My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C: Approval of Local SDC Cost Adjustments
COE
>
City of Eugene
>
Council Agendas 2013
>
CC Agenda - 06/24/13 Meeting
>
Item 2C: Approval of Local SDC Cost Adjustments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2013 2:12:12 PM
Creation date
6/21/2013 1:30:29 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
6/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT A <br /> <br />RESOLUTION NO. _____ <br /> <br /> <br />A RESOLUTION ADOPTING INFLATIONARY ADJUSTMENTS TO <br />SYSTEMS DEVELOPMENT CHARGES FOR PARKS SYSTEM, LOCAL <br />WASTEWATER SYSTEM, STORMWATER SYSTEM, AND <br />TRANSPORTATION SYSTEM. <br /> <br /> <br /> The City Council of the City of Eugene finds as follows: <br /> <br />A. <br /> The System Development Charge (SDC) Methodologies were adopted by <br />Resolution No. 4900 effective May 7, 2007. <br /> <br />B. <br /> The SDC Methodologies adopted by Resolution No. 4900 have subsequently been <br />amended by Resolution Nos. 4929, 4977 and 4991. <br /> <br />C. <br /> Inflationary adjustments to Local Wastewater System, Stormwater System, and <br />Transportation System SDCs have most recently been adopted by Administrative Order No. 58- <br />11-01-F. Inflationary adjustments to Parks System SDCs have most recently been adopted by <br />Resolution No. 5031. <br /> <br />D. <br /> Based on: (1) the park development/renovation cost adjustment using the <br />Engineering News-Record 20-City national average Construction Cost Index and, (2) the park <br />land acquisition cost adjustment using the Lane County Assessment & Taxation office’s <br />published 2011 and 2012 Sales Ratio Reports, it is necessary to adjust the Parks System SDCs <br />by implementing an average 2.4% increase in the Parks System SDC for residential <br />development, and an average 2.0% increase in the Parks System SDC for nonresidential <br />development. <br /> <br />E. <br /> Based on the Engineering News-Record 20-City national average Construction <br />Cost Index, it is necessary to amend the Local Wastewater System, Stormwater System and <br />Transportation System SDCs by implementing a 5.1% increase for those SDCs. <br /> <br />F. <br /> Section 2.4 of the SDC Methodologies requires that revisions to fees by more than <br />five percent shall be established by resolution of the City Council. <br /> <br />G. <br /> These inflationary adjustments to the SDCs are in conformity with applicable <br />state law, authorized by EC 7.710(5) and Sections 2.1 and 2.4 of the Methodologies, and should <br />be implemented effective July 1, 2013. <br /> <br />NOW, THEREFORE,based upon the above findings, <br /> <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a <br /> <br />Municipal Corporation of the State of Oregon, as follows: <br /> <br /> Section 1. <br /> The Systems Development Charges for the Parks System are amended by <br />implementing an average 2.4% increase in the Parks System SDC for residential development, <br />Resolution – Page 1 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.