My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Action - Ratification of FY13 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2012
>
CC Agenda - 05/14/12 Meeting
>
Item 3: Action - Ratification of FY13 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2012 5:38:09 PM
Creation date
5/10/2012 5:11:19 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/14/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MetropolitanWastewaterManagementCommissionCapitalImprovementProgram <br />TheCapitalReserveaccumulatesrevenuetohelpfundcapitalprojects,includingmajor <br />rehabilitation,toreducetheamountofborrowingnecessarytofinancecapitalprojects. <br />TheAMCPconsistsofthreeprogramsmanagedbytheCityofEugeneandfundedthrough <br />regionalwastewateruserfees:TheEquipmentReplacementProgram,whichfundsreplacement <br />ofequipmentvaluedatorover$10,000butlessthan$200,000;TheMajorRehabilitation <br />Program,whichfundsrehabilitationofplantinfrastructuresuchasroofreplacements,structure <br />coatings,etc.;andtheMajorCapitalOutlayProgramforcapitalitems(neworreplacement)with <br />costsgreaterthan$200,000.TheMWMCassetsaretrackedthroughouttheirlifecycleusing <br />assetmanagementtrackingsoftware.Basedonthisinformation,thethreeAMCPprogramannual <br />budgetsareestablishedandprojectedforthefive-yearCapitalPlan. <br />Forplanningpurposes,theMWMCmustconsidermarketchangesthatdrivecapitalproject <br />expenditures.Specifically,theCIP’sCapitalPlanreflectsprojectedpricechangesovertimethat <br />affectthecostofmaterialsandservices.Untilabout2003,the20-cityaverageEngineeringNews <br />RecordConstructionCostIndex(ENRCCI)servedasagoodpredictorforfutureinflationand <br />wasusedforprojectingtheMWMC’sconstructioncosts.Accordingly,constructioncost <br />projectionsconsideredinthe2004FPwerebasedonJanuary2004,20-cityaverageENRCCI. <br />However,intheperiod2004through2008,constructioninflationacceleratednationallywith <br />localconstructioncostinflationacceleratingevenfasterthanthenationalaverage.Cityof <br />Springfieldstaffidentifiedthistrendin2005andsubsequentlymodifiedtheirinflationary <br />projectionmethodologyaccordingly. <br />Inearly2006,theMWMChiredtheconsultingfirmCH2MHilltoperformacomprehensive <br />updateofprojectcostestimates.Sincethe2006update,theRWP’sCIPhasassumedageneral <br />priceincreaseoffive-percent-per-yearovertheplanningperiod. <br />TheMWMCcontinuestomonitorinflationarytrendstoinformourforecastingofcapital <br />improvementcosts.Indoingso,theCityofSpringfieldstaffhaveobservedthatwhileinthelast <br />fewyearstheconstructionbiddingclimatehasbeenfavorablewhencomparedtoengineering <br />estimates,mostrecentlybidshavecomeinclosertoengineeringestimates. <br />RegionalWastewaterCapitalProgramStatusandBudget <br />CIPProjectStatusandBudget <br />TheproposedFY12-13CIPbudgetiscomprisedoftheindividualproposedbudgetsforeachof <br />theactive(carryover)orstarting(new)projectsinthefirstyearofthe5-yearCapitalPlan.The <br />totaloftheseFY12-13projectbudgetsis$21,587,796.Eachcapitalprojectrepresentedinthe <br />FY12-13BudgetisdescribedindetailinaCIPprojectsheetthatcanbefoundattheendofthis <br />document.Eachprojectsheetprovidesadescriptionoftheproject,theproject’spurposeand <br />driver(thereasonfortheproject),thefundingschedulefortheproject,andtheproject’sexpected <br />finalcostandcashflow.Forthoseprojectsthatareinprogress,ashortstatusreportisincluded <br />ontheprojectsheet. <br />Page39PreliminaryFY12-13BUDGETANDCIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.