<br />Paving 7-foot (per front foot) <br />Paving lO-foot (per front foot) <br />Sidewalk (per square foot) <br />Wastewater (per square foot) <br />Wastewater service (per each) <br /> <br />$ 67.23 <br />$ 96.05 <br />$ 6.06 <br />$ .48 <br />$3,488.00 <br /> <br />Total Final Assessable Cost <br />Total Final City Cost <br /> <br />$ 476,988.30 <br />$1,367,531.10 <br /> <br />Total Final Project Cost <br /> <br />$1,844,519.40 <br /> <br />The non-assessable City share for the project is funded from Transportation SDCs ($1,160,160) <br />and Storm Water SDCs ($203,145). MWMC will reimburse the City $4,225 for adjustment <br />work that was done to their facilities. The City costs include the additional width of paving <br />(beyond the seven or ten foot width assessable to properties), intersections, medians, bike lanes, <br />street lights, street trees, and non-assessable storm drainage system costs. Assessment financing, <br />a lO-year payment plan through the City, is available to all property owners within the <br />improvement district as required by Eugene Code, Chapter 7. <br /> <br />The estimated assessments, made at the time the district was formed were lower than the final <br />assessments. The original estimates were: <br /> <br />Paving 7-foot (per front foot) <br />Paving lO-foot (per front foot) <br />Sidewalk (per square foot) <br />Wastewater (per square foot) <br />Wastewater service (per each) <br /> <br />$ 65.00 <br />$ 90.00 <br />$ 6.00 <br />$ .35 <br />$2,850.00 <br /> <br />Total Estimated Assessable Cost <br />Total Estimated City Cost <br /> <br />$ 427,851 <br />$1,258,433 <br /> <br />Total Estimated Project Cost <br /> <br />$1,686,284 <br /> <br />The higher than estimated final costs were due to additional street excavation costs to stabilize <br />the soft sub grade prior to paving, extra right-of-way costs for additional right of way needed at <br />the west end of the project for realignment of the intersection, additional storm drainage work <br />due to underground springs, and higher utility relocation costs. <br /> <br />PUBLIC INVOLVEMENT <br /> <br />The City of Eugene Public Works Department sent notice of the proposed assessments to <br />property owners more than ten days in advance of the hearing date. A hearing on the proposed <br /> <br />PAVING, CURBS AND GUTTERS, SIDEWALKS, AND RELATED IMPROVEMENTS ON 3rd AND 4th <br />AVENUE FINAL ASSESSMENTS Page 2 <br />