Laserfiche WebLink
occurrence. <br />Failure to obtain a Utility Right -of -Way Use Permit prior to commencing a work activity <br />requiring the said permit will result in a fee assessment equal to twice the original permit fee <br />without the benefit of any joint trench fee reduction. <br />V. Notes <br />1. Projects greater than 2000 ft. in length will be charged the appropriate permit multiples equal to the <br />length of activity. <br />2. Costs designated are for each facility within the joint trench. <br />3. The option of applying for an annual blanket permit is only available to providers franchised or licensed <br />by the City. Those providers have the option of obtaining individual right-of-way cut permits for each <br />excavation activity performed within the right-of-way or obtaining an annual blanket permit which <br />covers many activities associated with maintenance and minor installations within the right-of-way, The <br />regulations pertaining to the annual blanket permit program are contained within Section 2 -B of the <br />Utility and Right -of -Way Permits Construction Within and Use of the Public Way Manual adopted by <br />Administrative Rule R- 7.302 -A. <br />4. Individual Permit Costs for collector streets and alleys are charged the same as local streets. <br />S. Individual Permit Costs for Public Utility Easements (PUE) abutting street right -of -way shall be charged <br />at the same rate as if the 'placement had been in that right-of-way. PUEs not abutting street right -of -way <br />shall be charged at the rate for local streets. <br />VI. Other <br />Exception permit for cutting street less than five years old. $1,000. <br />Exhibit A - 2 <br />J:1e_main\000401001 a100068448. W PD(12/26/03) <br />