My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3E: Resolution 5084 Annexing Land to the City of Eugene (Adee-Connolly - A 13-1)
COE
>
City of Eugene
>
Council Agendas 2013
>
CC Agenda - 04/08/13 Meeting
>
Item 3E: Resolution 5084 Annexing Land to the City of Eugene (Adee-Connolly - A 13-1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2013 11:39:02 AM
Creation date
4/5/2013 11:09:00 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
4/8/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />ECC <br />UGENE ITY OUNCIL <br />AIS <br />GENDA TEM UMMARY <br /> <br /> <br /> <br />Adoption of Resolution 5084 Annexing Land to the City of Eugene <br />(Adee-Connolly - A 13-1) <br /> <br /> <br />Meeting Date: April 8, 2013 Agenda Item Number: 3E <br />Department: Planning and Development Staff Contact: Becky Taylor <br />www.eugene-or.gov Contact Telephone Number: 541-682-5437 <br /> <br /> <br /> <br /> <br />ISSUE STATEMENT <br /> <br />This item is a request to annex 2.29 acres of land located at the southeast terminus of Oakleigh Lane, <br />between River Road and the Willamette River. The annexation is being requested by the property <br />owners, David Adee and Joan Connolly, with the intent to develop the property under the planned unit <br />development provisions for a co-housing project. The property is contiguous to the city limits, currently <br />vacant and is zoned and designed as low-density residential. This request does not involve any street <br />annexation. <br /> <br /> <br />BACKGROUND <br />In December 2007, the City Council adopted an ordinance establishing the procedures for annexation <br />requests and amending Chapter 9 of the Eugene Code (EC) to include these procedures. These <br />annexation procedures provide for the council to adopt a resolution approving, modifying and <br />approving, or denying an application for annexation; or provide for the council to hold a public hearing <br />before consideration of the annexation request. <br /> <br />Approval of annexation requests are based on the criteria in EC 9.7825 which require that (1) the land <br />proposed to be annexed is within the city’s Urban Growth Boundary (UGB) and is contiguous to the city <br />limits or separated from city limits only by a right-of-way or water body; (2) the proposed annexation is <br />consistent with the applicable policies in the Metro Plan and in any applicable refinement plans and (3) <br />the proposed annexation will result in a boundary in which the minimal level of key urban facilities and <br />services can be provided in an orderly, efficient, and timely manner. Draft findings demonstrating that <br />the annexation request is consistent with these approval criteria are included as Exhibit C to the draft <br />resolution (Attachment B). <br /> <br />Public notice for this annexation request was provided in accordance with Eugene Code requirements, <br />and no written testimony has been received. Referral comments were provided by affected agencies <br />including City of Eugene Public Works and Eugene Water & Electric Board (EWEB). These referral <br />comments confirm that the property can be provided with the minimum level of key urban services <br />consistent with the approval criteria. Given the findings of compliance and lack of testimony received, a <br />public hearing is not recommended in this instance. <br /> S:\CMO\2013 Council Agendas\M130408\S1304083E.doc <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.