Laserfiche WebLink
Attachment B: Plan Excerpt <br />4th Avenue <br />Existing <br />Midgley’s <br />Building <br />Alton Baker Park <br />Existing <br />EWEB <br />Headquarters <br />5th Avenue <br />Existing <br />EWEB <br />Operations <br />Building <br />6th Avenue <br />Willamette River <br />Existing <br />Steam <br />7th Avenue <br />Plant <br />EWEB <br />Substation <br />8th Avenue <br />*-+96)-009786%8-:)40%2 <br />Bioswales / Green Extension <br />1 <br />Public Boardwalk <br />Native Green Space + Riparian Enhancement <br />2 <br />Repaired Riparian Zone <br />Restaurant Row w/ Habitat Roofs <br />3 <br />Open Space / Native Plants <br />Continuous Riverbank Trail <br />4 <br />Public Streets with Bioswales <br />Millpond Swale / Potential Millrace <br />5 <br />Bioswale / Possible Millrace <br />6 <br />At-Grade Railroad Crossing @ 8th Avenue <br />Existing Buildings <br />7 <br />Public Boardwalk / Plaza <br />New Construction <br />8 Pollinator Prairie + River Overlook <br />15 <br />Rowell Brokaw Architects <br />