Laserfiche WebLink
HCM Unsignalized Intersection Capacity Analysis <br />8: 5th Ave & High St 9/22/2011 <br />EWEB Master Plan 12:00 pm 5/24/2011 Year 2011 Existing Conditions - Weekday PM Peak Hour Synchro 7 - Report <br />TST Page 8 <br />t <br />t <br />Movement <br />EBL <br />EBR <br />NBL <br />NBT <br />SBT <br />SBR <br />Lane Configurations <br />Volume (veh /h) <br />58 <br />28 <br />78 <br />199 <br />103 <br />79 <br />Sign Control <br />Stop <br />Free <br />Free <br />Grade <br />0% <br />0% <br />0% <br />Peak Hour Factor <br />0.83 <br />0.83 <br />0.83 <br />0.83 <br />0.83 <br />0.83 <br />Hourly flow rate (vph) <br />70 <br />34 <br />94 <br />240 <br />124 <br />95 <br />Pedestrians <br />41 <br />7 <br />1 <br />Lane Width (ft) <br />12.0 <br />12.0 <br />12.0 <br />Walking Speed (ft/s) <br />4.0 <br />4.0 <br />4.0 <br />Percent Blockage <br />3 <br />1 <br />0 <br />Right turn flare (veh) <br />Median type <br />None <br />None <br />Median storage veh) <br />Upstream signal (ft) <br />393 <br />pX, platoon unblocked <br />0.96 <br />vC, conflicting volume <br />641 <br />220 <br />260 <br />vC1, stage 1 conf vol <br />vC2, stage 2 conf vol <br />vCu, unblocked vol <br />602 <br />220 <br />260 <br />tC, single (s) <br />6.4 <br />6.2 <br />4.1 <br />tC, 2 stage (s) <br />tF (s) <br />3.5 <br />3.3 <br />2.2 <br />p0 queue free % <br />82 <br />96 <br />93 <br />cM capacity (veh /h) <br />398 <br />792 <br />1265 <br />Direction, Lane # <br />EB 1 <br />NB 1 <br />SB 1 <br />Volume Total <br />104 <br />334 <br />219 <br />Volume Left <br />70 <br />94 <br />0 <br />Volume Right <br />34 <br />0 <br />95 <br />cSH <br />475 <br />1265 <br />1700 <br />Volume to Capacity <br />0.22 <br />0.07 <br />0.13 <br />Queue Length 95th (ft) <br />21 <br />6 <br />0 <br />Control Delay (s) <br />14.7 <br />2.8 <br />0.0 <br />Lane LOS <br />B <br />A <br />Approach Delay (s) <br />14.7 <br />2.8 <br />0.0 <br />Approach LOS <br />B <br />Intersection Summary <br />Average Delay <br />3.7 <br />Intersection Capacity Utilization <br />45.8% <br />ICU Level of Service A <br />Analysis Period (min) <br />15 <br />EWEB Master Plan 12:00 pm 5/24/2011 Year 2011 Existing Conditions - Weekday PM Peak Hour Synchro 7 - Report <br />TST Page 8 <br />