My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: South Willamette Street Improvement Plan
COE
>
City of Eugene
>
Council Agendas 2013
>
CC Agenda - 01/30/13 Work Session
>
Item A: South Willamette Street Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2013 2:26:31 PM
Creation date
1/25/2013 2:08:47 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
1/30/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Priority Bikeway System Project #296 – Striped bike lanes, Willamette Street from 18 <br />th <br />Avenue to 32 Avenue (unprogrammed). <br />nd <br /> <br />Eugene Pedestrian Bicycle Master Plan (2012) <br /> <br />Policy 1.1: Make bicycling and walking more attractive than driving for trips of two miles or less. <br /> <br />Policy 1.2: Increase pedestrian and bicycle connectivity between existing residential <br />neighborhoods and nearby commercial areas, parks, and schools. <br /> <br />Policy 1.5: Construct high-quality pedestrian and bicycle infrastructure to provide safer, more <br />appealing and well-connected facilities. <br /> <br />Policy 1.6: Build pedestrian and bicycle facilities on new roadways, and retrofit older roadways <br />to complete the pedestrian and bicycle system, using routes and facility designs identified in this <br />plan. <br /> <br />Policy 1.7: Construct bikeways along new and reconstructed arterial and major collector streets. <br /> <br />Policy 2.1: Continually improve bicycling and walking comfort and safety through design, <br />operations and maintenance including development of “low stress” bikeways to attract new <br />cyclists. <br /> <br />Policy 3.6: Improve the quality of the pedestrian environment by including facilities such as <br />planter strips and street trees in the design or reconstruction of streets and consider preservation <br />of existing trees whenever practicable. <br /> <br />20 Minute Neighborhoods Program: Development of a 20-Minute Neighborhoods Program is <br />considered a key implementation step of the Climate and Energy Action Plan. 20- minute <br />neighborhoods are places where people can easily walk or bike to key destinations such as <br />grocery stores, other retail establishments, parks and schools. Coordination between <br />implementation of the Pedestrian and Bicycle Master Plan and the 20-Minute Neighborhoods <br />Program will be critical to the success of both. The 20-Minute Neighborhoods Program should be <br />one factor that is considered when determining project funding priorities. <br /> <br />Bike Lane Project #31 – Willamette Street from 17 Avenue to 32 Avenue. <br />thnd <br /> <br />Bike Boulevard Project #397 – Portland Alley from W24 Avenue to W27 Avenue. <br />thth <br /> <br />Bike Boulevard Project #458 – E 29th Place/Pearl Street/E 28th Avenue/High Street/E 27th <br />Avenue from Amazon Parkway to Willamette Street. <br /> <br />Envision Eugene (2012) <br /> <br />7 Pillars of Envision Eugene (partial list) <br /> <br />Provide ample economic opportunities for all community members <br /> <br /> S:\CMO\2013 Council Agendas\M130130\S130130A.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.