portion of Santa Clara Avenue from River Road to approximately 600 <br /> feet west, to City standards. The proposed street improvements include constructing curbs, gutters and <br /> sidewalks on the north and south sides of Santa Clara from River Road to 600 feet west. Due to the <br /> <br /> <br />