Laserfiche WebLink
HCM Unsignalized Intersection Capacity Analysis <br />11: 8th Ave & Hilyard St 9/22/2011 <br />EWEB Master Plan 12:00 pm 5/24/2011 Year 2011 Existing Conditions - Weekday AM Peak Hour Synchro 7 - Report <br />TST Page 11 <br />t <br />t <br />Movement <br />EBL <br />EBR <br />NBL <br />NBT <br />SBT <br />SBR <br />Lane Configurations <br />y <br />+'t <br />Volume (veh /h) <br />0 <br />5 <br />17 <br />459 <br />0 <br />0 <br />Sign Control <br />Stop <br />Free <br />Free <br />Grade <br />0% <br />0% <br />0% <br />Peak Hour Factor <br />0.90 <br />0.90 <br />0.90 <br />0.90 <br />0.90 <br />0.90 <br />Hourly flow rate (vph) <br />0 <br />6 <br />19 <br />510 <br />0 <br />0 <br />Pedestrians <br />1 <br />2 <br />Lane Width (ft) <br />12.0 <br />12.0 <br />Walking Speed (ft/s) <br />4.0 <br />4.0 <br />Percent Blockage <br />0 <br />0 <br />Right turn flare (veh) <br />Median type <br />None <br />None <br />Median storage veh) <br />Upstream signal (ft) <br />403 <br />pX, platoon unblocked <br />vC, conflicting volume <br />294 <br />3 <br />1 <br />vC1, stage 1 conf vol <br />vC2, stage 2 conf vol <br />vCu, unblocked vol <br />294 <br />3 <br />1 <br />tC, single (s) <br />6.8 <br />6.9 <br />4.1 <br />tC, 2 stage (s) <br />tF (s) <br />3.5 <br />3.3 <br />2.2 <br />p0 queue free % <br />100 <br />99 <br />99 <br />cM capacity (veh /h) <br />670 <br />1083 <br />1634 <br />Direction, Lane # <br />EB 1 <br />NB 1 <br />NB 2 <br />Volume Total <br />6 <br />189 <br />340 <br />Volume Left <br />0 <br />19 <br />0 <br />Volume Right <br />6 <br />0 <br />0 <br />cSH <br />1083 <br />1634 <br />1700 <br />Volume to Capacity <br />0.01 <br />0.01 <br />0.20 <br />Queue Length 95th (ft) <br />0 <br />1 <br />0 <br />Control Delay (s) <br />8.3 <br />0.8 <br />0.0 <br />Lane LOS <br />A <br />A <br />Approach Delay (s) <br />8.3 <br />0.3 <br />Approach LOS <br />A <br />Intersection Summary <br />Average Delay <br />0.4 <br />Intersection Capacity Utilization <br />27.9% <br />ICU Level of Service A <br />Analysis Period (min) <br />15 <br />EWEB Master Plan 12:00 pm 5/24/2011 Year 2011 Existing Conditions - Weekday AM Peak Hour Synchro 7 - Report <br />TST Page 11 <br />