My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item C: Review of Implementation of Street Bond Measure
COE
>
City of Eugene
>
Council Agendas 2013
>
CC Agenda - 02/20/13 Work Session
>
Item C: Review of Implementation of Street Bond Measure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2013 9:41:51 AM
Creation date
2/14/2013 3:09:18 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Council set goals in 2011 for waste reduction by requiring that the quantity of materials placed in <br />landfills be reduced. In addition to using WMA, Public Works conducted two pilot projects <br />specifying that reclaimed asphalt shingles (RAS) be used as a binder in the asphalt mix, thereby <br />keeping this material from entering the waste stream. The City continues to use warm mix asphalt <br />and in -place recycling techniques to improve the quality, environmental footprint, and cost efficiency <br />of the street bond projects. Key terms in sustainable construction practices: <br />In -Place Recycling: A process in which a large piece of equipment called a reclaimer pulverizes <br />and mixes the existing base rock and a portion of subgrade soils with dry cement and water to <br />create a cement - treated base. This process greatly reduces the use of virgin materials and trucking <br />that are needed using conventional remove and replace construction techniques. <br />Full Depth Reclamation: When applicable, partial or full -depth reclamation (FDR) is used as a <br />cost- and time - saving alternative to traditional reconstruction. Associated costs include <br />replacement of striping and pavement markings, adjustment of manholes, and other work needed <br />to return the street to normal operation. <br />Crack Seal: Placing specialized materials into cracks in unique configurations to keep water and <br />other matter out of the crack and the underlying pavement layers. Crack sealing can be used for <br />two different reasons in pavement maintenance. One is a treatment to seal the cracks in order to <br />prevent moisture intrusion into the pavement. The other is preparatory work to other treatments, <br />such as overlays, and slurry seals. <br />Reclaimed Asphalt Pavement (RAP): The term given to removed and /or reprocessed pavement <br />materials containing asphalt and aggregates. These materials are generated when asphalt <br />pavements are removed for reconstruction, resurfacing, or to obtain access to buried utilities. <br />When properly crushed and screened, RAP consists of high - quality, well - graded aggregates <br />coated by asphalt cement that can be reused as a substitute for a portion of virgin materials in <br />asphalt and aggregate base. <br />Recycled Asphalt Shingles (RAS): A primary reason for the high potential value of recycled shingles <br />is that they contain ingredients that hot mix asphalt (HMA) producers purchase to enhance their <br />paving mixtures including asphalt cement (or AC "binder ") and mineral aggregate. Asphalt shingles <br />also contain a fibrous mat made from organic felt (cellulose) or fiberglass that can also be valuable as <br />fiber in some asphalt paving mixes. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.