Laserfiche WebLink
TABLE 9 <br />STORMWATER FACILITIES <br />ESTIMATED ANNUAL MAINTENANCE COSTS <br />Frequency <br />Effort/Time <br />Equip. /Time <br />Times/Year <br />Lb -Hr <br />$ <br />@ $46/hr <br />Hours <br />$/hr Rate <br />$ Total Comments <br />Trash Rack Inlet (Type 1 & 2) <br />Emergency Response <br />10 <br />1 <br />$ <br />460.00 <br />0 <br />$ - <br />$ - <br />Inspect & Clean In1eU0utlet <br />4 <br />4 <br />$ <br />736.00 <br />2 <br />$ 172.50 <br />$ 1,380.00 Vactor Truck & Operator <br />Routine Repair <br />$ <br />- <br />$ - <br />$ - <br />Maintain Vegetation <br />4 <br />2 <br />$ <br />368.00 <br />2 <br />$ 11.50 <br />$ 92.00 Mower, Weedeater, Etc. <br />Disposal Costs <br />4 <br />$ <br />46.00 <br />$ - <br />$ <br />Subtotals <br />$ <br />1,610.00 <br />$ 1,472.00 <br />Total Estimate Annual Maintenance <br />$ 3,082.00 <br />Open Channel (Type 1 & 2) <br />Inspect Vegetation & Sediment Loading <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ <br />Maintain Vegetation <br />$ <br />- <br />$ - <br />$ - <br />Remove Debris /Garbage <br />4 <br />2 <br />$ <br />368.00 <br />0 <br />$ - <br />$ - <br />Remove Sediment <br />1 <br />8 <br />$ <br />368.00 <br />4 <br />$ 345.00 <br />$ 1,380.00 Tractor Shovel, 10 CY Dump & Operators <br />Disposal Costs <br />1 <br />$ <br />920.00 <br />$ - <br />$ - Assumes 10 CY/Year <br />Inspect Slopes <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Repair Slopes (On Going Activity) <br />$ <br />575.00 <br />0 <br />$ - <br />$ Annual Misc. Cost <br />Subtotals <br />$ <br />2,415.00 <br />$ 1,380.00 <br />Total Estimate Annual Maintenance <br />$ 3,795.00 <br />Dry Extended Pond <br />Inspect & Clean In1eU0utlet <br />4 <br />4 <br />$ <br />736.00 <br />2 <br />$ 172.50 <br />$ 1,380.00 Vactor Truck & Operator <br />Inspect Vegetation <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Remove Debris /Garbage <br />4 <br />2 <br />$ <br />368.00 <br />0 <br />$ - <br />$ - <br />Maintain Vegetation <br />4 <br />4 <br />$ <br />736.00 <br />4 <br />$ 11.50 <br />$ 184.00 Mower, Weedeater, Etc. <br />Inspect Sediment Loading <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Remove Sediment <br />0.5 <br />12 <br />$ <br />276.00 <br />6 <br />$ 345.00 <br />$ 1,035.00 Tractor Shovel, 10 CY Dump & Operators <br />Disposal Costs <br />0.5 <br />$ <br />920.00 <br />$ - <br />$ - Assumes 10 CY Every Two Years <br />Inspect slopes <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Repair Slopes (On Going Activity) <br />$ <br />575.00 <br />$ - <br />$ Annual Misc. Cost <br />Subtotals <br />$ <br />3,88700 <br />$ 2,599.00 <br />Total Estimate Annual Maintenance <br />$ 6,486.00 <br />Wet Extended Pond <br />Inspect & Clean In1eU0utlet <br />4 <br />4 <br />$ <br />736.00 <br />2 <br />$ 172.50 <br />$ 1,380.00 Vactor Truck & Operator <br />Inspect Vegetation <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Remove Debris /Garbage <br />4 <br />2 <br />$ <br />368.00 <br />0 <br />$ - <br />$ - <br />Maintain Vegetation <br />4 <br />4 <br />$ <br />736.00 <br />4 <br />$ 11.50 <br />$ 184.00 Mower, Weedeater, Etc. <br />Inspect Sediment Loading <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Remove Sediment <br />0.5 <br />12 <br />$ <br />276.00 <br />6 <br />$ 345.00 <br />$ 1,035.00 Tractor Shovel, 10 CY Dump & Operators <br />Disposal Costs <br />0.5 <br />$ <br />460.00 <br />$ - <br />$ - Assumes 10 CY Every TwoYears <br />Inspect slopes <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Repair Slopes <br />$ <br />575.00 <br />$ - <br />$ Annual Misc. Cost <br />Subtotals <br />$ <br />3,427.00 <br />$ 2,599.00 <br />Total Estimate Annual Maintenance <br />$ 6,026.00 <br />Flood Control Facility <br />Inspect & Clean In1eU0utlet <br />4 <br />2 <br />$ <br />368.00 <br />2 <br />$ 172.50 <br />$ 1,380.00 Vactor Truck & Operator <br />Inspect Vegetation <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Remove Debris /Garbage <br />4 <br />1 <br />$ <br />184.00 <br />0 <br />$ - <br />$ - <br />Maintain Vegetation <br />4 <br />4 <br />$ <br />736.00 <br />4 <br />$ 11.50 <br />$ 184.00 Mower, Weedeater, Etc. <br />Inspect Sediment Loading <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Remove Sediment <br />0.5 <br />8 <br />$ <br />184.00 <br />4 <br />$ 345.00 <br />$ 690.00 Tractor Shovel, 10 CY Dump & Operators <br />Disposal Costs <br />0.5 <br />$ <br />230.00 <br />$ - Assumes 5 CY Every two Years <br />Inspect slopes <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Slope Repair (On Going Activity) <br />$ <br />575.00 <br />$ - <br />$ Annual Misc. Cost <br />Subtotals <br />$ <br />2,553.00 <br />$ 2,254.00 <br />Total Estimate Annual Maintenance <br />$ 4,80200 <br />Stormwater Marsh/Wetland <br />Inspect & Clean In1eU0utlet <br />4 <br />4 <br />$ <br />736.00 <br />2 <br />$ 172.50 <br />$ 1,380.00 Vactor Truck & Operator <br />Inspect Vegetation <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Remove Debris /Garbage <br />2 <br />2 <br />$ <br />184.00 <br />0 <br />$ - <br />$ - <br />Maintain Vegetation <br />4 <br />4 <br />$ <br />736.00 <br />4 <br />$ 11.50 <br />$ 184.00 Mower, Weedeater, Etc. <br />Subtotals <br />$ <br />1,748.00 <br />$ 1,564.00 <br />Total Estimate Annual Maintenance <br />$ 3,312.00 <br />Vegetated Swale <br />Inspect & Clean In1eU0utlet <br />4 <br />2 <br />$ <br />368.00 <br />1 <br />$ 172.50 <br />$ 690.00 Vactor Truck & Operator <br />Remove Debris /Garbage <br />2 <br />2 <br />$ <br />184.00 <br />0 <br />$ - <br />$ - <br />Maintain Vegetation <br />4 <br />4 <br />$ <br />736.00 <br />4 <br />$ 11.50 <br />$ 184.00 Mower, Weedeater, Etc. <br />Inspect Sediment Loading <br />2 <br />1 <br />$ <br />92.00 <br />0 <br />$ - <br />$ - <br />Remove Sediment/Regrade <br />1 <br />8 <br />$ <br />368.00 <br />4 <br />$ 345.00 <br />$ 1,380.00 Tractor Shovel, 10 CY Dump & Operators <br />Disposal Costs <br />1 <br />$ <br />92.00 <br />$ - <br />$ Assumes 2 CY Per Year <br />Subtotals <br />$ <br />1,840.00 <br />$ 2,254.00 <br />Total Estimate Annual Maintenance <br />$ 4,094.00 <br />Frequency <br />Effort/Time <br />Equip. <br />/Time <br />Times/Year <br />Lb -Hr <br />$ <br />@ $40/hr <br />Hours <br />$/hr Rate <br />$ Total Comments <br />Infiltration Trench <br />Inspect & Clean In1eU0utlet <br />4 <br />4 <br />$ <br />736.00 <br />2 <br />$ 172.50 <br />$ 1,380.00 Vactor Truck & Operator <br />Remove Debris /Garbage <br />2 <br />2 <br />$ <br />184.00 <br />0 <br />$ - <br />$ - <br />InspectSedimentLoading <br />2 <br />2 <br />$ <br />184.00 <br />0 <br />$ - <br />$ - <br />Remove Sediment <br />0.3 <br />8 <br />$ <br />110.40 <br />4 <br />$ 86.25 <br />$ 103.50 Water Truck (Flush fines) & Operator <br />Disposal Costs <br />0.3 <br />$ <br />28.75 <br />$ - <br />$ Assumes 2 CY Every Three Years <br />Subtotals <br />$ <br />1,214.40 <br />$ 1,483.50 <br />Total Estimate Annual Maintenance <br />$ 2,69290 <br />Water Quality Structures <br />Remove Debris /Garbage <br />2 <br />2 <br />$ <br />184.00 <br />0 <br />$ - <br />$ - <br />InspectSedimentLoading <br />2 <br />2 <br />$ <br />184.00 <br />0 <br />$ - <br />$ - <br />Remove Sediment <br />0.3 <br />8 <br />$ <br />110.40 <br />4 <br />$ 172.50 <br />$ 690.00 Vactor Truck & Operator <br />Disposal Costs <br />4 <br />$ <br />276.00 <br />$ - <br />$ Assumes 3 CY a Year <br />Subtotals <br />$ <br />478.40 <br />$ 690.00 <br />Total Estimate Annual Maintenance <br />$ 1,168.40 <br />