My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-12-14
COE
>
City of Eugene
>
Administrative Orders
>
2012
>
Admin Order 58-12-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2012 2:23:00 PM
Creation date
11/7/2012 2:09:00 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
11/2/2012
Document_Number
58-12-14
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 5 <br />STORMWATER FACILITIES <br />CONSTRUCTION COST ESTIMATE <br />BACK -UP INFORMATION <br />Construction <br />Activity/Materials <br />Units <br />$/Unit <br />Manual Labor <br />Labor -Hr <br />$35 <br />Traffic Control <br />Labor -Hr <br />$32 <br />Gravel Access Road <br />SF <br />$4.37 <br />Clearing & Grubbing <br />AC <br />$2,300 <br />General Excavation <br />CY <br />$17 <br />Grading <br />CY <br />$6 <br />Inlet Cone & Structure <br />EA <br />$4,025 <br />Trash Rack Structure <br />EA <br />$8,050 <br />Pond Outlet <br />EA <br />$5,750 <br />Curb & Gutter <br />LF <br />$14 <br />Hydroseed <br />AC <br />$2,300 <br />Trees & Shrubs <br />EA <br />$58 <br />Geotextile Fabric <br />SY <br />$2.01 <br />Rip Rap <br />TN <br />$69 <br />Chain Link Fence <br />LF <br />$20 <br />Erosion Control <br />AC <br />$2,300 <br />Drain Rock <br />CY <br />$30 <br />Crushed Rock <br />CY <br />$25 <br />Truck Haul (Disposal) <br />CY <br />$21 <br />Perforated Drain Pipe <br />LF <br />$30 <br />Cedar Savings <br />CY <br />$25 <br />Note 1: The above costs (originally prepared in 1999) were updated in 2007 with an across the <br />board increase of 15 %. <br />Note 2: The above are representative unit costs based on information collected from bid <br />tabulation sheets from two years (1997 -1999) in the Eugene, Lebanon and Portland areas. These <br />costs are representative of average conditions and assume that the CP projects are competitively <br />bid. Unit costs include materials and installation. Actual construction cost will vary with site <br />conditions and local factors at time of bidding. <br />Unit cost for trees assumes bare root stock with temporary water for 2 -3 years. <br />Note 3: With respect to Natural Resource Enhancement and Open Waterway Improvement <br />Construction Costs (not included in this table), unit costs were revised (Nov. 2001) for clearing & <br />grubbing, hydroseeding, trees & shrubs, and erosion control. See attached addendum. <br />Reference: <br />Table 5 (Unit Cost) x Table 6 (Quantities) = Table 7 (Unit Cost per CIP Type) <br />
The URL can be used to link to this page
Your browser does not support the video tag.