My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-13-08-F
COE
>
City of Eugene
>
Administrative Orders
>
2013
>
Admin Order 58-13-08-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2013 11:48:09 AM
Creation date
6/24/2013 11:45:36 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
6/20/2013
Document_Number
58-13-08-F
Author
CRO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADMINISTRATIVE ORDER NO. 58-13-08-F <br />of the <br />City Manager of the City of Eugene <br />INFLATIONARY ADJUSTMENT OF SYSTEMS DEVELOPMENT <br />CHARGES FOR REGIONAL WASTEWATER SYSTEM. <br />The City Manager of the City of Eugene finds as follows: <br />A. Section 2.020 of the Eugene Code, 1971, authorizes the City Manager of the City <br />of Eugene to determine and set fees and charges to be imposed by the City for services, goods, <br />use of municipal property, and licenses and permits. Section 7.710(5) of that Code authorizes <br />the City Manager to adopt by administrative order inflationary adjustments to Systems <br />Development Charges (SDC) based on previously adopted rate factors and cost indices. Section <br />2.4 of the SDC Methodologies authorizes the City Manager to adopt fee changes, based on a cost <br />index or rate factors, by administrative order pursuant to Section 2.020 of the Eugene Code, <br />1971, so long as the fees are not revised administratively in an amount greater than five percent <br />within any 12 -month period. <br />B. The SDC Methodologies were adopted by Resolution No. 4900 effective May 7, <br />2007, and have subsequently been amended by Resolution Nos. 4929, 4977 and 4991. <br />Inflationary adjustments to the Regional Wastewater System have been adopted, most recently <br />by Administrative Order No. 58- 11 -12 -F. <br />C. In accordance with the procedures set forth in Sections 2.020 and 7:710(5) of the <br />Eugene Code, 1971, the recommendation of the Metropolitan Wastewater Management <br />Commission (MWMC), and after considering the applicable policies, enactments and directives <br />of the City Council, the, amount charged for these services by the City in the past, the full costs <br />of providing these services supported by the fees, the amounts charged by other comparable <br />providers, and the revenue needs of the City as determined by the adopted City budget, on May <br />24, 2013, I issued Administrative Order No. 58 -13 -08 proposing to implement an inflationary <br />increase to the Regional Wastewater System rates as shown on Exhibit A attached to that Order. <br />A general description of the increase is described in Finding D below. <br />D. The adopted Regional Wastewater SDC Methodology provides for periodic <br />adjustments to the SDC rate schedule by applying the Engineering News Record (ENR) "20 -City <br />National Average Construction Cost Index" (CCI) to the value of the existing system assets and <br />to the value of future, non -bond funded projects and updating the actual costs for bond - funded <br />projects. When the ENR CCI increase of about 5.7% is applied in combination with updates to <br />actual costs for bond - funded projects, the net result is an increase in SDC rates ranging from <br />about 4.13% to 4.35 %, depending upon the strength of wastewater discharge associated with <br />development categories contained in the rate schedule. As such, this inflationary adjustment will <br />not result in a 5% or greater fee increase within a 12 -month period. <br />Administrative Order - Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.