My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 4-Ord.on Urban Renewal Pln
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-09/13/04Mtg
>
Item 4-Ord.on Urban Renewal Pln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:47:39 PM
Creation date
9/10/2004 3:18:57 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
9/13/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 600 - Project Activities <br /> <br /> In order to achieve the objectives of this plan, the following activities may be undertaken <br /> on behalf of the City of Eugene by the Renewal Agency, in accordance with applicable <br /> Federal, State, County, and City laws, policies, and procedures. <br /> <br />A. PUBLIC IMPROVEMENTS <br /> 1. Street, Curb, and Sidewalk Improvements <br /> Improvements within the renewal area may require the construction of new <br /> street, curb, sidewalks or sidewalk improvements, such as widening, within the <br /> plan area. The Renewal Agency may participate in funding sidewalk and <br /> roadway improvements including design, redesign, construction, resurfacing, <br /> repair and acquisition of right-of way for curbs, streets, and sidewalks, and <br /> pedestrian and bicycle paths. Projects to be undertaken include, but are not <br /> limited to: <br /> · Local street, curb, and sidewalk improvements identified in the Eugene <br /> Capital Improvements Program (ClP), the Vision For a <br /> Greater Downtown Eugene Report, and the Courthouse <br /> District Concept Plan. <br /> · Other curb, sidewalk and street improvements identified by the <br /> Renewal Agency. <br /> <br /> 2. Public Utilities <br /> The development proposed for the renewal area may require the replacement <br /> and construction of water, storm and sanitary sewer facilities, environmental <br /> mitigations. These improvements may include, but are not limited to: <br /> · Sanitary sewer, water, and storm water system upgrades & replacements <br /> identified in Eugene Capital Improvements Program <br /> <br /> 3. Streetscape Projects <br /> This activity will enable the Renewal Agency to participate in activities improving <br /> the visual appearance of the plan area. These improvements may include, but <br /> are not limited to: <br /> · Accent paving <br /> · Decorative lighting <br /> · Street trees, planters, and landscaping <br /> · Furnishings, including tables, benches, kiosks, telephone booths, drinking <br /> fountains, trash receptacles, bicycle racks <br /> · Street and directional signage <br /> · Public art and water features <br /> · Gateway monuments and landscape features <br /> · Undergrounding of overhead utilities <br /> <br />DRAFTAMENDMENTS- Urban Renewal Plan For - 6 - <br />Central Eugene <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.