Laserfiche WebLink
To: Therese Walch <br />From: Hernan Rodriguez, PE and Krista Reininga, PE. <br />Date: April 10, 2007 <br />Subj ect: River Road Santa Clara Model Changes <br />As requested by the City, URS has updated the XP -SWMM models developed for the River Road <br />Santa Clara Stormwater Master Plan project (August 2002). Models were updated using survey data <br />collected by Lane County between October and December 2005. Areas surveyed for updating the <br />models were identified in Section 3.0 of the current draft basin plan (August 2002) and during a <br />June 21, 2005 meeting and in a memo to the City from URS dated August 25, 2005. Once the <br />survey was completed, the original subbasin delineations were refined to account for new <br />information. In addition, drainage basins for UIC areas were delineated. The model was then run to <br />simulate conditions both with and without UICs in place. This was done to get an initial idea of <br />whether decommissioning of all UICs would result in additional flooding issues. The purpose of <br />this memo is to summarize the following: <br />• changes to the original model based on new survey information; <br />• changes to the model based on updated subbasin delineations; <br />• methods for modeling UICs; and <br />• results from modeling conditions both with and without UICs. <br />HYDRAULIC CHANGES <br />The following changes were made, based on the new survey data collected between October and <br />December 2005, when updating each subbasin model: <br />Flat Creek Subbasin <br />• Model segment RSFCO20E from node 72765 to 72764 was divided into 3 segments to <br />incorporate the culvert under Hilo Dr. (node 75697 to 75698) that was not included in <br />the original model. The new segment names are RSFCO20Da, RSFCO20Db, and <br />RSFCO20E. <br />• Model segment RSFCO50A from node 72244 to 72799 was divided into 5 segments to <br />incorporate 2 culverts that were not included in the original model. The new segment <br />names are RSFCO50A, RSFCO50B, RSFCO50C, RSFCO50D, and RSFCO50E. <br />Spring Creek Subbasin <br />• Model segment RSSCOIOD from node 85033a to 72012 was divided into 3 segments to <br />incorporate a culvert not included in the original model. The new segment names are <br />RSSC010D, RSSCOlODa, and RSSCOlODb. <br />1 <br />