My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item C: Review of Implementation of Street Bond Measure
COE
>
City of Eugene
>
Council Agendas 2013
>
CC Agenda - 02/20/13 Work Session
>
Item C: Review of Implementation of Street Bond Measure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2013 9:41:51 AM
Creation date
2/14/2013 3:09:18 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24th Avenue from Jefferson Street to Chambers Street <br />Project Description: This project consisted of reconstruction of 24 Avenue from Jefferson <br />Street to Chambers Street in south Eugene. This work on 24th Avenue was combined with a <br />local gas tax funded project to rehabilitate Jefferson Street from 19th Avenue to 24th Avenue <br />and reconstruct Jefferson Street from 25th Avenue to 28th Avenue. <br />Treatment Methodology: Pavement testing recommended the section from Jefferson Street to <br />Chambers Street needed to be reconstructed due to the poor condition of the street surfacing, <br />which was exhibiting load- related cracking distress in the eastbound lane some cracking <br />distress in the westbound lanes, except extensive cracking distress was observed in both lanes <br />from Polk Street to Chambers Street. Rather than reconstruct this street with conventional <br />methods, it was decided to reconstruct this street using the in -place recycling technique (see <br />Key Terms) with the cement - treated base and then paving with 7 inches of warm mix asphalt <br />pavement. <br />Costs: Total project costs, from all funding sources, are estimated at $942,000. <br />Total Bond Funds Programmed to the Project = $ 622,000 <br />Total Projected /Actual Bond Funds Used = $ 934,000 <br />Difference = $ - 312,000 <br />Prior to budgeting for the bond measure, preliminary testing determined this street could be <br />rehabilitated with a mix of inlay, spot repair reconstruction and partial depth reconstruction. <br />Upon scheduling this project for construction, the street had very quickly deteriorated and full <br />depth reconstruction was recommended based on further testing. While the project costs are <br />higher than originally anticipated when the street repair bond was developed, using the <br />reclamation technique for construction was significantly less expensive than a conventional <br />reconstruction, which was estimated to be approximately $1,222,000. <br />Additional Sources of Funding: Stormwater and wastewater utility funds. <br />Project Photos: <br />24th Avenue pre- construction <br />24th Avenue post- construction <br />2012 SRRP REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.