My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4: Ord. on Rexius-Amazon Meadows Metro Plan Amend
COE
>
City of Eugene
>
Council Agendas 2012
>
CC Agenda - 03/12/12 Meeting
>
Item 4: Ord. on Rexius-Amazon Meadows Metro Plan Amend
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 10:28:35 AM
Creation date
3/8/2012 4:34:49 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
3/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Based on these findings, and the additional analysis provided in the applicant’s written statement <br />and supporting materials, the proposal will not make the Metro Plan internally inconsistent, and is <br />in fact encouraged and supported by a variety of policies as noted above. <br /> <br /> EC 9.8865(1): The proposed change is consistent with applicable provisions of the Metro <br />Plan. The written text of the Metro Plan shall take precedence over the Metro Plan <br />diagram where apparent conflicts or inconsistencies exist. <br /> <br />Approval of the zone change is dependent upon approval of the Metro Plan diagram amendment <br />to re-designate 27.9 acres of the site from the Light-Medium Industrial designation to a <br />combination of Low-Density Residential, Medium-Density Residential and Commercial. With <br />concurrent approval of the proposed diagram amendment, the proposed zone change will be <br />consistent with the corresponding Metro Plan designations. The plan amendment findings, above, <br />demonstrate compliance with remaining provisions of the Metro Plan as required under this <br />criterion and as such, those findings are also incorporated herein, by reference. <br /> <br /> EC 9.8865(2): The proposed zone change is consistent with applicable adopted <br />refinement plans. In the event of inconsistencies between these plans and the Metro <br />Plan, the Metro Plan controls. <br /> <br />As noted above, approval of the zone change is dependent upon approval of the concurrent Metro <br />Plan diagram amendment. The Bethel-Danebo Neighborhood Refinement Plan, Phase 2 is the <br />applicable adopted refinement plan for this area. However, it does not include an adopted land <br />use diagram or any policies which serve as approval criteria for the request. <br /> <br /> EC 9.8865(3): The uses and density that will be allowed by the proposed zoning in the <br />location of the proposed change can be served through the orderly extension of key <br />urban facilities and services. <br /> <br />Key urban facilities and services referred to in the above criterion are defined in the Metro Plan as <br />including wastewater, stormwater, transportation, water, fire and emergency medical services, <br />police protection, City-wide parks and recreation programs, electric service, land use controls, <br />communication facilities, and public schools on a district-wide basis (see Metro Plan page V-3). <br /> <br />The uses and density that will be allowed by the proposed R-1, R-2 and C-2 zoning can be served <br />by wastewater, stormwater, and transportation systems as demonstrated in the applicant’s <br />materials and confirmed in referral comments from the City’s Public Works Department. Public <br />Works referral comments indicate that an 18-inch diameter wastewater line is adjacent to the site <br />in Bailey Hill Road; an 8-inch wastewater line is located at Janisse Street and Dani Street, and a 30- <br />inch wastewater line runs along the south property line and north in Wallis Street. Public Works <br />staff also indicates that there are a pair of 72-inch stormwater pipes in Bailey Hill Road discharging <br />into the Amazon Channel; a 30-inch stormwater pipe extending north from the Logan Lane street <br />stub to an outfall into the Amazon Channel (through the subject site), and a 24, 30 and 36-inch <br />pipe in Wallis Street also draining to the Amazon Channel. <br /> <br /> <br />Findings – Rexius Site/Amazon Meadows Page 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.