Laserfiche WebLink
<br /> <br /> <br />C.Work with Look Me In The Eye. Capstone agrees to work with Look Me In The Eye, a <br />disability advocacy organization, to identify opportunities to employ their clients as part of <br />the housing development. Attachment B provides information from Capstone to Look Me In <br />The Eye. <br /> <br /> <br />D.Provide access to unused parking. If the surface and structured parking is not fully utilized, <br />Capstone agrees to provide parking for Olive Plaza or public use at market pricing. <br /> <br /> <br />4.Issue: Support for Alternative Modes of Transportation <br />Status: The City of Eugene code includes a number of requirements that support alternative <br />modes of transportation. In addition to meeting code requirements for bike parking, Capstone <br />has agreed to: <br /> <br /> <br />A.Include additional bike parking and secured storage, a shared public car facility (such as <br />“WeCar”) and an electric vehicle charging station. Capstone will promote these alternative <br />modes to the residents of the development. Capstone will present the additional bike parking <br />for City of Eugene staff review. <br /> <br />th <br /> <br />B.Construct a new bus stop on Willamette Street south of 12 Avenue. The new stop will <br />include a shelter and will be integrated with the new student buildings south of the 12th <br />Avenue crossing at Willamette Street. This new stop is anticipated to minimize the impact <br />upon the downtown station which has been an issue with the Olive Plaza residents. The <br />design of the stop will be coordinated with Lane Transit District and City of Eugene staff. <br /> <br /> <br />C.Coordinate with the City’s Bicycle Pedestrian Master Plan Study. Capstone has agreed to <br />coordinate with the City of Eugene’s Bicycle Pedestrian Master Plan Study regarding paths <br />to the University of Oregon from downtown, such as by providing data on bike use or <br />surveying residents. <br /> <br /> <br />5.Issue: Design and Construction <br />Status: Capstone has agreed to: <br /> <br /> <br />A.Improve the existing sidewalks surrounding the project. Capstone will expand the <br />circulation space and new streetscape elements to provide for a more inviting pedestrian <br />environment. Capstone will also work with City of Eugene staff to see if expansion of the <br />existing right-of way is desired in this location. In addition, Capstone has agreed to provide <br />signage to improve enforcement of the prohibition of bikes and skateboards on the sidewalk <br />near Olive Plaza (Attachment A). <br /> <br /> <br />B.Retain as many existing street trees as possible. Capstone will work with the City Arborist to <br />establish specific tree and root pruning and care instructions to minimize impact to the trees <br />and retain as many existing trees as possible. In the case an existing tree is required to be <br />removed, it will be replaced with a like species. <br /> <br /> <br />C.Consistent with Capstone policy, the use of qualified local contractors, suppliers and <br />workers will be encouraged as much as possible. <br /> <br /> S:\CMO\2012 Council Agendas\M120425\S120425B.doc <br /> <br />