Laserfiche WebLink
Curtis Avenue from Norkenize Road to 550 feet East (cul -de -sac) <br />Project Description: This project included reconstruction of Curtis Street in northeast Eugene <br />from Norkenzie Road to 550 feet east to the end of the cul -de -sac. <br />Treatment Methodology: Sections of this street were in poor condition and pavement testing <br />and evaluation showed that the street needed partial depth reconstruction (removal of asphalt <br />pavement and a portion of the underlying base rock). <br />Costs: Total project costs, from all funding sources, are estimated at $91,000. <br />Total Bond Funds Programmed to the Project = $38,000 <br />Total Projected /Actual Bond Funds Used = $91,000 <br />Difference = $ - 53,000 <br />In testing this street, it was determined that the subgrade soils and thin pavement were too <br />weak to support construction traffic and future traffic loading and the street needed a more <br />expensive treatment than originally anticipated when the street repair bond was developed. <br />Additional Sources of Funding: None. <br />Project Photos: <br />Curtis Avenue pre- construction <br />Curtis Avenue post- construction <br />2012 SRRP REPORT <br />