My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes - 02/15/06 Work Session
COE
>
City of Eugene
>
Council Minutes
>
2006
>
CC Minutes - 02/15/06 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 10:28:31 AM
Creation date
4/20/2006 1:56:25 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Work Session
CMO_Meeting_Date
2/15/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
attached at some time in the future. The issue of how many lanes were built on I-5 was undecided. She did <br />not think the study would impact those issues. Mr. Boyatt said the study would potentially inform ODOT as <br />to how wide I-5 would be, and if there were other improvements needed at the off ramps at 126 and 105. <br /> <br />Mr. Papé believed the study should proceed and the City should take advantage of the federal earmark. <br /> <br />Mr. Kelly thanked ODOT and City staff. He referred to the signage around I-5 and the Franklin interchange <br />and said it was challenging, to say the least. He asked if ODOT could work with the two local jurisdictions <br />on a project to improve signage. Ms. Lee indicated that ODOT would be happy to partner on such a <br />project. Mr. Kelly thought that was a very positive thing. <br /> <br />Mr. Kelly said he continued to believe a full interchange at I-5/Franklin was a good thing in the abstract and <br />for that reason he had been willing to study the issue. However, the process had gone beyond the abstract <br />and it was now clear, for example, that the interchange could not be constructed with the replacement <br />bridge. He was also concerned about the loss of access to residents in the lower Laurel Hill Valley. He said <br />that the estimated costs had given him sticker shock. Any study that went forward should consider what was <br />doable, and he did not think the ramps across the river were doable. He also noted considerable community <br />opposition to the project and wished to constrain what was studied to some degree. <br /> <br />Mr. Poling thanked ODOT staff for its honesty about the need for the project. He liked the idea of exploring <br />possibilities for improvements to the ramps already in place. He thought the fact the study was not limited <br />to adding new ramps were a positive thing. Mr. Poling asked what would happen if one jurisdiction did not <br />want to proceed. Ms. Gardner said whatever jurisdiction supported the proposal would have to determine if <br />the cost was worth doing the study alone. . <br /> <br />Mr. Poling suggested the $20,000 cost was a worthwhile investment. <br /> <br />Ms. Bettman determined from Ms. Gardner that a portion of the match could be provided through end-kind <br />services. Ms. Gardner was unsure of that amount. She noted that ODOT had indicated it might co-manage <br />the project and provide funding. The value of staff resources was included within the $20,000 match. <br /> <br />Ms. Bettman said that it appeared there were several different types of ramps were still being discussed and <br />asked if bridge ramps were “off the table.” Ms. Gardner clarified that ODOT had not found a clear <br />transportation problem to solve for the State highway need but she did not think anything was “off the <br />table.” The refinement planning process would frame what was examined and identify next steps. <br /> <br />Ms. Bettman said the motion mentioned both I-5 at Glenwood and I-5 at Franklin, and all the options related <br />to Franklin included the elevated bridge ramps. Mr. Boyatt indicated there were one or two diamond folded <br />ramps that did not cross the river but had an impact on adjacent property. <br /> <br />Ms. Bettman indicated she could support an examination of the I-5/Glenwood interchange in terms of <br />improved access and egress and converting that area into more of a gateway to the community. She <br />acknowledged it was a distance from Franklin Boulevard where the city limits commenced but the cost <br />differential between the two areas was huge and the money more effectively spent on that area than on <br />bridge ramps at Franklin Boulevard. However, she was not sure given that vague wording in the materials <br />and the lack of a shared understanding among councilors as to the nature of the project. She pointed out that <br />Glenwood/I-5 intersection was under Springfield’s jurisdiction and she did not recall a time when Springfield <br /> <br /> <br />MINUTES—Eugene City Council February 15, 2006 Page 8 <br /> Work Session <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.