My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20513
COE
>
City of Eugene
>
Ordinances
>
2013 No. 20504 - 20519
>
Ordinance No. 20513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 11:57:21 AM
Creation date
7/11/2013 11:04:04 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20513
Document_Title
EWEB Master Plan
Adopted_Date
7/9/2013
Approved Date
7/9/2013
CMO_Effective_Date
8/9/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene Water & Electric Board (EWEB) Master Planned Development October 2012 <br />Existing Conditions <br />EXISTING CONDITIONS <br />The existing conditions analysis identifies the site conditions and current operational and geometric <br />characteristics of the roadways within the study area. These conditions will be compared with future <br />conditions later in this report. <br />Kittelson & Associates, Inc. (KAI) staff visited and inventoried the proposed EWEB redevelopment site <br />and surrounding study area in May and June 2011. At that time, KAI collected information regarding <br />site conditions, adjacent land uses, existing traffic operations, and transportation facilities in the study <br />area. <br />Site Conditions and Adjacent Land Uses <br />The EWEB site formerly housed EWEB maintenance, operations, and engineering in the EWEB <br />headquarters building and accessory buildings. The site continues to house administrative staff in the <br />EWEB headquarters building. Existing structures on the riverfront property include the 100,000 square <br />foot EWEB Headquarters Building, 49,000 square foot Operations Warehouse, 17,800 square foot <br />Vehicle Repair Shop, 21,000 square foot Communications and Equipment Repair Building, 18,600 <br />square foot Midgley's Building, and 28,000 square foot Steam Plant. The southeastern end of the <br />property holds the Willamette Substation and the former manufactured gas plant (MGP) site, both of <br />which will remain in EWEB ownership. <br />The EWEB Master Plan assumes that the existing EWEB Administrative Building and the Midgley <br />Buildings will be preserved. The majority of the property available for immediate redevelopment is the <br />approximately 12 -acre Operations Yard, which has most recently been used to store power poles, <br />transformers and utility service vehicles. This area of the riverfront property is inaccessible to the <br />public in its present, secured state and is almost entirely impervious. <br />Transportation Facilities <br />Table 1 provides a summary of the roadway characteristics of the nearby regional transportation <br />facilities within the site vicinity. Figure 2 illustrates the existing lane configurations and traffic control <br />devices at the study intersections. <br />3 The Midgley Building is located on the southeast corner of High Street /4 Avenue. <br />Iz A Kittelson & Associates, Inc. 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.