My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3: Action - Ratification of FY13 MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2012
>
CC Agenda - 05/14/12 Meeting
>
Item 3: Action - Ratification of FY13 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2012 5:38:09 PM
Creation date
5/10/2012 5:11:19 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/14/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MetropolitanWastewaterManagementCommissionCapitalImprovementProgram <br />REPAIRAND/ORPARTIALREPLACEMENTOFBIOSOLIDSFORCEMAIN <br />Description: <br />Investigate,repair,and/orreplacesectionsofthebiosolidsforcemain(pipingsystem) <br />wherestruvitedepositsreducethepipediameterandcannotberemovedbyanacid <br />washingmethod.ThepipingsystemconnectstheWaterPollutionControlFacility(WPCF) <br />totheBiosolidsManagementFacility(BMF).Aprojectestimateis$1.5millionthatmay <br />requireadditionalfundingafterfurtherevaluationofthesystem. <br />Status: <br />AsofDecember27,2011,maintenancestaffiscollectinginformationneartheaccess <br />locationsabouttheconditionoftheexistingMWMCbiosolidsforcemain(pipingsystem). <br />Theinformationwillbeusedforprojectscopedetailsrelatedtoconsultantand <br />constructionservices. <br />Justification: <br />Maintainsystemreliability.TheprojectwillrehabilitateportionsoftheexistingMWMC <br />biosolidsconveyancesystem(WPCFtoBMF). <br />ProjectDriver: <br />Maintainsystemfunctionalityofthebiosolidsconveyancesystem. <br />ProjectTrigger: <br />Functionalityandcapacityissueswithintheexistingpipeline. <br />ProjectType: <br />100%Rehabilitation <br />EstimatedProjectCost: <br />$1,500,000 <br />ExpectedCashFlow: <br />FY11-12=$150,000;FY12-13=$1,250,000;FY13-14=$100,000 <br />Prior2011-12 <br />Expenditure/Category:YearsEst.Act.2012-132013-142014-152015-162016-17Total <br />Design/Construction$0$150,000$1,350,000$0$0$0$0$1,500,000 <br />Other$0$0$0$0$0$0$0$0 <br />TotalCost$0$150,000$1,350,000$0$0$0$0$1,500,000 <br />Page47PreliminaryFY12-13BUDGETANDCIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.