My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-12-14
COE
>
City of Eugene
>
Administrative Orders
>
2012
>
Admin Order 58-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 2:23:00 PM
Creation date
11/7/2012 2:09:00 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
11/2/2012
Document_Number
58-12-14
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 Integrated Stormwater Management Strategy <br />Multiple Obiective Stormwater Capital Improvement Program <br />It should be noted that, in general, all stormwater capital projects, will consider flood control, <br />water quality and natural resources protection and enhancement as project objectives when <br />feasible and appropriate. All stormwater capital projects will conform to adopted code <br />requirements for private development, including stormwater quality standards. <br />6.2 Summary of Strategy Benefits <br />The River Road Santa Clara integrated strategy, when finalized and implemented, is expected to <br />provide the following benefits: <br />1. Provide the required level of flood protection basin -wide through capital projects. <br />2. Reduce existing pollutant loads through capital projects. <br />3. Reduce the potential for increased pollutant loads and erosive impacts to stream channels <br />that would be associated with increased flows from drywell decommissioning. <br />4. Reduce pollutant loads associated with new developments through development <br />standards. <br />5. Identify, protect and manage significant open waterways for their beneficial stormwater <br />functions. <br />6. Address compliance issues associated with the Clean Water Act and Safe Drinking Water <br />Act. <br />6.3 Summary of Strategy Implementation and Costs <br />For a description of implementation of water quality and stormwater related natural resources <br />standards, refer to Volume I — Citywide Basin Master Plan Report. <br />This section provides a summary of the estimated costs for each of the capital projects in the <br />River Road Santa Clara Basin. It also describes the approach for capital project implementation. <br />The list of capital projects in Table 6 -1 is a summary of the full list of projects identified from <br />the basin planning process, and includes planning level cost estimates. Appendix A contains a <br />more detailed fact sheet for each capital project, which includes a description of the project and <br />assumptions made for purposes of estimating costs. Unit cost tables utilized for these estimates <br />are provided in Appendix D. <br />The actual cost split for each project between the City and Lane County will be determined on a <br />project -by- project basis, and was not estimated as a part of this planning process. At the time of <br />completion of this report, there is no identified funding mechanism in the County to pay for the <br />County's portion of the capital improvement projects identified in this basin plan. The City will <br />fund its portion of the projects identified in this basin plan primarily through a combination of <br />stormwater user fees and systems development charges. <br />0: 25695978 Eugene RR -SC Final Basin P1an\Master P1anTINAL 2- 2010\Master_Plan 3- 11- 10_FINAL_ Word _Version.doc 6 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.