My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-12-14
COE
>
City of Eugene
>
Administrative Orders
>
2012
>
Admin Order 58-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 2:23:00 PM
Creation date
11/7/2012 2:09:00 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
11/2/2012
Document_Number
58-12-14
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />LIST OF APPENDICES <br />Appendix A Capital Project Fact Sheets <br />Appendix B Hydrologic/Hydraulic Model Output Tables <br />Appendix C Methodology for Estimating the Effective Impervious Area of Urban Watersheds <br />Appendix D Capital Project Unit Cost Tables <br />Appendix E Evaluation of UICs (i.e., Drywells) with Respect to High Groundwater <br />Appendix F Rain Garden Sizing Calculations and Plan Views for Six ROW Options <br />Appendix G Summary of Model Refinements Since the Initial 2002 Study <br />Appendix H River Road Santa Clara Stormwater Management Strategy Development Map <br />Appendix I Public Comments and Responses <br />LIST OF TABLES <br />Table 2 -1 <br />Average Storm Event ............................................................ ............................... <br />2 -8 <br />Table 2 -2 <br />Existing Land Use — River Road Santa Clara Basin ............. ............................... <br />2 -9 <br />Table 2 -3 <br />Buildout Land Use General ................................................ ............................... <br />2 -10 <br />Table 2 -4 <br />River Road Santa Clara Basin Slope Distribution .............. ............................... <br />2 -13 <br />Table 2 -5 <br />Summary of Stormwater Quality Monitoring in Eugene .... ............................... <br />2 -21 <br />Table 2 -6 <br />Soil Permeability in the River Road Santa Clara Basin ...... ............................... <br />2 -26 <br />Table 2 -7 <br />Runoff Potential in the River Road Santa Clara Basin ....... ............................... <br />2 -27 <br />Table 2 -8 <br />Hydric Soils in River Road Santa Clara Basin ................... ............................... <br />2 -28 <br />Table 3 -1 <br />Major Hydrologic Input/Output Data for the River Road Santa Clara <br />Storm Drainage System ...................................................... ............................... <br />3 -17 <br />Table 3 -2 <br />Hydraulic Performance of the River Road Santa Clara Storm <br />DrainageSystem ................................................................. ............................... <br />3 -19 <br />Table 3 -3 <br />Rainfall Data Used for the Model Validation ....................... ............................... <br />3 -7 <br />Table 3 -4 <br />Model Adjustments and Associated Model Results for Node 74406 .................. <br />3 -8 <br />Table 3 -5 <br />Capacity Deficiencies Identified Through Modeling and Proposed <br />Capital Projects to Address Them ....................................... ............................... <br />3 -11 <br />Table 3 -6 <br />Capital Project Options Selected to Address Decommissioning of <br />Drywell .............................................................................. ............................... <br />3-14 <br />Table 4 -1 <br />Summary of Increased ROW Required for Six Different On- Street <br />RainGarden Options ........................................................... ............................... <br />4 -17 <br />Table 6 -1 <br />Summary of Capital Project Costs and Funding ................... ............................... <br />6 -6 <br />LIST OF FIGURES <br />Figure 1 -1 <br />Process to Develop the Integrated Stormwater Management Strategies ............. <br />1 -8 <br />Figure 1 -2 <br />CIP/Master Planning Phase Process for the River Road Santa Clara Basin........ <br />1 -9 <br />Figure 2 -1 <br />Willamette Region Location Map ......................................... ............................... <br />2 -3 <br />Figure 2 -2 <br />Basin Location Map .............................................................. ............................... <br />2 -5 <br />Figure 2 -3 <br />Average Monthly Rainfall .................................................... ............................... <br />2 -7 <br />Figure 2 -4 <br />Surface Cover in the River Road Santa Clara Basin UGB . ............................... <br />2 -13 <br />Figure 2 -5 <br />Water Quality Monitoring Sites .......................................... ............................... <br />2 -19 <br />N:ASTORMWATER \City of EugencARR_SC Stormwater Basin Plan\2012 Document \Master_ Plan _9- 18- 12_DR-AFT Word Version.doc iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.