My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-12-14
COE
>
City of Eugene
>
Administrative Orders
>
2012
>
Admin Order 58-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 2:23:00 PM
Creation date
11/7/2012 2:09:00 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
11/2/2012
Document_Number
58-12-14
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 <br />Introduction <br />Step 1 <br />Compile Basin <br />Characteristics <br />Step 2 <br />Problem Identification <br />(Existing & Future) <br />Step 5 <br />Evaluate Cps to Address <br />Existing Problems <br />• Flood Control <br />• Water Quality <br />• Natural Resources <br />• Hydrologic Impacts <br />• Maintenance <br />Step 3 <br />Identify Basin Guidelines and <br />Potential SW Management <br />Tools <br />Step 4 <br />Initial Feasibility Screening <br />Figure 1 -1 <br />Process to Develop the <br />Integrated Stormwater <br />Management Strategies <br />Evaluate Cps to <br />Evaluate Development <br />Address Future <br />Standards to Address <br />Problems/ <br />Future Problems/ <br />Opportunities <br />Opportunities <br />Step 7 <br />Select a Basin Strategy <br />Step 8 <br />Develop a Maintenance <br />Strategy <br />Step 9 <br />Public Involvement <br />Compare Cps with <br />Development Standards <br />• effectiveness <br />• costs <br />Step 12 <br />Develop Ordinance Language <br />Step 10 <br />Prioritize CP Solutions for <br />Implementation and Conduct <br />a Financial Analysis <br />Step 11 <br />Develop Master Plans <br />Step 13 <br />Develop BMP Manual <br />N:ASTORMWATER \City of EugencARR_SC Stormwater Basin Plan\2012 Document \Master_ Plan _9- 18- 12_DR-AFT Word Version.doc 1_8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.