Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis <br />12: Broadway & Hilyard St 9/22/2011 <br />Intersection Summa <br />HCM Average Control Delay <br />21.1 HCM Level of Service C <br />HCM Volume to Capacity ratio <br />0.58 <br />Actuated Cycle Length (s) <br />85.0 Sum of lost time (s) 3.5 <br />Intersection Capacity Utilization <br />59.3% ICU Level of Service B <br />Analysis Period (min) <br />t <br />c Critical Lane Group <br />1 <br />Movement <br />EBL <br />EBT <br />EBR <br />WBL <br />WBT <br />WBR <br />NBL <br />NBT <br />NBR <br />SBL <br />SBT <br />SBR <br />Lane Configurations <br />) <br />ttt <br />ft <br />rr <br />Volume (vph) <br />35 <br />1261 <br />0 <br />0 <br />474 <br />512 <br />724 <br />307 <br />59 <br />24 <br />0 <br />2 <br />Ideal Flow (vphpl) <br />1836 <br />1836 <br />1836 <br />1836 <br />1836 <br />1836 <br />1836 <br />1836 <br />1836 <br />1836 <br />1836 <br />1836 <br />Total Lost time (s) <br />4.0 <br />-0.5 <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />Lane Util. Factor <br />1.00 <br />0.91 <br />0.95 <br />0.88 <br />0.91 <br />0.91 <br />1.00 <br />Frpb, ped /bikes <br />1.00 <br />1.00 <br />1.00 <br />0.93 <br />1.00 <br />1.00 <br />1.00 <br />Flpb, ped /bikes <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Frt <br />1.00 <br />1.00 <br />1.00 <br />0.85 <br />1.00 <br />0.99 <br />0.99 <br />Flt Protected <br />0.95 <br />1.00 <br />1.00 <br />1.00 <br />0.95 <br />0.98 <br />0.96 <br />Satd. Flow (prot) <br />1693 <br />4866 <br />3454 <br />2505 <br />1572 <br />3172 <br />1735 <br />Flt Permitted <br />0.95 <br />1.00 <br />1.00 <br />1.00 <br />0.95 <br />0.98 <br />0.96 <br />Satd. Flow (perm) <br />1693 <br />4866 <br />3454 <br />2505 <br />1572 <br />3172 <br />1735 <br />Peak -hour factor, PHF <br />0.88 <br />0.88 <br />0.88 <br />0.88 <br />0.88 <br />0.88 <br />0.88 <br />0.88 <br />0.88 <br />0.88 <br />0.88 <br />0.88 <br />Adj. Flow (vph) <br />40 <br />1433 <br />0 <br />0 <br />539 <br />582 <br />823 <br />349 <br />67 <br />27 <br />0 <br />2 <br />RTOR Reduction (vph) <br />0 <br />0 <br />0 <br />0 <br />0 <br />390 <br />0 <br />4 <br />0 <br />0 <br />2 <br />0 <br />Lane Group Flow (vph) <br />40 <br />1433 <br />0 <br />0 <br />539 <br />192 <br />411 <br />824 <br />0 <br />0 <br />27 <br />0 <br />Confl. Peds. ( # /hr) <br />21 <br />10 <br />10 <br />21 <br />2 <br />46 <br />46 <br />2 <br />Confl. Bikes (#/hr) <br />1 <br />1 <br />13 <br />4 <br />1 <br />Heavy Vehicles ( %) <br />3% <br />3% <br />0% <br />0% <br />1% <br />2% <br />1% <br />1% <br />2% <br />0% <br />0% <br />0% <br />Turn Type <br />Prot <br />Perm <br />Split <br />Split <br />Protected Phases <br />5 <br />2 <br />6 <br />8 <br />8 <br />4 <br />4 <br />Permitted Phases <br />6 <br />Actuated Green, G (s) <br />4.2 <br />36.2 <br />27.5 <br />27.5 <br />30.6 <br />30.6 <br />3.7 <br />Effective Green, g (s) <br />4.7 <br />41.2 <br />28.0 <br />28.0 <br />31.6 <br />31.6 <br />4.7 <br />Actuated g/C Ratio <br />0.06 <br />0.48 <br />0.33 <br />0.33 <br />0.37 <br />0.37 <br />0.06 <br />Clearance Time (s) <br />4.5 <br />4.5 <br />4.5 <br />4.5 <br />5.0 <br />5.0 <br />5.0 <br />Vehicle Extension (s) <br />2.5 <br />2.0 <br />2.0 <br />2.0 <br />2.5 <br />2.5 <br />2.5 <br />Lane Grp Cap (vph) <br />94 <br />2359 <br />1138 <br />825 <br />584 <br />1179 <br />96 <br />v/s Ratio Prot <br />0.02 <br />c0.29 <br />0.16 <br />c0.26 <br />0.26 <br />0.02 <br />v/s Ratio Perm <br />0.08 <br />v/c Ratio <br />0.43 <br />0.61 <br />0.47 <br />0.23 <br />0.70 <br />0.70 <br />0.28 <br />Uniform Delay, d1 <br />38.8 <br />16.0 <br />22.6 <br />20.7 <br />22.7 <br />22.7 <br />38.5 <br />Progression Factor <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Incremental Delay, d2 <br />2.2 <br />0.3 <br />0.1 <br />0.1 <br />3.6 <br />1.7 <br />1.2 <br />Delay (s) <br />41.1 <br />16.3 <br />22.8 <br />20.7 <br />26.3 <br />24.3 <br />39.7 <br />Level of Service <br />D <br />B <br />C <br />C <br />C <br />C <br />D <br />Approach Delay (s) <br />17.0 <br />21.7 <br />25.0 <br />39.7 <br />Approach LOS <br />B <br />C <br />C <br />D <br />Intersection Summa <br />HCM Average Control Delay <br />21.1 HCM Level of Service C <br />HCM Volume to Capacity ratio <br />0.58 <br />Actuated Cycle Length (s) <br />85.0 Sum of lost time (s) 3.5 <br />Intersection Capacity Utilization <br />59.3% ICU Level of Service B <br />Analysis Period (min) <br />15 <br />c Critical Lane Group <br />EWEB Master Plan 12:00 pm 5/24/2011 Year 2021 Background Conditions - Weekday PM Peak Hour Synchro 7 - Report <br />TST Page 12 <br />