Laserfiche WebLink
Eugene Water & Electric Board (EWEB) Master Planned Development <br />Executive Summary <br />0 Preserve existing multimodal facilities (bike lane and sidewalk). <br />October 2012 <br />The 8th Avenue /Hilyard Street intersection should be reconstructed in conjunction with site <br />development. Improvements should include: <br />o Provision of a new highway - railroad crossing, including track panels, lights, gates, <br />audible warning devices, and upgraded railroad track detection as required by <br />ODOT Rail and /or Union Pacific Railroad; <br />o Signalization of the 8th Avenue /Hilyard Street intersection, including pedestrian <br />movements; <br />o Provision of a northbound right -turn lane that will offer storage for right -turn <br />vehicles queued on Hilyard Street during train passage. <br />Shrubbery, landscaping, and above ground utilities near the internal intersections and site <br />access points should be located and maintained to ensure adequate sight distance. <br />Additional details of the study methodology, findings, and recommendations are provided within this <br />report. <br />I Kittelson & Associates, Inc. 6 <br />