My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: Expenditure Review Panel FY11 Report
COE
>
City of Eugene
>
Council Agendas 2012
>
CC Agenda - 04/25/12 Meeting
>
Item A: Expenditure Review Panel FY11 Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2012 3:52:47 PM
Creation date
4/20/2012 2:27:43 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/25/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
View images
View plain text
Background: The Agency assembled the two half-blocks that were used to develop the Broadway Place mixed- <br />use project. Agency funds in the amount of $2.5 million were contributed to the parking structure <br />construction costs. The City sold development rights for housing to be constructed on top of the parking <br />structures. The Broadway Place mixed-use project includes 170 apartment units, ground floor commercial <br />space, and 740 structured parking spaces. It is a major anchor for the west-end of downtown and a popular <br />residential destination with very low vacancy rates. Availability of parking was a contributing factor to <br />Enterprise Rent-A-Car locating downtown and employing 300 people. <br />Chapter 6. The Agency will support the Broadway Place Garages by making the annual debt payments (both <br />principal and interest), which will secure the financial stability of the garages, enhance safety services, and <br />relieve the struggling Parking Fund within the City of Eugene. The support will take place starting in <br />FY2010/2011. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).