HomeMy WebLinkAboutItem C - Metro Trans.Imp.ProgrmEUGENE CITY COUNCIL
AGENDA ITEM SUMMARY
Work Session: Draft Metropolitan Transportation Improvement Program Project List
Meeting Date: December 8, 2004 Agenda Item Number: C
Department: Public Works Engineering Staff Contact: Mark Schoening
www. cl. eugene, or. us Contact Telephone Number: 682-5243
ISSUE STATEMENT
The City Council is requested to approve the project list in draft FY2005-2007 Metropolitan
Transportation Improvement Program (MTIP). The project list (Attachment A) is annotated to reflect
the proposed changes from the project list in the current MTIP. The Metropolitan Policy Committee
(MPC) is scheduled to hold a public hearing on the draft MTIP on December 9, 2004.
BACKGROUND
On June 9, 2004, the City Council passed a motion that all project lists or funding allocations for
projects within the City of Eugene or the Eugene urban growth boundary generated through the
Transportation Planning Committee (TPC) for the MPC/Metropolitan Planning Organization (MPO)
approval shall first be reviewed and approved by the Eugene City Council before the TPC
recommendations are reviewed for approval by the MPC/MPO, including review of regional projects in
which the City is a stakeholder.
The project list in the draft FY2005-2007 MTIP includes two new City of Eugene projects. The first
project is the realignment of Airport Road. The City has received $1,800,000 from the Federal Aviation
Administration (FAA) for the realignment of Airport Road as part of the parallel runway project. This
project has been identified in the Airport Master Plan and the Capital Improvement Plan for a number of
years. The $1.8 million will be augmented by the required 5% local match ($90,000), utilizing a
combination of Passenger Facility Charge (PFC) revenue and general Airport capital reserves. The
second project is the Patterson Underpass. The estimated cost of the project is $11,900,000. The project
will include the extension of Patterson Street from Franklin Boulevard to the north side of the railroad
tracks and will provide a grade separated access to a potential hospital on the property currently owned
by the Eugene Water and Electric Board (EWEB). This project has been discussed in some detail with
the council, most recently at a City Council work session on September 22, 2004. At that meeting, the
council passed a motion which in part directed staff to pursue a development agreement with McKenzie-
Willamette Medical Center for the benefit of providing access to the EWEB property via the Patterson
Underpass.
Federal legislation requires that the MPO, in cooperation with the state and transit operators, develop an
MTIP that is updated and approved at least every two years by the MPC and the Governor. Copies of
the MTIP are provided to the Federal Highway Administration (FHWA) and the Federal Transit
Administration (FTA). Specific requirements for the MTIP are outlined in various implementation rules
L:\CMO\2004 Council Agendas\M041208\S041208C.doc
developed by FHWA, FTA, and the Environmental Protection Agency (EPA). In summary, the MTIP
must cover a period of not less than three years, must include all federally funded projects and regionally
significant projects, must be consistent with funding that is expected to be available during the relevant
period and must be consistent with the long-range transportation plan.
The FY2004-2006 MTIP was adopted by the MPC on October 9, 2003 (and has subsequently been
amended both by MPC and administratively by TPC). The FY2004-2006 MTIP lists transportation
projects using federal funds programmed for fiscal years 2004-2006. The FY2004-2006 MTIP is being
updated to be consistent with the updated Regional Transportation Plan (RTP) and the Statewide
Transportation Improvement Program (STIP). In addition, state regulations require that the MTIP be
updated within six months of an update of the RTP. The RTP, adopted in July 2002, is being updated to
meet the federal requirement to keep the RTP current with respect to the planning horizon (20 years), the
MPO geography, and the financial constraint analysis.
A Preliminary Draft FY05-07 MTIP was available to the public at the time of a November 4, 2004,
public open house. A second public open house is scheduled for December 1, 2004. In addition, MPO
staff has sent email and postal mail notices of the public comment period, the public open houses and
the public hearing scheduled for December 9 to a distribution list of interested parties.
RELATED CITY POLICIES
The Regional Transportation Plan (RTP) guides the regional transportation system planning in the
metropolitan area. The RTP includes provisions for meeting the transportation demand of residents over
a 20-year planning horizon while addressing transportation issues and making changes that can
contribute to improvements to the City of Eugene and the region's quality of life and economic vitality.
The Metropolitan Transportation Improvement Program (MTIP) reflects the programming of projects
over a three-year period consistent with the system improvements element of the RTP and the City's
transportation system plan (Transplan).
COUNCIL OPTIONS
The City Council may:
1. Approve the project list in the draft FY2005-2007 MTIP;
2. Not approve the project list in the draft FY2005-2007 MTIP; or
3. Provide comments to the MPC requesting specific changes to the project list in the draft
FY2005-2007 MTIP.
CITY MANAGER'S RECOMMENDATION
The City Manager recommends that the City Council approve the project list in the draft FY2005-2007
Metropolitan Transportation Improvement Program. The project list does not include any new
allocation of state or federal funds by the MPC. The two new City of Eugene projects, the realignment
of Airport Road and the Patterson Underpass have been previously reviewed and approved by the City
Council.
L:\CMO\2004 Council Agendas\M041208\S041208C.doc
S[IGGESTED MOTION
Move to approve the project list in the draft FY2005-2007 Metropolitan Transportation Improvement
Program.
ATTACHMENTS
A. Draft FY2005-2007 MTIP Project List
FOR MORE INFORMATION
Staff Contact: Mark Schoening
Telephone: 682-5243
Staff E-Mail: mark. a. schoening~ci, eugene, or. us
L:\CMO\2004 Council Agendas\M041208\S041208C.doc
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIF ATTACHMENT A
-- as of Dec 1, 2004 --
Fiscal Year
ODOT FY05= FY06, FY07, Total RTP Regional NOTES
Project Project Description Key ] i i Total Cost Federal Funding Project Emissions Modifications to FY04- Can be amended
FY05-07 Cost FY05 Source
i New
Number Federal $ i Other $ Federal $ i Other $ Federal $ Other $ 07 Number~ Analysis 06 MTIP to get to Draft Project? administratively
i FY05-07 MTIP by TPC?
Allow Eugene Public Works
Regional Engineering staff to participate and
RTP Goals Exempt
Transportation activelYand collaboratemetro area withagenciesfederal,andState, 1337513376 $125,000{ $243,000 $368,000 $125,000 STP-U, E #1 & #2
Planning governments to form and implement
regional transportation plans,
Rehabilitate the existing pavement of
Fern Ridge Path Fern Ridge path by overlaying with new
Resur~acing concrete sudacing; Chambers to City 13377 $418000i $105,000i $523,000 $418,000 STP-U, E TSI Bikeway Not in CATS
Policy # 1 Area; Exempt
View
--~ .............. · ............................ - ......... $~ $0 ~ Res,4,,vay- .... ~"- FY04 project
c~ha~ccmc~.:
Reconstruct 8th Avenue (Mill Street to
Hilyard Street), 2-lane urban street with
parking, curb, gu~ter and sidewalks,
Extend Ferry Street (north from 8~"
Avenue to realigned 6t" Avenue), 2-
lane urban street with parking, curb,
guller and sidewalks. Construct
Courthouse District realigned 6th Avenue (Hilyard Street to 13378
Transportation High Street), 2-lane urban street for 13379 $1,600,000 i $1,318,000 ~ $2,918,000 $0 E, LC 198 Required
Improvements one-way westbound traffic with curb,
gutter, sidewalks and separated share¢
use path, Project would include new
signal at 8th Avenue and Mill Street
intersection as well as improvements tc
Mill Street, Broadway and Ferry Street
FY05 funding: $500K for design;
$1,100K for ROW acquisition
13380! TS I
Traffic Operations Safety and transportation system Not in CATS
Improvement 13381 i $55,000 $55,000 $110,00(3 $0 E Roadway
Program management improvements 13382i Policy #1 Area
13383 TSI Not in CATS
Street Lighting Arterials/collectors, vadous locations 1133843385 i $60,000 $60,000 $120,000 $0 E RoadwaYPolicy # 1 A rea
Upgrade and capacity enhancements
for 3r~ Avenue from Pearl Street to
Lincoln Street just north of the railroad 13386 Not in CATS
3rd-4th Connector tracks; Upgrade major collector to 13387 i $1,451,000 i $1,451,000 $0 E 450 Area
urban standards with 2-lanes, rum
pockets, curb, gutter, sidewalks and
13388 ~ TSl
Traffic Signal Install new traffic signals and upgrade i ! Not in CATS
Improvements and 13389i $150,000 $150,000 I $300,000 $0 E Roadway
Upgrades traffic signal system 13390 I Policy #1 Area
Page 1 of 10
Central Lane MPO DRAFT FY2005-2007 MTIP Project Table December 1, 2004
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP
-- as of Dec 1, 2004 --
Fiscal Year
ODOT FY05 FY06 FY07 Total RTP Regional NOTES
Project Project Description Key i i i Total Cost Federal Funding Project Emissions Modifications to FY04- New Can be amended
Number Federal $!i Other $ Federal $ ii Other $ Federal $ ]] Other $ FY05-07 Cost07FY05, Source Number~ Analysis 06 MTIPFY05.07to getMTiptO Draft Project? admlnistrativelYby TPC?
EUGENE, Continued ~
Jude!nc Pc!~t
........... / .................. ~' .............. ~i i $0 $~ E-r-L-G ~ ............ FY04 project
G!cn.;:c _.c~_ __.c,-!.~,.,~_rd ............ ~ ...... . ............ . .......... , i P-eiic. y-,~l- .....
i __ NO
Judkins Point Intersection imorevements at i i TSI Not in CATS New project. YES (must be adopted
Interchanee / TBD i $220,00( ~ $220,000 ~ E, LC Roadway_ Area Additional/new funding.
Glenwood Boulevard interchanoe ramo terminal [South sidel -- i i ~ by MPC)
Extension of Legacy Street; Construct 13392 i i ; Not in CATS
Legacy Extension, new 3-lane major collector with curb, 13393 i $263,00(i $823,00( i $1,086,000 $(~ E 445 Area
Avalon to Royal gutter, sidewalks and bike lanes 13394
Infrastructure improvements to support
new development; This category is 13395 ii Not in CATS
Services for New used as match for capital projects 13396 i $400,00( $400,00£ $800,000 $(~ E 102 Area
Development which add capacity to respond to 13397
demand from new development
Enhance Monroe/Friendly corridor to
make it a 'bike arterial;' Project still in
planning/scoping phase; May include
Monroe Street / bike lane or route on either Monroei i i Not in CATS
Fdendly Street Street or Friendly Street between Ruth 13399 $224 000~ $26,00(; i! $250,000 $224,00(~ STP-U, E 172, 251 Area
Bikeway Biscom Riverbank Trail and 28th
Avenue. Possible intersection and
operational changes to improve safety
for cyclists through corddor
North Bank Trail Rehabilitate the existing pavement of
Resurfacing: North Bank Trail path by overlaying witt' Finance Not in CATS
Greenway Bicycle new concrete surfacing, Greenway 13400 $381,000i $96,00(; i ,$477,000 $381,000 STP-U, E Policies #2 Area
Bridge - 1500' East Bicycle Bddge to 1500' east of Hwyi & #6
of Hwy 227 227 [1105] O-Xing.
Extension of Roosevelt Bid; Construct
Roosevelt Extension 13401 i Not in CATS
new 3-lane major collector with curb, 13402 $270,00(~ $274,000i $544,000 $0 E 429 Area
Terry to Royal gutter, sidewalks and bike lanes
Rehabilitate the existing pavement of
Garden Way Path Garden Way path (Garden Way to 13403 i $388,000ii $97,000i $485,000 $388,000 STP-U, E TSl Bikeway Not in CATS
Resurfacing Canoe Canal)concretebY overlayingsurfacing with newi i Policy #1 Area
Extend Chad Ddve to connect to North
Game Farm Road, including 2 travel
i Not in CATS
Chad Drive lanes, center turn lane at intersections 13404 $695,0001 $565,000 $1,260,000 $695,000 STP-U, E 680
Extension curb, gutter bike lanes and sidewalks i Area
on both sides, street trees, street lights,
and a traffic signal at Game Farm Road
City of Eugene request
Realiqn Airport Rd and possible i i Not in CATS for new project. Projecl NO
Airport Road reconficuration of Aimort Rd/Greenhill TB_.._~D $180,000i $20,000 $2.081,8201 $118.180 ~ $2,261.820 FAA. E 499 YES (must be adopted
Realiqnment Rd airport entrance intersection, i i -- Area is inMasterCity's PlanAirp°rt by MPC)
Extend Patterson St. from Broadway to
Patterson Street North of Railroad Tracks and Construct ! } i In CATS area City of Eugene request NO
Underoass TB.~D ] i $3.570.000 i $8,330.00C $11,900,000 $0 E 19._.~9 Required for new project. YES (must be adopted
Undereass FY06: preliminarv desion & eneineedn(]= , by MPC)
FY07: construction
age 2 of 10
Central Lane MPO DRAFT FY2005-2007 MTIP Project Table December I, 2004
DRAFT FY05-07 MTIP with annotations showing changes from Ad /Amended FY04-06 MTIP
-- as of Dec 1, 2004 --
Fiscal Year NOTES
ODOT FY05 FY06 FY07 Total RTP Regional
~an ~e amended
Project Project Description Key i i i Total Cost Federal Funding Project Emissions Modifications to FY04- New adl~dstratlvely
Number Federal $ ] Other $ Federal $ i Other $ Federal $ i Other $ FY05-07 Cost FY05. Source Number' Analysis 06 MTIP to get to Draft Project?
07 FY05-07 MTIP
Development Services staff to [ i RTP Goals
Regional participate and actively collaborate with 13405 i $107,50(; $87,500 STP-U, S Exempt
Transportation federal, state, and metro area agencies 13406 $87,500i $20,000 [ i #1 & #2
Planning and governments to form and i
implement regional transportation
plans. ~ .... Financ~ Not in CATS
Preservation and reconstruction, 13407 $640,000i $710,00C i i $1,350,000 $640,000 STP-U, S Polic,~ #2 Area
~ ~ ---- Remove from MTIP
21"t Street O1~ to Main; add bike lanes
i i i TSI Sy:tem- ,. ......... since it is not required NO
4.3408 ............ to be in MTIP (not NO (m~
Sidcw=!~ Rc~:!r ~"~' ^' "~'~'"~'° ~ i $I 5,990 i ~ ~ ~ i $~ $~ $ W!-'-c Pc!!cy ~ by MPC)
....... #-!- Federally funded, not
~ ___ -- .... Remove from MTIP NO
i i i TS! Sy:tcm- ~. ........ ~ since it is not required
4.344A- $~9,099 i $~ $~ $ Widc Pc!!cy ............ to be in MTIP (not NO must be adopted
Sign:! Dot:ct:r= S.;n:! rc~c!r mt ,.':de'-': !cc:t!c~~ ~ $~0,900 i ~ Area Federally funded, not by MPC)
.... TSl System- Not in CATS
Traffic Control Installation of traffic controls such as 13415 $50,00C $50,000 i #1
Projects signals or roundabouts 13416 i YES
Springfield request to botween years
Not in CATS move exieting funding NO v~thin MTIP
126/42~ Ramp Construct signal at Highway 126/42r~ 13417 $200,00( $200,000 $0 LC 713 Area from FY04 to FY05 pedod is
Signal W B ramp intersection administrative)
~ ~ ~ ~ ~SI System- Not in CATS
Gateway Traffic Capacity improvements at vadous 13419 $200,000 $200,000 $400,000 $0 S,SDC Wide Policy Area
Improvements locations in the Gateway area 13420 ~ #1
.... Remove from MTIP
~ i i [ TSf Syct-~m- N^. ~. ,-.^"r~ since it is not required NO
13~'2~ i W~.~ ,=~.~.. - ......... to be in MTIP (not NO (n' adopted
Strcct Sc:!,/O;'ed:y Ccnt:num; :.r:-'c ......................... ~,~.~o ........ ' ....... ' Ama by MPC)
~,jr."; :--'c! :nd c.:eday ~ ~-;~ i ........ ~ Federally funded, not
i regionally significant)
..... YES
i i (, ~oving projects
i Springfield request to
Finance Not in CATS i ,etween years
move existing funding NO within MTIP
Pavement Preservation, Q Street to 13424 ~400,000 $100,00(; $500,000 $400,000' STP-U, S Policy #2 Area from FY05 to FY06 pedod is
Pioneer Parkway Hayden Bddge ~ jministrative)
[ [ i Springfield request to YES
reflect increased cost & (minor cost
i Not in CATS funding of project (from NO e.. imate revision~
Construct minor arterial; BeEline-Game i 768
MLK Parkway Farm intersection to 13425 i ~9,300.000 i $9,300,000 $0 LC, D Area $8,950,000 to are
Hadow-Hayden intersection [ $9'300'000)
McKenzie Highway to Jasper Road, i i i Springfield request to
Upgrade to urban standards, i replace $4,125,000 ~n
· FY05 with $1,550,000 NO
jurisdictional transfer; Upgrade to a ~ i Not in CATS
$3,100,000 $0 O 954 in FY05 and NO (r ust be adopted
three lane section where feasible 12835 i ~1.550.00(; i ~1,550.00(; Area by MPC)
42nd Street including pedestrian islands, sidewalks, i $1,550,000 in FY06
· (reduces total project
bike lanes where feasible, landscaped
funding by $1,050,000)
setbacks, street lighting, curbs and
gutters
December 1,
Central Lane MPO DRAFT FY2005-2007 MTIP Project Table
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP
-- as of Dec 1, 2004 --
Fiscal Year
ODOT FY05 FY06 FY07 Total
Project
RTP Regional NOTES
Project
Description
Key
Total
Cost
Federal
Funding
i i Other $ Project Emissions , Modifications to FY04- New Can be amended
Number Federal Si Other $ Federal Si Other $ Federal $! FY05-07 Cost FY0$ Source
]' i i 07 Number~ Analysis 06 MTIP to get to Draft Project? administratively
FY05-07 MTIP by TPC?
Reconstruction and urban standards A
Street to Thurston Road; Upgrade to a
three lane section where feasible
including sidewalks, curbs and gutters,
69th Street drainage improvements for a channel 13426 i $431,000] $754,000 i $1,185,00(3 $431,000 STP-U, S Finance Not in CATS
(drainage funds), bike lanes, street !i Policy #2 Area
lighting, intersection improvment (signal
or roundabout) at 69th and Thurston
intersection
Gatewav/Beltline
Intersection Desiqrl and Ri(iht of Way oumhase TB.__.~D i $2,250.00(; i $3,250,00(3 i $2,500,00(; $8,000.000 $0 S,D 789 Not in CATS Springfield request; NO
~ Area new project YES (must be adopted
E..~c.~c!c.'~, .M.c~n E."t. cnd d !"nc =.'tcdal ! 3d27 I ~"ct !n CATS
Str-~ct tc 5.%~ j $0 $0 L--G ~ ~ FY04
project
i ! ' Lane County request to YES
Jasper
Road
i move existing funding (moving projects
Extensi°n'57tht°Jasper Road Extend21aneartedal 13428 i $2,625,00( i $2,625,000 NotinCATS
i to FY05 and change NO between years
i $0 LC 66 Area extent to 57th St. from within MTIP
i pedod is
j 58th St administrative)
Intemhange improvements; Intedm YES
Delta/Beltline safety improvements; potentially i Lane County request to (moving projects
Intemhange replace/revise existing ramps and 10088 j $8,050,000 $8,050,000 $0 LC 638 Not in CATS
between
widen Delta Highway bddge to five i Area
move
exiating
funding
years
NO
within
MTIP
lanes i i~ i from FY05 to FY06 period is
Upgrade from 2-lane to 3-lane urban i i i admini~iaiive)
facility; include a curb, setback
sidewalk, urban bike lane on the
Game Farm North south/west side and a rural design on
Eugene City Limit to the nortWeast side including a six foot, ii Lane County request to
Coburg Road bike shoulder; include a new traffic 13430 j $3,025,00C i $3,025,000 $(3 LC 654 Not in CATS ,ncrease amount from NO
signal at Crescent Avenue and an~ Area $2,200,000 to NO (must be adopted
! $3,025,000 by MPC)
~mprovement of the Armitage Road .."
alignment as the fourth leg of this
intersection
· .c".:g~ment .................................. g i i i Lane County request to YES
............... ' ............ ' ....i ' .......i i Net !n CATS remove project from (removal of local
A;'cn'.'e ,^ ~n"~ a ..... ,~.. c,.~. ~.~.. r~,~ . j ..... MTIP (project dropped project is
,.~m~ ~,g~,. ^,.~ ~..,~^~ ~, ~,.w%.] i from County CIP) administrative)
H!gh...:cy :;,!!! bc ~--b".~.dc~cd or
C~ntral I~nc MPO DRAFT F¥2005o2007 MTIP Proje..et Table ~ge 4 of 10
D~ember 1, 2004
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP
-- as of Dec L 2004 --
Fiscal Year
ODOT FY05 FY06 FY07 Total RTP Regional NOTES
Project Project Description Key i i ] Total Cost Federal Funding Project Emissions Modifications to FY(M- New Can be amended
Number Federal $ ii Other $ Federal $ ii Other $ Federal $ ]] Other $ FY05-07 !Cost07FY05 Source Numberj Analysis 06 MTIPFY05.07to getMTiptO Draft Project? admlnistratlvelYby TPC?
LANE cOUnTY, Continued ~
Delta Highway Pavement Preservation 13432 i $632 500i $632,50( i $1,265,000 $632,500 STP-U,Lc PolicyFinance#2 Not Areain CATS
i i i Lane County request to YES
,..~.~ =^o.~ .............................. .............. ~ .................i i ! k,^+ ~. ,'.*-re remove project from (removal of local
r~ ....... ---- ....... · ................ ~ .................!~ iii Area ..... MTIP (project dropped project is
.... "-" ~cc-"=: '.c !.".'!~g ~c~--.d c~ ~c~h =!d~ from County CIP) administrative)
Royal Avenue, Terry Upgrade major collector to urban Not in CATS
Street to Greenhill standards with 3-lanes, curb, gutter, 13434 ! i $2,200,00( $2,200,000 $0 LC,E 481
Road sidewalks and bike lanes
UDarade two lane urban facility with i i Not in CATS Lane County request NO
Hunsaker/Beaver St sidewalks and bikelanes from Division TB_._~D i i $2.200.00( $2,200,000 $0 LC 52-"Z7 Area for new project YES (must be adopted
Ave to River Road= . by MPC)
Addition
of
shoulders.
curbs
and
i i Not in CATS Lane County request
NO
GreenhillRd (iutters. orboth, from RovalAve. to TBD i i $2.200.00( $2,200,000 $0 LC 454 485 YES (must be adopted
Clear Lake Rd. Desion to be -- -- Area for new project by MPC)
determinated
Finance Not in CATS
Update TSP to meet requirements of 13435 $20,000i $5,000 $25,000 $20,000 STP-U
Coburg
TSP
Update
Pedodic Review and TMA 13436
Policy
#2
Area
Coburg Diamond Oveday pavement 13437 $24 0001 $6,000 $30,000 $24,000 STP-U Finance Not in CATS
Street oveday: Policy #2 Area
Oveday pavement, provide street i Finance Not in CATS
Coburg Locust Streel widening with the right-of-way and 13438 $30,0001 $10,000] $40,000 $30,000 STP-U
improvements ~ Policy #2 Area
correct drainage problems
Central Lane MPO 13439 $250,000i.
UPWP Funding Fund MPO Work Program Activities 13440 = #1 & #2
Exempt
........................ · .............. ~ ....... ~--- ~ FY04 project
........ " ........... ~ 4.3444. $0 $~ ~ ............ kn~+ ~ t-^-ro Project complete
The mransp°rtati°n Demand 11695
Management work performed is
regional in its scope of services and
programs. The strategic plan for the
TDM work performed though the
Commuter Solutions Program at LTD
incorporates the TDM strategies in the i TDM Policy Additional funding in NO
Transportation
Demand adopted RTP. A TDM Advisory 11708 $11.40( $333,000 $298,800 STP NO
Management Committee ( which is a sub- committee 12890 $99,600i $11,400 $99,600i $11,40( $99 600i #1 Exempt FY07 programmed in (must be adopted
i adopted FY04-07 STIP by MPC)
of
the
Transportation
Planning
Committee), oversees the Commuter
Solutions Program with committee
members representing Lane Transit
District, Lane County, LCOG, City of
Eugene, City of Springfield, LRAPA,
and ODOT.
Page 5 of 10
Central Lane MPO DRAFT FY2005-2007 MTIP Project Table December 1, 2004
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP
-- as of Dec 1. 2004 --
Fiscal Year
ODOT FY05~ FY06~ FY07~ Total RTP Regional NOTES
Project Project Description Key i ] i Total Cost Federal Funding Project Emissions
Number Federal $ ] Other $ Federal $ ] Other $ Federal $ i Other $ FY05-07 Cost FY05 Source Modifications to FY04- New Can be amended
,' ~ 07 Number' Analysis 06 MTIP to get to Draft Project? administratively
FY05-07 MTIP by TPC?
This project is for ITS systems for the
Intelligent BRT Franklin Corridor (Phase 1), and 12255 ! LTD request to add NO
Transportation includes traffic control interfaces, ~;80,000i $20.000 $400,000 $320,000 Federal TSI Transit Exempt $100,000 to each of NO
System passenger boarding information, and 12261 $160,000i $40,000 . . J $80.000i $20,000 5307 Policy #1 FY06, FY07 (muStbybeMPc)adopted
vehicle tracking systems
Commuter Solutions is the region's
TDM program responsible for
implementing TDM strategies that
compliment RTP goals and policies.
The Transportation Demand
Management work performed is
regional in its scope of services and
programs. The strategic plan for the
TDM work pedormed though the 13442
Regional
TDM
Commuter
Solutions
Program
at
LTD
13443 $225 000! $36,67( $225,000i $36,67( $523,340 $450,000 STP-U TDM Policy Exempt
Program incorporates the TDM strategies in the 13444 i i #1
adopted RTP. A TDM Advisory
Committee ( which is a sub- committee
of the Transportation Planning
Committee), oversees the Commuter
Solutions Program with committee
members representing Lane Transit
District, Lane County, LCOG, City of
Eugene, City of Spdngfield, LRAPA,
and ODOT.
This project is a roof rebuild for the
River Road Station existing River Road Transit Station, 12256 $240 000i $60,00£ $300,000 $240,000 Federal TSI Transit Not in CATS
Improvements and will replace the roof structure 5307 Policy # 1 Area
=, .~ ~;.~ T .... ;+. - ......................... YES
i LTD request to change (minor changes in
~"-' ........... " ........... ' "'-' .... 12252 i Not in CATS
BRT Coburo & Pioneer Parkway and Cobura Road $1,000,489i $114,511 $1,115,000 $1,000,48~ STP-U, 1115 name and project NO name and project
ProiectPi°neerDeveloornenlParkwav Bus Raoid Transit oroject development, 12258 iii . 5309 Area description only description are
includino alionment alternatives = administrative)
development. This proiect is beinq
carded fonvard for arant
reimbursement Durposes, and funds for
work beaun in FY04.
age 6 of 10
Central Lane MPO DRAFT FY2005-2007 MTIP Project Table December 1, 2004
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP
-- as of Dec 1, 2004 --
Fiscal Year
ODOT FY05 FY06 FY07 Total RTP Regional NOTES
Project Project Description Key i i Total Cost Federal Funding Project Emissions Modifications to FY(M- New Can be amended
Number Federal $ ] Other $ Federal $ i Other $ Federal $ i Other $ FY05-07 Cost FY05, Source Number~ Analysis 06 MTIP to get to Draft Project? administratively
........... ^ ~ ..... t~.~; ~.~..~ ......... .~..^.~.~ ~ LTD request to change
~A~;~. ........ .~ .... ~ .......... . ................... Federal NO
.................... ~ A~ +~.~ .~ ......... .~ ...... .~, i i TSI Transit Not in CATS name and description
Opcrc*Jc~c Fac!I!."/ ........................... ~ ...... 13445 ~1.879,152i ~;21~,077i $2,094,229 $1,879,152 5307, NO (must be adopted
~^...~^~ ,^. k.cD^ .... .~ Policy #1 Area and add additional by MPC)
RideSoume Facility ......................... . ........ i j 5309 FY05 funds
Construction Prelect .:.~,T~.~.~+~.-[~.~.~'+~.~.'~r~ ;~""~'~'~'~"~'~'
............ .;:. '.:-£ .:':: 'J ~ :, :' '-~ .........
(~onstruction of RideSoume
maintenance and operation facility; 2nd
{~nd Garfield,
Bus Support This project includes office supplies, 12254 i Federal TSI Transit Not in CATS LTD request to add NO
Equipment and computer hardware and software, and 12257 $2 800 000i $700,000 ~800,000i $200,00(; $800,000~ $200,00¢ $5,500,000 $4,400,000 5307 Policy #1 Area additional funding for NO (must be adopted
Facilities other administrative support equipment. TBD i i ! FY06, FY07 by MPC)
Five vehicles are being pumhased for
the Franklin EmX corridor. These ! i
vehicles are hybdd electric vehicles, i i Federal Not in CATS
and will replace diesel-powered 12251 [ 1110
Bus Rapid Transit vehicles operating in existing service on 13446 [ $5 280 000i $1,320,00¢ $6,600,000 $5,280,000 5307 Area
Vehicles
this corridor, served by the number 11
route. The number 11 route will be
replaced by the Franklin EmX Corridor
Service.
Phase One of Bus Rapid Transit, also
referred to as the Franklin EmX
Corridor, is a four-mile corddor from
downtown Eugene to downtown
Springfield, The EmX service will
provide rapid transit service through
exclusive busways, Iow-floor vehicles,
pre-paid fare mechanisms, and signal Federal
i 5309, 1115 Required
Bus Rapid Transit, priority. This service will replace 13285 $8,000 0001 $2.000.000 $10,000,000 $8,000,00~ Federal
Phase One existing service, with the same
frequency, currently provided by the i 5307
number 11 route. Due to pdodty
techniques such as exclusive busways
and traffic signal priority, as well as
hybrid-electric vehicles, it is anticipated
that emissions for the EmX Franklin
Corridor will be less than the existing
conditions.
Page 7 of 10
Central Lane MPO DRAFT FY2005-2007 MTIP Project Table December 1, 2004
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP
-- as of Dec 1, 2004 --
Fiscal Year
ODOT FY0$ FY06 FY07 Total RTP Regional NOTES
i Total Cost Federal Funding Project Emissions Modifications to FY04- Can be amended
Project Project Description Key ! i FY05-07 Cost FY05 Source
New
Number Federal $ ] Other $ Federal $ i Other $ Federal $ ! Other $ Numbe¢ Analysis 06 MTIP to get to Draft Project? administratively
i] i 07 FY05-07 MTIP by TPC?
Passenger Boarding Improvements !' ]
include new shelter placements for new
service, shelter replacements for
shelters at high vandalism location*,
13447 $232,0001 $58,000 $232,000i $58,000
Passenger Boardin! improvements to accommodate ADA 13448 . $580,000 $464,000 Federal 1130, 1330, Not in CATS
Improvements and improvements to other stations and i i 5307 1355 Area
)ark and ddes, including improvements!
to the station at Lane Community
College,
Boarding ............. ~.~.~i.~.~. .............. i i (minor changes in
Improvements - ReDlace old shelters in poor condition TBD $216,000i $54,000 $216,000] $54,000 $540,000 $432,000 STP-U, 1130, 1330, Not in CATS LTD request to change NO name and project
i LTD 1355 Area description only
Shelter Replacement with new desien vandal resistent description are
shelter/ADA access improvements i administrative)
Th!_~ pr_.cj_~ct !r~c!,_,dc: :!to :c!cction,=i]
cm'!r.'cnmc~:! rc':!c':: for HEP.~.
Cch,_,;?. p:..~. :nd Rc:d EmX r'_c~dcr. E_CC:,-:: cf thc
Ride ,~^~%,,^,~ o;~^..^ ~^..h~ r.~.,,...~ o^~,~ ~ eonn n^n i ~oan ~^n ~ ~ ~n~ ~,~nc k,^* ;. r'^TO LTD request to delete
.................................. ' ....... i ........ ! .t~ ,t~ 6.307- ~ ,~rea project NO (must be adopted
=~v r.~...~ .... .~ .~.~ ]~.~. ^~ ~ [ i by MPC)
'j~!!kc!'/tc bc b'J!~ .::!th!c *.he T!P~
Bus Rolling Stock Replacement rolling stock for fixed- 12260 i $5,200,000j $1,300,00C ~ $6,500,000 $5,200,000 Federal 1110 Not in CATS
route fleet. ~ i 5309 Area
Upgrade fixed-route fare collection ! ~
Fixed Route Fare system to accommodate new
Management technology fare readers, such as 13449 $886,800i $221,70C i $1,108,500 $886,800 Federal TSI Transit Not in CATS
· 5307 Policy #1 Area
proximity cards,
Automated Automatod Imssenger information 13450 } $181,600i $40,40~ $202,000 $181,800 Foderal lSl Iran, it blot in CAIS
Passenger systems for fixed route service, 5307 Policy #1 Area
Information Systems
.................. i ] i LTD request to change NO
Radio Infrastructure Upgrade radio communication system 13451 $81,600! $20,400 $1,200,000i $300.00C $1,602,000 $1,281,600 Federal TSI Transit Not in CATS name of project and NO (must be adopted
Improvements for fixed route service, i i 5307 Policy # 1 Area add new funds for
i by MPC)
i i j FY07
age 8 of I0
Central Lane MPO DRAFT FY2005-2007 MTIP Project Table December 1, 2004
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP
-- as of Dec 1, 2004 --
Fiscal Year
ODOT FY05 FY06 FY07 Total RTP Regional NOTES
Project Project Description Key i ] Total Cost Federal Funding Project Emissions Modifications to FY04- New Can be amended
Number FederalS] OtherS FederalS] OtherS FederalS] OtherS FY05-07 CostFY05 Source Number~ Analysis 06 MTIP to get to Draft Project? administratively
07 FY05-07 MTIP by TPC?
-~-~:,'~-~'~,~,~' -.~;;-;.'~'~2.'.~,~,".L~?.T'.?.2".';',',~'~';-:.~,-.:.'2£'£::2' i Federal LTD request to change NO
BRT Pioneer L..~;:-~ -'.:::..=:.~:.~:.h; ;::;:::-" f:~ ~?-e.~, 13452 $600,00C i $160,000 $4,575,000 $3,660,000 5309, 1115 Not in CATS name and description NO (must be adopted
¢:m;,.~=::. TBD $2 400 000i $620,000i $155,000 $640'000i Federal Area and add new funds for
~ by MPC)
Parkway Development Proiect Proiect Pan~vav devel0pmerl1[ BRT Droiect, for the includina Pioneeri! ii 5307 FY06 and FY07
alternatives evaluation, public outreach,
preliminary enqineerinq and desion.
NEPA compliance, and New Starts
documentation,
Springfield Station Relocation of Springfield Station 11361 $4,160,0001 $1,040,00C i $5,200,000 $4,160,000 Federal 1135 Not in CATS
· 5309 Area
Transit Urban i i Not in CATS
General: Bus Pumhase one large bus TBD $242 2711 $27,729i $270,000 $242,271 Federal 1110
pumhase ! j 5307 Area
Replace 1 van; eight shelters;
Transit Enhancement maintenance equipment; maintain bus TBD $992,5481 $113,602 $1,106,150 $992,548 Federal 1130, 1330, Not in CATS
Capital Purchases shelters; pumhase 10 vehicles i 5310 1355 Area
YES
Operational ITS ] i TSI System- Not in CATS between years
(moving projects
ODOT request to move
Improvements - I-5 @ 30th Avenue & OR69 west of 13150 i $50.00C $750,000 $800,000 $0 O Wide Policy $50,000 funding from NO within MTIP
Vehicle Management River Road #1 Area FY04 to FY05
Systemi pedod is
............................... i administrative)
~,iclewalks ~lenwooa Blva. to
OR-126/Franldin Willamette Bddge/McVey i~ ! Pedestrian Not in CATS
Enhancement 13257 i $250,00C i $376,000 $626,00(~ $0 O Policy #1 Area
Blvd, Sidewalks FY05; Engineering & ROW;
....... ~F~ g~ :. g.n, n:~?. ~ t,i~. n~ ........ , ............................. i~ ..............................
A-~..: ~:,'~.;..".~.~. ~ !_;.~ ~_5:~'~L,~:~.~_ ~..~:~ ~.~ ' ODOT request to (moving projects
-~L-"~'?~"~'.'.;~'-'~,'"~7.'~'A:.~'~"~-.".:',~--':..~-~'..;~ '.T' change (simplify) between years
................................. o '"~ ......... i Roadway Not in CATS project description and within MTIP
OR222 Safety ~:::===-":-~ ~;'!~::~; ::~ ;~: ~:~ :~: ~:" 340,g0C $3,030,000 $0 O NO
Project ~.,, pr.c;:::._.~:..:!._:r.::?_:.-...-.;::~::,:..h.:!~_: 12581~ ~ $2,690,000 j Policy#1 Area moveS340,000 )efiod and minor
':::':!"- -':: ": ~-" i i (existing funding) changes in
SDdne/ield south city limits to Jasper] j from FY04 to FY05 description are
Bddqe; widen shoulders and remove ~ administrative)
obiects in the clear zone without
realiqnine curves and orofiles,
i i ODOT request to move YES
{ (minor cost
i ! Not in CATS existing FY06 funds to
Beltline Hwy @ Improve interchange to provide 12836 $2,!00,000 $11914,000 $1,914,000 $0 O 622 NO estimate revisions
Coburg Road adequate storagei Area FY07 and reduce by
Interchange i $186,000 are
............................. . .............................. i administrative)
Page 9 of 10
Central Lane MPO DRAFT FY2005-2007 MTIP Project Table December 1, 2004
DRAFT FY05-07 MTIP with annotations showing changes from Adopted/Amended FY04-06 MTIP
-- as of Dec l, 2004 --
Fiscal Year
ODOT FY05~ FY06 FY07~ Total RTP Regional NOTES
i ] Total Cost Federal Funding Project Emissions Modifications to FY(M- Can be amended
Project Project Description Key i FY05-07 Cost FY05 Source
New
Number Federal $ ! Other $ Federal $ i Other $ Federal $ i Other $ 07 Number: Analysis 06 MTIP to get to Draft Project? administratively
! i FY05-07 MTIP by TPC?
Move "land acquisition"
from FY04 to FY05 and
i increase amount from
Interchange Phase One i . Not in CATS $1,260,000 to NO
I-5 @ Beltline FY05: Land Acquisition 13281ii$3'950'00( $17.000.00C $20,950,000 $0 OTIA,O 606 NO (must be adopted
FY06: Construction i Area $3,950,000.existing constructionAIS° move by MPC)
i funding from FY05 to
FY06
.............................. i ............................ i Move $5,000,000 in
existing funding from NO
Interchange
Phase
Two
12833 i $5.000.00(; $2,000,000 $7,000,000 $0 O 606 Not in CATS FY04 to FY05 and add NO (must be adopted
I-5 @ BeEline FY05: Design & Land Acquisition Area $2,000,000 in funding by MPC)
.............................. ............................. in FY07 YES
(moving
projects
~q.4..17 _et ~:~!c!d St., Ur~!t ~., P:.'I. ~.; i COOT request to
OP. ! 2~_ (WEP) FY_nd: Eng!nc:.".'n~ & P. OW; FYO5: i e4 ~ ~Q.~ ~nr i i change title and between years
West Euqene r.~,. ,~.^~ 7990 ........... i $15,587,000 B15,587,000 $0 O 336 Not in CATS description and move NO within MTIP
..............i i pedod and minor
Parkway (lA) 4 lane new construction, Seneca Rd to i Area existing funds from changes in name
BeEline Hiohwav i FY05 to FY06
&
description
are
.............................. i administrative)
I-105: Willamette i RTP
Not
in
CATS
River - Pacific Preservation 10349 i $14,519,000 ! i ~14,519,000 $0 O Finance Area
Highway ............................. i i Policy #2
OR99: Barger (combined ~ RTP Not in CATS
Avenue to Preliminary Engineering for 12814 i $200,000 i $200,000 $0 O Finance
Washington / Preservation Project 12815) ii Policy #2 Area
Jefferson
OR99 (7~h St) at Imorove sianina and stdoino i TS._~.I Not in CATS ODOT request for new NO
Euqene-Sprfnqfield FY06:desiqn 13661 i $13.5001 ~;1,50( $30,600i $3.400 ,~49,000 $44.100 STPSFTY Roadway Area project YES (must be adopted
Hiahwav FY07; land oumhase i i Policy #1 -- by MPC)
Realian lanes and orovide dual riaht
TSI
NO
OR99 7th Street at tums i" __
Garfield FY06: desiqn 13660i ~571600i! $6,40( $657,900ii $73,10( $795,00(~ $715.500 STPSFTY ~R°adwa'L' Not --Areain CATS COOT requeStproject for new YES (mustbybeMPC)adopted
FY07: land oumhase
...... ~- ~ .......... ~.~ ~^,~,, ..... m .... ~ $~ $0 O-T-IA l;~-e~.y-#q~ ............ FY04 project
· '-" .............. Fr:nu.!!~ ?'."J., OR99, :.,'~- *.he UPRP, j j
TOTALS $25,026,5601 $54,289,98~ $18582020i $64,065,15(; $3508100!$19911 90(
FY05 i $79,316,545 FY06:i $82,647,17(; FY07:!$23,420,00(
age 10 of 10
Central Lane MPO DRAFT FY2005-2,007 MTIP Project Table Uecember 1,