HomeMy WebLinkAboutAdmin Order 58-15-21ADMINISTRATIVE ORDER NO. 58-15-21 of the Executive Director of the Public Works Department APPROVING THE AMERICANS WITH DISABILITIES ACT TRANSITION PLAN FOR ACCESSIBILITY IN PUBLIC RIGHTS-OF- WAY. The Executive Director of the Public Works Department finds that: A. Under the provisions of Chapter IV, Section 16 of the Eugene Charter of 2002, the City Manager is designated as the administrative head of the City, and is specifically authorized to appoint and remove all employees (except as otherwise provided in the Charter), and to enforce all ordinances of the City. B. Pursuant to that authority, I have been designated as Executive Director of the City's Public Works Department. My appointment has most recently been affirmed by the City Manager's Administrative Order No. 21-13-01. In such capacity, I have the responsibility for supervision of the Public Works Department and its employees. C. The Americans with Disabilities Act Transition Plan for Accessibility in Public Rights -of -Way (R -O -W ADA Transition Plan) has been developed to address accessibility within the City's public rights-of-way for persons with disabilities. Accessibility outside the City's public rights-of-way for persons with disabilities is addressed in a separate ADA Transition Plan. D. The R -O -W ADA Transition Plan: 1. Lists physical barriers in the rights-of-way that limit accessibility of persons with disabilities; 2. Describes methods to be utilized to remove the barriers; 3. Includes a schedule for taking the necessary steps to achieve compliance (requirement for curb ramps specifically); and 4. Includes the name of the official responsible for transition plan implementation. Now, therefore, based on the above findings which are hereby adopted: IT IS HEREBY ORDERED THAT: 1. The Americans with Disabilities Act Transition Plan for Accessibility in Public Rights -of -Way attached to this Order as Exhibit A is hereby approved effective July 1, 2015, and Administrative Order - Page 1 of 2 shall be utilized by staff in the Public Works Department in addressing accessibility within the City's public rights-of-way for persons with disabilities. 2. Copies of this Order shall be forwarded to all Public Works Department Division Managers. Dated this -ZA;,& ay of June, 2015. RIM Administrative Order - Page 2 of 2 Of �64-� Ku Corey, ExecuDirector Public Works De meat CITY OF EUGENE Exhibit To Administrative Order 58-15-21 Eugene Americans with Disabilities Act Transition Plan for Accessibility in Public Rights -of Way 2015 Official Responsible for Transition Plan Implementation: Kurt Corey, P.E. City of Eugene Public Works Executive Director 101 E. Broadway, Suite 400 Eugene, Oregon 97401 (541)682-6826 City of Eugene, Oregon Americans with Disabilities Act Transition Plan for Public Rights -of -Way Acknowledgements Project Oversight/Project Sponsor Mark Schoening, Public Works / Engineering City Engineer Project Management Oversight Fred McVey, Public Works / Engineering Engineering Data Services Manager (Retired), Information Team Project Manager Nancy Burns, Public Works / Engineering Management Analyst, Information Team ADA Transition Plan for Public R/W Oversight Committee Erica Abbe, Central Services / City Manager's Office Equity Accessibility Analyst Reed Dunbar, Public Works / Engineering Associate Planner, Transportation Team Travis Hargitt, Planning & Development / Community Development Parking Program Manager Eric Johnson, Public Works / Maintenance Surface Operations Manager Tom Larsen, Public Works / Maintenance Traffic Engineer Wayne Masoner, Public Works / Maintenance R/W Technical Supervisor, Surface Operations Matt Rodrigues, Public Works / Engineering Principal Civil Engineer, East Project Team Jenifer Willer, Public Works / Engineering Civil Engineer, Darwin Project Team (Pavement Preservation Program Manager) Special Thanks to additional Public Works staff: Carla Spangler & Angie Tennent for the ramp inventory field data collection; Carola Eklund for GIS integration and data analysis; Jim McLaughlin, Justin White and Brian King for iPad application development and Maintenance Management System (MMS) integration, and Jenifer Willer as lead editor for the Plan. City of Eugene, Oregon Americans with Disabilities Act Transition Plan for Public Rights -of -Way Acknowledgements............................................................................................................................................. 0 1. Introduction.................................................................................................................................................. 2 1.1 Goals & Objectives................................................................................................................................... 2 1.2 City ADA Transition Plan History.............................................................................................................. 2 2. Legal Requirements...................................................................................................................................... 2 2.1 Federal...................................................................................................................................................... 2 2.2 State.......................................................................................................................................................... 4 2.3 City............................................................................................................................................................ 4 3. Pedestrian -Accessible Facilities within the Public Rights-of-Way................................................................ 5 3.1 Specified in ADA Guidelines..................................................................................................................... 5 4. Methods to Remove Barriers to Pedestrian -Accessible Facilities................................................................ 5 4.1 Project Types Generating Barrier Removal Activities............................................................................... 6 4.2 ADA Exceptions......................................................................................................................................... 7 5. Factors that Influence Barrier Removal Schedules...................................................................................... 7 5.1 Prioritization Criteria................................................................................................................................ 7 5.2 Funding Sources....................................................................................................................................... 8 6. Transition Plan Schedules............................................................................................................................. 9 6.1 Initial Schedule for Curb Ramps and Accessible Pedestrian Signals........................................................ 9 6.2 Future Implementation Schedule........................................................................................................... 10 7. Official Responsible for Transition Plan Implementation........................................................................... 10 8. Public Outreach and Participation.............................................................................................................. 10 8.1 Draft Transition Plan............................................................................................................................... 10 8.2 Procedures for Requests for Barrier Removal and Grievances.............................................................. 11 9. Appendices..............................................................................................................................................12 City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 1 I. Introduction 1. .1 Goals & Objectives The City of Eugene ("the City") Americans with Disabilities Act (ADA) Transition Plan for Public Rights -of -Way ("the Plan") is created as a plan separate from the City's existing ADA Transition Plan in order to better address accessibility specifically within the City's public rights-of-way (R/W) for persons with disabilities. In addition, the Plan recognizes the goals of the Architectural and Transportation Barriers Compliance Board's (Access Board) proposed guidelines for the design, construction, and alteration of pedestrian facilities in the public R/W as published for public comment on July 26, 2011 (and published with corrections on July 29, 2011) in the Federal Register, 36 CFR Part 1190, Docket No. ATBCB 2011-04. (2011 Notice of Proposed Rulemaking or NPRM). The City's commitment to safe and equitable pedestrian accessibility within the R/W is expressed in various plans and documents (outlined below) and considers the Plan to not be just a fulfillment of a federal requirement, but rather an instrument by which the City can provide a richer mobility experience, to the extent possible, to persons with disability within the community. 1.2 City ADA Transition Plan History Upon the adoption of the Americans with Disabilities Act of 1990, the City embarked on a comprehensive accessibility evaluation of its facilities. To date three such evaluations have been undertaken and completed in 1992, 2000, and 2008. After extensive public input, Phase 1 of the City's existing ADA Transition Plan, including a three fiscal -year schedule for completing prioritized accessibility projects, was approved in 1993. Subsequent phases of the existing Plan have been prepared and implemented and the existing Plan in 2012 represents Phase 7. While a schedule for curb ramp installation has always been a part of each phase of the existing Plan, the City is pleased to publish a companion ADA Transition Plan that more specifically and comprehensively addresses accessibility within the R/W. Upon adoption of the Transition Plan for the Public Rights of Way, the City will have two ADA Transition Plans, one specific to accessibility outside the R/W and one specific to accessibility within the R/W. 2. Legal Requirements Discrimination against persons with disabilities is prohibited on federal, state, and local levels and enforced with enacted laws and regulations and approved/accepted policy plans and documents. A summary of those edicts most closely related to the funding, design, construction, and alteration of pedestrian facilities in the R/W to ensure access by pedestrians with disabilities is provided below. The following is a summary of various federal, state, and local ADA -related plans and documents. 2.1 Federal Title Vl of the Civil Right Act of 1964, [42 U.S.C. 2000d-1] Title VI prohibits discrimination on the basis of race, color, or national origin in programs and activities receiving federal assistance. Section 504 of the Rehabilitation Act of 1973 [29 U.S.C. 794] Section 504 prohibits discrimination against individuals with disabilities under any program or activity receiving federal financial assistance. The DOT routinely provides such assistance to state and local governments for the development of transportation networks. City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 2 Section 109 of Title 1 of the Housing and Community Development Act of 1974 [42 U.S.C. 5309] Section 109 prohibits discrimination on the basis of race, color, national origin, sex or religion in programs and activities receiving financial assistance from the U.S. Department of Housing and Urban Development's (HUD) Community Development and Block Grant Programs. Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) The ADA prohibits discrimination against individuals with disabilities and Title II of the ADA applies specifically to state and local governments. The Department of Justice (DOJ) issues Title II regulations, with the exception of those regulations specific to public transportation and related accessibility standards for the design, construction, and alteration of facilities which are issued by the Department of Transportation (DOT). The DOT's current ADA standards became effective in 2006. Title 11 of the ADA [298 CFR Section 35.150(d)] Title II requires that a public entity of 50 or more employees complete a "self-evaluation" by which the entity must develop a grievance procedure, designate an individual to oversee Title II compliance, develop a transition plan if removal of barriers is necessary to achieve compliance, and to retain the self-evaluation for three years. The transition plan should contain, at a minimum, the basic components listed below: 1. List of physical barriers in the R/W that limit accessibility of persons with disabilities; 2. Description of methods to be utilized to remove the barriers; 3. Schedule for taking the necessary steps to achieve compliance (requirement for curb ramps specifically); and 4. Name of official responsible for transition plan implementation. An opportunity for public comment on the transition plan shall be made available to interested persons, including those with disabilities or organizations representing individuals with disabilities. A copy of the transition plan shall be made available for public inspection. The Department of Justice published revised regulations for Title II of the ADA in 2010. These 2010 regulations adopted the revised, enforceable accessibility design standards called the 2010 ADA Standards for Accessible Design (2010 Standards) and permitted the 1991 Standards to be used until March 14, 2012. Access Board's Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right -of Way (2011 NPRMs, 36 CFR Part 1190, Docket No. ATBCB 2011-04) The Access Board's proposed guidelines for the design, construction, and alteration of pedestrian facilities in the public right-of-way are to ensure these facilities are accessible and usable by pedestrians with disabilities. These guidelines were first published for public comment on July 26, 2011, with corrections issued on July 29, 2011, and the comment period was reopened on December 5, 2011 per requests from the National Association of Counties, the National League of Cities, and the U.S. Conference of Mayors (to close February 2, 2012). When the guidelines are adopted by the US Department of Transportation (DOT), with or without additions and modifications, they will become the accessibility standards with mandatory compliance issued by other federal agencies implementing the ADA, Section 504 of the Rehabilitation Act, and the Architectural Barriers Act. 1 Notice of Proposed Rulemaking (NPRM) City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 3 In the interim the DOT's Federal Highway Administration (FHWA) has advised, in response to an inquiry from the City (April, 2012), that "...While the FHWA has not issued any guidance document on this issue, we are advising ... that either the 2005 Revised Draft Guidelines for Accessible Public Rights -of -Way (2005 PROWAG2) or the 2011 Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way (2011 NPRM) should be considered best practices for new construction and alteration of facilities within the public rights-of-way in order to ensure ADA compliance." It is specifically noted in the guidelines that the proposed guidelines do not address existing facilities unless they are included within the scope of an alteration undertaken by the agency. This standard has been typical of all previously adopted or proposed guidelines in that the guidance only applies to new or altered facilities. 2.2 State Oregon Revised Statutes Chapter 447 - Standards and Specifications for Access by Persons with Disabilities (sections 447.210 to 447.310) 477.310 Standards for Curbing: Provided for the construction of curb cuts or ramps and minimum standards for those items whenever a curb or sidewalk is constructed or replaced at any point in a block which gives reasonable access to a crosswalk. 2.3 City Eugene Code (EC) Chapter 7 - Public Improvements 7.090 Temporary Work: Specifies that construction activities shall not impede safe and accessible pedestrian movement and that when such activities block public sidewalks that ADA - accessible routes shall be provided. Temporary events and facilities such as street fairs, parades, and vending carts must also meet accessibility criteria. 7.365 Americans with Disability Act (ADA) Ramp Standards: Outlines the requirement for privately engineered public improvements to include the design and construction of (or provide funding for) ADA access ramps within and adjacent to the development site. Owners of single corner lots and lots facing t -intersections are also required to construct ADA access ramps as part of their sidewalk construction. Public Improvement Design Standards (P1DS) Manual Initially adopted in 2007 by Administrative Order and most recently updated in 2011, this manual imposes requirements and restrictions with respect to the design, location, and construction of public improvements as per EC 7.085. Details of ADA—compliant design standards and references to ADA -related publications are provided throughout the manual. Standard Specifications for Construction — February 2, 2015 The City's current specifications for construction are comprised of the 2015 Oregon Standard Specifications for Construction (Oregon Specifications) as modified by City drawings and Amendments. Eugene Arterial and Collector Street Plan (ACSP) —1999 Most recently updated in 1999, this plan supports provision of facilities for people with disabilities in all street improvement and construction projects. The City's standard plans and Z Public Rights -of -Way Accessibility Guidelines (PROWAG) City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 4 specifications are applied to each specific project to achieve the best possible fit with existing conditions and still meet or exceed ADA. Design Standards & Guidelines for Eugene Streets, Sidewalks, Bikeways and Accessways —1999 This adopted document, included as an appendix to the ACSP and included as Appendix F in the PIDS Manual (see above), provides the standards by which the referenced facilities must comply including new construction, reconstruction, and upgrades to same. 3. Pedestrian -Accessible Facilities within the Public Rights -cif -Way 3.1 Specified in ALBA Guidelines Compliance with the ADA is expected to be met for all permanent and temporary facilities located in the R/W when either newly constructed or altered, and when elements are added for pedestrian use. The types of facilities cited by the Access board that must be readily accessible and usable in the R/W by pedestrians with disabilities are listed below: • Sidewalks, pedestrian overpasses and underpasses, and other pedestrian circulation paths including requirements for pedestrian access routes, alternate pedestrian access routes when pedestrian circulation paths are temporarily closed, and protruding objects along or overhanging pedestrian circulation paths; • Pedestrian street crossings, medians and pedestrian refuge islands, including requirements for curb ramps or blended transitions, and detectable warning surfaces; • Pedestrian street crossings at roundabouts, including for detectable edge treatments where pedestrian crossing is not intended, and pedestrian activated signals at multi -lane pedestrian street crossings; • Pedestrian street crossings at multi -lane channelized turn lanes at roundabouts and at other signalized intersections, including requirements for pedestrian activated signals; • Pedestrian signals, including requirements for accessible pedestrian signals (APS) and pedestrian pushbuttons; • Transit stops and transit shelters for buses and light rail vehicles including requirements for boarding and alighting areas at sidewalk or street level, boarding platforms, and route signs; • Pedestrian at -grade rail grade crossings, including requirements for flangeway gaps; • On -street parking that is marked or metered, and passenger loading zones; • Pedestrian signs, including requirements for visible characters on signs and alternative requirements for Accessible sign systems and other technologies; • Street furniture for pedestrian use, including drinking fountains, public toilet facilities, tables, counters, and benches; • Ramps, stairways, escalators, handrails, doors, doorways, and gates. 4. Methods to Remove Barriers to Pedestrian -Accessible Facilities A variety of processes by which capital facilities in the R/W are designed, constructed, and altered provide opportunities to address removal of barriers to pedestrian accessibility for persons with disabilities. Some processes are generic to all types of facilities while others are tailored to a specific facility as outlined below: City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 5 4.1 Project Types Generating Barrier Removal Activities Capital and Maintenance Pavement Resurfacing Projects 23 CFR 151 requires that whenever streets, roadways, or highways are altered, Agencies shall provide curb ramps where the street level pedestrian walkways cross curbs. On July 8, 2013, the U.S. Department of Justice and the Department of Transportation issued a Joint Technical Assistance memo further explaining the requirements to provide curb ramps when streets are altered through resurfacing projects. City streets in need of resurfacing via the City's active Pavement Preservation Program (PPP) undergo rigorous multi -agency and multi -departmental evaluations to ensure ADA compliance during the course of project scoping, preliminary and final design, construction, and inspection. The capital resurfacing program is the primary source for new and altered ramps in the City. The Public Works Maintenance resurfacing program primarily focuses on streets that have not been constructed to a City standard as they are generally in poor condition and capital funds are not available for these streets by policy. Due to their nature, they rarely have pedestrian facilities that would trigger retrofit requirements. If there are existing pedestrian facilities that do not comply with the 2011 NPRM guidelines on the Maintenance resurfacing project, they are required to be retrofitted to meet accessibility guidelines. New Development and Redevelopment within the Public Right of Way As private and public agencies construct new public facilities or reconstruct or alter existing public facilities, those facilities need to be constructed to meet current accessibility guidelines. Examples of these types of projects are: • Privately Engineered Public Improvement (PEPI) - The City permits public improvements to be privately engineered and constructed via the PEPI permit process. Such improvements are typically development driven; whereas, City capital projects are typically community driven. PEPI plans are submitted to the City for review, approval, and inspection and are subject to the same evaluation for ADA compliance as pavement resurfacing projects. • Building Permits — Private property owners that obtain building permits through the City's Planning Department are required to reconstruct pedestrian facilities altered or impacted by the permitted work to meet ADA compliance requirements. • Utility Permits — Utility companies obtain a right of entry permit in order to construct and maintain facilities located in the City right of way. In the course of the utility's work, if existing pedestrian facilities are altered or impacted, those facilities are required to be reconstructed for ADA compliance. • Other City Projects — Other City capital or maintenance projects that alter existing facilities may also trigger reconstruction of pedestrian facilities for ADA compliance and are subject to the same evaluation for ADA compliance as pavement resurfacing projects. In Response to Hazards Public Works' Maintenance Division staff addresses pedestrian safety and mobility concerns that may arise from ad hoc hazards affecting accessibility in the R/W for persons with disabilities. Hazards are typically identified by field inspections by code enforcement staff in the Public Works Maintenance Division pursuant to Eugene Code 7.375 based on notifications from other departments and requests from the public. City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 6 Requests/Complaints Requests and complaints from the community regarding ADA accessibility in the R/W for persons with disabilities are triaged and assigned to the appropriate division within the Public Works Department for evaluation and recommendation of appropriate action. According to City Code, section 7.357, "the owner of land abutting a sidewalk shall maintain the sidewalk and driveway approaches in good repair and safe condition." While public sidewalks are inspected periodically by City staff, the City primarily relies on public requests or complaints to investigate sidewalk condition and initiate corrective action. Public request may be made in the same process as described in section 8.2, below. 4.2 ADA Exceptions Where existing physical constraints make it impracticable for altered facilities to fully comply with new construction requirements; compliance is required to the extent practicable within the scope of the project. Examples of potential physical constraints described in the NPRM include, underlying terrain, right of way availability, underground structures, adjacent developed facilities, drainage, or the presence of a notable natural or historic feature. Cost alone is not considered a constraint. The Department of Justice regulations have deemed, "the additional cost of alterations to provide an accessible 'path of travel' to the altered area disproportionate when it exceeds 20 percent of the cost of the alteration to the 'primary function' area. (See 28 CFR 35.151(b)(4)(iii))." (2011 NPRM Section by Section Analysis page 21) The determination of a physical constraint and compliance to the maximum extent practicable is made on a case-by-case basis and the justification(s) for the decision must be well-documented. For Capital and PEPI projects, this documentation must be included in the design exception request process and requires approval of the City Engineer. 5. Factors that Influence Barrier Removal Schedules 5.1 Prioritization Criteria The City has established a three-tier prioritization strategy for addressing barrier removal in the public right-of-way. The prioritization reflects the adjacent land uses that generate higher levels of pedestrian trips and responds to the network needs of pedestrians. Given limited funding, prioritization allows the City to address barrier removal in locations that are well -traveled first, and respond incrementally to complete barrier removal in the pedestrian network over time. Establishing discrete priorities also increases the likelihood of attaining funding sources, such as grants, since funding agencies generally award funding based on a local assessment of need. Priority 1: State/Local Government and Public Use Facilities • State/Local Government Buildings • Hospital/Medical Clinics • Schools • Public Parks • Public Transit Systems • Access to Shared Use Paths • High Use Areas or Facilities that serve Alternative ly-Abled Populations City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 7 Priority 2: Places of Public Accommodation and Employment • Major Commercial and Retail Sites • Major Employment Sites; e.g. Downtown • High -Density Multi -Family Housing Developments • Places of Public Assembly r Priority 3: Other considerations: Facilities that don't fall into the above priorities, may still be improved based on other considerations, including but not limited to, individual service requests, geographic connectivity, and project/funding requirements. Regarding curb ramps, 28 CFR Section 35.150 which specifies requirements for agency Transition Plans, requires that the Transition Plan schedule give "priority to walkways serving entities covered by the Act, including State and local government offices and facilities, transportation, places of public accommodation, and employers, followed by walkways serving other areas." This regulation is reflected in Priority 1 and 2 described above. This three-tier prioritization schedule was used initially to develop the overall Transition Plan schedule and will continue to be used by the City in planning and scheduling individual projects. 5.2 Funding Sources Typical funding sources for barrier removal are as follows: Curb Ramp and Accessible Pedestrian Signal Installation Programs Typically funded by federal Community Development Block Grant (CDBG) money. CDBG-eligible activities are identified in the Housing and Urban Development (HUD) Consolidated Plan, a five- year plan with one-year action plan increments established by the cities of Eugene and Springfield (see section 9.3). Applications and funding approval are made on an annual basis, but because this is a competitive program, the City is not guaranteed to receive funding from this source every year. Pavement Resurfacing (Pavement Preservation Program) Projects 23 CFR 151 requires that whenever streets, roadways, or highways are altered, to provide curb ramps where the street level pedestrian walkways cross curbs. On July 8, 2013, the U.S. Department of Justice and the Department of Transportation issued a Joint Technical Assistance memo expanding on the requirements to provide curb ramps when streets are altered through resurfacing projects. It is the City's policy to fund curb ramp improvements from the same source funding the alteration that triggers the requirement for curb ramp installation. Pavement resurfacing projects have been funded through a variety of sources including revenues from Local Gas Tax, Local Bond Proceeds, Road Operation Funds, Transportation Systems Development Charges (impact fees), and Federal/State Regional Grants. Other Sources While the above two sources fund a majority of the barrier removals within the public right-of- way, other sources used by the City of Eugene have included Safe Routes to Schools, other federal/state and special grants, Public Works Maintenance Division operations funding, Parking Services, and private development. City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 8 6. Transition Plan Schedules 6.1 Initial Schedule for Curb Ramps and Accessible Pedestrian Signals Title II of the ADA specifically requires a schedule for elimination of barriers to accessibility due to curb ramps. This current Plan schedule primarily focuses on sidewalk (curb) ramps and pedestrian signals. Based on the inventory of the ramps, 12,392 ramps do not meet the guidelines described in the 2011 NPRM. Of the ramps that do not meet the 2011 NPRM guidelines, 4,080 are located in Priority 1 areas and 3,569 are located in Priority 2 areas. This inventory data needs additional refinement to incorporate: Maximum extent feasible design Technical limitations of data collection equipment (level of accuracy) Regarding pedestrian signals, 228 signalized intersections do not have accessible pedestrian signal devices within the Urban Growth Boundary. Of the signalized intersections without accessible devices, 131 are located in Priority 1 areas and 83 are located in Priority 2 areas. The City of Eugene is committed to a reasonable and responsible schedule to bring the remaining curbs and signalized intersections into ADA compliance. Most of this work will take place as alterations included in capital projects. The current Capital Improvement Program (CIP) (FY 16 — 21) identifies several sources of funding for capital projects for the next five year period. The following capital projects and programs identified in the CIP (FY 16 -21) are potential sources for curb ramp and APS alterations and construction: • Neighborhood Transportation Livability • Traffic Operations Improvement Program • Traffic Signal Improvements and Upgrades • Pavement Preservation Program • Pavement Preservation Program —Transportation Bonds • Amazon Active Transportation Corridor Project • Northeast Livable Streets Project • Services for New Development/Grant Matching Funds Transportation As discussed in Section 4, above, regarding methods for barrier removal, in addition to the capital program identified, other sources for curb ramp and,APS alterations and construction are private development and maintenance activities. Based on this variety of sources, the following schedules were developed for curb ramps and APS: City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 9 Estimated # of Estimated # of APS Time Period Curb Ramps added to intersections per year per year 2015 —2021 350 6 2021 — 2053 200 6 2053 —2071 200 0 Total Ramps 12,392 - (2015 — 2071) Total APS - 228 City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 9 6.2 Future Implementation Schedule The City intends to review and evaluate the transition plan, the schedule and the ADA program for the right of way on an annual basis. The review and evaluation will include the following tasks: • Annually update curb ramp and APS inventory data as projects are completed. All projects are inspected during construction and upon completion of the work to ensure compliance; • Annually assess progress on an end -of -calendar year schedule and make any recommendations to administratively update schedules and Plan documents; • Review requests for service and grievances received throughout the year and evaluate decision making and responsiveness; • Post annual evaluation results to the public website. i. Official Responsible for Transition Plan Implementation Kurt Corey, P.E. City of Eugene Public Works Executive Director 101 E Broadway, Suite 400 Eugene, OR 97401 541-682-6826 8. Public Outreach and Participation 8.1 Draft Transition Platz An opportunity for public review and comment on the transition plan was made available to interested persons, including those with disabilities or organizations representing individuals with disabilities. The City's self-evaluation and input received during the public comment period will be retained for three years. There were three primary goals for the public outreach activities prior to adopting the plan: 1. Meet Title II requirements for public comment opportunity. 2. Inform public about City's plan and processes regarding removal of barriers to accessibility within the right of way. Provide information to assist interested parties to understand the issues faced by the City, alternatives considered and planned actions. 3. Obtain public comment to identify any errors or gaps in the proposed accessibility transition plan for the public rights of way, specifically on prioritization and grievance processes. A Plan review and comment period between May 4, 2015 and May 31, 2015 was provided prior to final Plan preparation for adoption. In order to inform the public about the availability of the City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 10 Estimated # of Estimated # of APS Time Period Curb Ramps added to intersections per year per year (2015 —2053) 6.2 Future Implementation Schedule The City intends to review and evaluate the transition plan, the schedule and the ADA program for the right of way on an annual basis. The review and evaluation will include the following tasks: • Annually update curb ramp and APS inventory data as projects are completed. All projects are inspected during construction and upon completion of the work to ensure compliance; • Annually assess progress on an end -of -calendar year schedule and make any recommendations to administratively update schedules and Plan documents; • Review requests for service and grievances received throughout the year and evaluate decision making and responsiveness; • Post annual evaluation results to the public website. i. Official Responsible for Transition Plan Implementation Kurt Corey, P.E. City of Eugene Public Works Executive Director 101 E Broadway, Suite 400 Eugene, OR 97401 541-682-6826 8. Public Outreach and Participation 8.1 Draft Transition Platz An opportunity for public review and comment on the transition plan was made available to interested persons, including those with disabilities or organizations representing individuals with disabilities. The City's self-evaluation and input received during the public comment period will be retained for three years. There were three primary goals for the public outreach activities prior to adopting the plan: 1. Meet Title II requirements for public comment opportunity. 2. Inform public about City's plan and processes regarding removal of barriers to accessibility within the right of way. Provide information to assist interested parties to understand the issues faced by the City, alternatives considered and planned actions. 3. Obtain public comment to identify any errors or gaps in the proposed accessibility transition plan for the public rights of way, specifically on prioritization and grievance processes. A Plan review and comment period between May 4, 2015 and May 31, 2015 was provided prior to final Plan preparation for adoption. In order to inform the public about the availability of the City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 10 Transition Plan for review, a paid advertisement was placed in two local newspapers of record, a news release was distributed to local media, announcements were made in various City newsletters, and copies of the Plan or internet hyperlinks were provided at a number of locations, including with several key audiences. One comment was received during the public comment period and indicated that the draft plan did not meet the reviewer's expectations. There were two primary themes of the comment that are summarized as follows: Addressing the installation of speed humps or bumps on streets that don't have sidewalk should be included in the Plan and whether there should be public hearings prior to the adoption of the Plan. Engineering staff personally contacted and met with the commenter to discuss the specifics of the street of which he was concerned. A copy of the comment is attached in the appendix. As noted above, the City uses the 2011 NPRM for design standards within the rights-of-way. Within the section -by -section analysis of the proposed rulemaking, the U.S. Access Board requested information from the public on this issue of "shared streets" that do not have curbs or delineated sidewalks and design features to facilitate wayfinding along these streets, but no design guidance or standards were included in the proposed rulemaking. Nor are there other applicable standards addressing this issue at this time. There are a variety of potential barriers that may be present or occur within the public rights-of- way. This Plan does not preclude responding to barrier removals, but does describe a specific schedule for barrier removal relating to sidewalk access ramps and accessible pedestrian signals. While future updates to this Plan may include schedules to remove or address other barriers within the rights-of-way, this current Plan will remain focused on the two elements selected at this time. A public hearing was not scheduled for adoption of this Plan. It is proposed that this Plan be adopted by Administrative Order of the Public Works Director. This method of adoption does not require a public hearing process nor is one required by Title II of the ADA that sets forth the requirements for agency transition plans. 8.2 Procedures for Requests for Barrier Removal and Grievances Entities subject to Title II of the ADA are required to "adopt and publish a grievance procedure" as part of the Transition Plan. Public Works has developed a two-tiered approach in order to comply with the requirement for grievance procedures. The first tier is a "Request for Service" and the second tier is a "Grievance". A Request for Service (RFS) is used to request accommodations or barrier removal. A request for service may be filed in a variety of methods — in person, by telephone, by mail and on-line: Call (541)682-4800 Email: pwmaintenance@cii.eugene.or.us or adaplan@ci.eugene.or.us Online: www.eugene-or.gov (City of Eugene website), selected "Contact Us" at the top of the page The request will be recorded in Public Works' Maintenance Management System (MMS). The recording of the request is critical for recordkeeping and to evaluate the Department's response to ADA -related requests. City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 11 Initial acknowledgement of the request for service will occur within 5 business days of receipt of the request. The investigation and response to the request will occur within 30 calendar days from the date of acknowledgment. An ADA Grievance is used to report denial of access to a City facility, program, service or activity. A Request for Service must be filed prior to submitting a grievance and within 180 calendar days of the Request for Service response. Like the Request for Service, the City is required to keep detailed records and follow a strict timeline to ensure complete recordkeeping and evaluation of the Department's response to the grievance. The grievance will be recorded in the Public Works' MMS. • Initial acknowledgment of the grievance will occur within 5 business days of receipt of the grievance. • Initial staff contact and interview for information gathering will occur within 15 business days from the date of acknowledgment, although the complainant may decline to participate in the interview. • A written decision will be made within 15 business days from the initial staff contact/interview by the Public Works Section (Team) manager or designee. In addition, the decision will be provided in a format requested by the grievant. • If staff determines additional time is needed in order to make an informed decision, the decision timeline may be extended in 15 -business day increments upon notification to the grievant. Grievance decisions may be appealed to the Public Works Director or designee (Public Works Maintenance or Engineering Division Managers). • The Public Works Director, or designee, will meet with the grievant within 15 calendar days of the date of the appeal, unless declined by the grievant. • The Public Works Director, or designee, will issue a written decision within 15 calendar days of the meeting (or date meeting is declined) with the grievant. The decision will also be provided in a reasonable format requested by the grievant. This decision is final. See Appendix 9.4 for additional criteria and procedures to be used in responding to Requests for Service and Grievances. Any requests for service or grievances regarding issues within the right-of-way initially submitted to the Human Rights and Equity staff will be forwarded to Public Works staff. 9. Appendices 9.1 Priority Map Barrier Removal 9.2 (Reserved) 9.3 Record of Public Outreach 9.4 Requests for Service and Grievance Criteria and Procedures and Forms 9.5 Annual Plan Updates 9.6 Summary of State/Local Plans and Documents City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 12 9.7 Selected ADA Definitions as published by Access Board 9.8 Excerpt, Adopted 6 -year Capital Improvement Program (CIP) for Curb Ramps and APS 9.9 Administrative Order to Adopt Eugene ADA Transition Plan for Public Rights -of -Way (Insertupon adoption) City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 13 UJIMEmi ��J��I Film A A City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 14 se�lyy�T---rSO SZ OT---r--1 8Jf1 auabn3 N anon ,a slaaj3s — eaay z (auoud easy 6 (luoud papaaN sdwe}j sdwea 6wlsix3 °+ pua6a-1 i1 ti„a3rvaao, -,• . o^ rva�ai ° rv'! � .:.+ iS t 3� 3�w� i ` j � -:. � ,�'_� ,� �• ._._._._y .1 O j °mow � :.�.°� � ��'� aac �• �rvxzM •� 4' p oM3^a ea raaa3.w • tS�.W.. 99.o gM L % zil 1 ate_ i. J-4 � -,m N 3, ee i y: i • • \o Q t �' .'Adb' ��' °� o> '7 • 5 - Grvsx�. � •• y-� • f f s ! , S $ T vIS Y ,� O 4 4 Yor9_uTM� w O _�Rrv1>, O rvnwava3rrvw1 jf 9 �x 'tI• `'a • ..w .:: i. !N nvM,vrvo,vrvaa�ry � � a }=se •. • _ .�di a3 Q t • o Q•'.� NI ioas3aza . , � Cl” �j •t . z s ;; _ i y p• 1 oa aodad QD I'LL iaa��3Oa C.Jt aarvo��a I� 0 oda�'epJ w� lenowaa Jalaae8 - dew f4pol�d a -oa r oa�w Q ueld uol}isueal vav 4'6 x!pueddV Appendix 9.2 (Reserved) City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 15 Appendix 9,3 Record of Public Outreach City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Page 16 E� t1eW5 t"e ea5e May 4,201S CONTACT: Nancy Burns, ADA Transition Plan Project Manager, 541-682-6887 From Public Information Section, 541-682-5523 or 541-954-2938 FOR IMMEDIATE RELEASE Public Works Draft ADA Transition Plan Available for Review The City of Eugene Public Works Department has conducted an evaluation of its public rights of way and drafted a transition plan that outlines how the organization will continue to comply with ADA regulations and provide to the extent possible safe access within the rights of way for all individuals. Upon the adoption of the Americans with Disabilities Act of 1990, the City embarked on a comprehensive accessibility evaluation of its facilities. To date three such evaluations have been undertaken and completed in 1992, 2000, and 2008. After extensive public input, phase 1 of the City's existing ADA Transition Plan, including a three fiscal -year schedule for completing prioritized accessibility projects, was approved in 1993. Subsequent phases of the existing plan have been prepared and implemented, with the existing 2012 plan representing phase 7. While a schedule for curb ramp installation has always been a part of each phase of the City's existing plan, the intent of the current project is to ultimately draft a separate companion plan that more specifically and comprehensively addresses accessibility within the public rights of way. As part of this new draft transition plan, Public Works collected detailed data on over 15,000 sidewalk ramps and 250 pedestrian signals to develop transition schedules specific to these facilities. In addition to the inventory of ramps and pedestrian signals and schedules, the transition plan for the public rights of way also includes a system of barrier removal prioritization, information on how to request barrier removals from the right-of-way facilities, and an appeals process. An electronic copy is available on the City website at www.eugene-or.gov/adaplan. Paper copies of the draft transition plan for facilities in the public rights of way are also available at multiple locations: the Human Rights and Neighborhood Involvement Office (99 West 10th Ave, Suite 116), the Downtown Library (100 West 10th Avenue), the City Manager's Office (125 East 8th Avenue, 2"d Floor), and Public Works Maintenance Office (1820 Roosevelt Boulevard). The draft plan is available for public comment through May 31, 2015. Comments and questions may be submitted by e-mail to adaplan@ci.eugene.or.us or by calling (541)682-5277. Comment forms are also available at locations with paper copies of the plan. Assistance in filling out a comment form is available at the Human Rights and Neighborhood Involvement Office (99 West 10th Ave, Suite 116). Public Works Administration • City of Eugene • 101 E. Broadway, Suite 400, Eugene, OR 97401 Phone 541-682-8421 • Fax 541-682-6826 • www.eugene-or.gov/pw Administration, Finance, Recreation, Information Services, Planning and Development, and Cultural Services Administration (with the team name Elite Feet). Members of the City Council are encouraged to participate, either by forming a team or joining one of the existing City teams. City teams have fared well in past competitions. Last year, more than 1,900 people representing 175 teams participated in the Business Commute Challenge. In just one week, the BCC participants reduced more than 68,987 drive -alone miles, and reduced more than 70,200 pounds of carbon dioxide. Visit the website at www.commutechallenge.org for a list of activities and to sign up to participate. For more information, contact Claudia Denton, BCC team captain for Public Works Engineering, Claudia.M.Denton@ci.eugene.or.us. or 541-682- 5059, or contact Point2Point directly at commutechallenge@ltd.org. Public Works Draft Americans with Disabilities Act Transition Plan Available for Review The City of Eugene Public Works Department has conducted an evaluation of its public rights-of-way and drafted a transition plan that outlines how the organization will continue to comply with Americans with Disabilities Act (ADA) regulations and provide, to the extent possible, safe access within the rights-of-way for all individuals. This plan will be a separate companion plan to the City's existing ADA Transition Plan. In compliance with the Americans with Disabilities Act of 1990, phase 1 of the City s existing ADA Transition Plan was adopted in 1993, and included a three fiscal -year schedule for completing prioritized accessibility projects. Subsequent phases of the existing plan have been prepared and implemented. The existing plan represents phase 7. As part of this new draft companion transition plan, Public Works collected detailed data on over 15,000 sidewalk ramps and 250 pedestrian signals to develop transition schedules specific to these facilities. In addition to the inventory of ramps and pedestrian signals and schedules, the transition plan for the public rights-of-way also includes a system of barrier removal prioritization, information on how to request barrier removals from right-of-way facilities, and an appeals process. The draft plan is available for public comment through May 31. An electronic copy of the draft transition plan is available on the City website at www.eugene-or.gov/adal2lan. Paper copies of the draft transition plan for facilities in the public rights-of-way are also available at multiple locations: the Human Rights and Neighborhood Involvement Office (99 West 101h Avenue, Suite 116), the Downtown Library (100 West 10th Avenue), the City Manager's Office (125 East 8th Avenue, Second Floor), and Public Works Maintenance Office (1820 Roosevelt Boulevard). For more information, contact Nancy Burns, ADA Transition Plan project manager, at 541-682-6887. Love Food Not Waste Program Supports Seed to Supper Seed to Supper is a comprehensive, five-week beginning gardening course that gives novice, adult gardeners the tools they need to successfully grow a portion of their own food on a limited budget. The curriculum was written by the Oregon Food Bank and Oregon State University's Extension Service, and this year, for the first time, FOOD for Lane County is offering the classes at partner agencies. Huerto de la Familia will be offering classes in Spanish starting in May and FOOD for Lane County will also offer a class in Spanish later this year and a few other classes this fall. Volunteer educators who are either Master Gardeners or experienced vegetable growers are trained to teach the five-week class series. Classes are held at FOOD for Lane County partner agencies, including food pantries and low-income housing sites. Students have to attend four out of the five classes to receive a certificate of completion and some donated garden supplies, including Love Food Not Waste compost, Down to Earth organic fertilizers, seeds, and vegetable starts. For more information about this partnership, please contact Waste Prevention and Green Building Analyst Stephanie Scafa at 541-682-5652. EUGENE CITY COUNCIL NEWSLETTER PAGE 4 April 30, 2015 FOR THE RECORD Deafies May T at rhe upper --a Bates D. lean antes Community Ceou,.Blue Rivet 86.1 ua dl. Aprl m Remambnrces ta the Hem Jude by andie ns Chlldrens Research Cre ciao & Buda SeMce n Ar­aamn g Buyap rervazonti, ilL spdngfleld springfleltl Camain pgnns Rae Car Pacd,wa c.w Fpck airy sT at Eugene, d ed May 2 ham 93, of son,gfleltl dktl Arrangvnenrs by Malo, -11, Ami 30 No serve.�pba— WnerdlHomelnSpdrgflela Aoangemenu by grove paean - Fled Does- Fainly Mortuary In Eugene. so, of pt- I HIII, tlietl May Partin - Mme Wayne 3. Aos-no- by Musgrove penin, T3, d Eugene tlietl May —ay Maduary In Engem. 2. pmnge.a- by Musgrove Gatlomskl-DavidGalan" Famlly Maduary In Eugene. set 73, at springnad. dim Apol stn.. — N.I. ran. stone N. Amargemenis by An@es ". of Veneta, died April 28 's C .m &Burial ser Amng .us by A -- vice In spmgrleld clonouon & Budd servles in Green - PBilelm R. Green, spdoefi ld 74, at Vereu, died April 2s. No vxchiu- Michael Patrick Is lanretl. —9. Va.1w, 62, of spdngflei4 u by Andreamn's Cr died May L Araigemenn by matlon & Burial se.ce In Aulouben's Cremanan 88wta1 sioingfleld. sa.e. In Spdngpeld. Names, -Herman Dean Wilson - Dennie Wuato, Harms, 8$ of Veneta tllatl 61 of Springfleld, died ppol 2fl Apm 29. Aco bratian of nuc will Amangemenu hey A aso he Ism 3 p.m. 'H- 8 %a1 Cremabon 8 al Servkenln day, May 9, W. FlAnsol Hall In Sprtngfltltl. b, - CIN Arangemenrs Blood Carter by ,n uned.."N. Funeral Homeln luncrun Ciry. pomrsneeded today Naufmarr - Norman L ..gust ................ 43 May 4. A 99, of E. b, tlietl ONegmlve...............23 May 0. yMumusyl byANegle ................ 20 gmveMmllYMorwmrteh Mine, Eu- ANustive ................11 M,Iler-Patric noshay en BPa Utx ...... .....5 7l. of Fle.ta b died May L BNegallve .. . .. .. ..5 Arrangemenu by An AB Posmve.................1 Cremaaan & Burial servlcenln AB Negative . ..I sPdnghda tone Blase eentec nuwnp Miller - Curtis Falls Miller < st.. Is'Pen MaMay to 81, of Eugen, Bled May 4 Wed^esday hos 10 am. to 6 Arrangements by Mangrove m, Thursday ant Friday from FamllyMan uary 1.Eene, from 8 nam to330 p. m. and Saturday agam. [o S6k4B6 Osterbuhr Peggy Rase 9111 Bloatlmable:lle: University sterbute 75 at Blue Rlver of Oregon Ullts Plaza, East 13N Bled April 29 A co.batlon of Avenue antl Kincaid street. 10 life will be at 1 p.m. Thursday, a.m. w 4 y,m. s41684.911L CONIMUNrr Euge,ro50. ad New- Center and sa RE Free, Inns, ars Club - to am. Thurso matins 541.82 -naso m www. rmlnsur Presbyrerun eugme�m.9o�Ai , Chureh. 7 Coburg Road: Ban Rubicon society - Swamon of Allstate will tliscmz Thursday a[ Ne Kowloon ees- sslhllltles eolar alder ant 2222 Pi 541- 4853632. Mama Lump, Wage J,alva- P Internet secvdty as, small Eugere. Laeal ant sate Issues asses - 6 pm. --sy at Author talk - 6 P-.Thws Ba3em Asaac lb-. loo W tlaY a[ the Downtown Eugene tom Ara 11 Wyrkkal serue My Public Lroary, loth &Olive Ufesryte will taxa rets[ corpoate AUNar ant teacher glare Abu data bmatlws m tledl the co[e d Taber will speak as part of th hal.Mees m Ce -sin oss and NarNwext Writers neir bitty. Lan—isc,Iby Symonds.. n n: u. - Ihe Iiteary, Lane CommuNry Cal- 682-5450 o www.eugeneor. lege smart eudness oevdapmem gornlm.ry. r CALENDAR Eugene naxcomArl000n a— TOOAV Public Ubrary, t00 w. loth Ave. Public camm¢n[/pmpnsed water & ..cmc Fr2m6 budge, 54,682861] Board en5:,o p.m., EWEB 8aard wEDNESpAy Room Noah Innan9, 50o E. Sustalrsbli Comm sdon Mon Ave Leabum Dam roll b ,at, dveXrant property upda[, earoan Fee subcomminee 1 system tlevNoPment charges 99 Wa-. .Antao A. Work ..H." Jew pmt 561685]328 ve (nona.M.) session 56,692 -so V. on I,e[xganan ant ran .stab mans- Eugene school Boom - 5:15 acnans will precede the rtguWr p.m., Eduanon Centec 200 N. Mama. st. Ess Msianlnng Pmcros m Human aighu Commission At 630 ura,e <mn omHesress Work Gaup I.n.) session own labor n aunin, snit R Atli. norms At 7 o- regular bocoara ft , a9 W. IOP AA- room 109 a dxapmme Eugene hnmtlessness event dar— Sudbury Se -11 -as, school z .work pia. Kw 1,@ applimrbn 563 -]9o -T}3 - m City Council Boards and sualzhubulry Commis Commissiarrslouss -5M zlan Fconomc Development pm Saul Rcom Atriwn 8usuft.z subcommittee - 5 Dm, nota 99 W ION Ave 5416828A9]. .an._, Taphause It w, aroma Springfield plane ng Sat 682 501, 7. TGDAY Boz onv7ykesun ace.. Public Planning mmisan ] Ubary, loo W. loth ave, oan. . pm caundl chambers. Ciry Han non for Kathmandu recovery, 541 225 nnh SG sola[ public fearing wIN hearings anicial on 1, k e11absent met[ River Greenvray setback Butl9et Committer - 5:30 Ilne In Glenwood.541-T263610 Vincent Lee Bide 1948-2015 d . Vincent Lee Bide of Y.chan, OR passed away on April 22nd. 2015 m the i age of 67. He had endured a lengthy bout with a number of health issues with 3,e"r y' V dh, coWngeaidgrace V c beta in Vallejo, Califimm March lam I01h, 1948 to Forrest lames Bide and Mary Eloise (Md.m) Bitle. He wa' their fourth child. Growing up in An Air Fina family, Vince went to several schools before graduating from Creswell High School in 1966 a an Honor student. Vince is a Vietnam veteun. In July of 1968 Vince cut into the Army during the Vietnam War and served honorably bout March of 1970. Later in his life, the scam of that war would have a profound effect on his health The following year be received a Bachelor of Political Science degree and Phi beta kappa honors from the University of Oregon. ce went into the construction business working up and down the Northwest from California to Washington with his brother Jim. He was an expert earpomer, did fabrications, woodcarving, and even built his own home in Yachas. He was a handy an with many mlaus which also included art work, poetry, and writing. You can see soof this on his Finabook page. tame the 1980', Vince was briefly married an Lynnac 1— berry. Together they had two children. He loved his two daughters very much and was always proud of their a oeopluhrom. as well a his gmndkieb. He is survived by his daughters Elirabah Irene Bill, nowrving in the Army and Law Michelle Big, and her husband Hunter, and her children: Can, Keegan, Use th, Wyant, and L.Ann from Heloses, Texas He is also survived by his brothers James Bale of Brownsville, OR and Don Bile of Springfield. OR, some aunts, unties, many many coming, nephews, nieces and many friends be knew in Y.. U. He was preceded in death by his father, mother, and brotherGerald. A memorid service has at been determined yet bawe will have one in the near future. Tuesrt Y MAY 5. 2015 SCOTT tANDGREEN North Eugene Age: 65 Family Dental Previous elected experlenceu None Doe Oeeu ation: Retired small-0usmnss Toothache have website: None you doing EILEEN NITTLER Age: 47 - erasy things? Previous elected experience: None AP Oeeupadon: Social varke, at Holt ww.man[ihearing.mm'Wilesmin International Children's Services _. wehsitea eilewnatlmc,m Board: Candidate raises Berman issue Comirsed from Page A3 evaluation from the board. Although the board ben, Nittler said, the will need to meet behind board still needs W work closed doors for some to earn back some par- "human reaounces things," cut's trust Nittler said. "school board Jandipeen has not it ember are accountable turned requests from The In the public - Register -Guard for com- "The process needs to mem: be out in order to keep Landgreen, 65, worked (the pubBNs) trust m us," as a teacher for 22 year she said of evaluating Her - in California and Austro- man. "We'll have to dis- Ila before starting his own cuss things (publicly) that parcel delivery service in are uncomfortable" Eugene He was president As of Monday, latrines of the North Eugene High political action eommit- School booster club when tee, Elect Eileen Nittler, his son was a student has raised $8,895. Her there, and be worked with two biggest donors are a state program that helps the Portland -based no obtain training profit organization Stand and education after high For Children, which has school. provided $2,392 in ram- Landgrasn also worked paign services, and state as a YMCA director of Rep. Val Hoyle, D -Eugene, health and fitness. who has provided $1,452 Nittler criticized the in campaign signs. Stand board's decision last year for Children's mission is to not publicly evaluate to increase state and local Berman for both the 2013 funding for public schools. 14 school year and the cur- Landgreen has not rent year, formed a political action Emane obtained by The committee Register -Guard show that board members secretly negotiated with Berman Follow Josephine on for him to leave, in order Twitter @j_moolington. for him to avoid receiving Email josephine.mooling- a negative performance mn@ragisrerguard.com. Stephen Ronald Meyer 729//944 - 4242015 ' Stephen R_ Meyer, 70 f Monroe died `q Friday, April 24th as the result of an automobile -- - —idea. He was born July 29, 1944 in Sao Fano o, Coliform parents Robert and Tmdance Meyer. Mr. Meyer Mrved in be United States Monne Corps in Vietnam. He graduated from Oregon Seste University with a Bachelor of Fuse Arts. He marred Kathryn Fang,, no July 14, 1979 in Summedand, Calilbmia. Mr. Meyer beg hes pmfessiowl career st Hix Studios in Corvallis. Over she years, he owned and operated North West Phomgraphy and did wedding photography and free lance phamgmphy His last position from which he retired was wide Oregon State Lim—iry where he was responsible forjoumabsm/ meds photography for the school In his leisure time, he enjoyed tiding his eumos yde fishing and re,—g old c Mr. Meyer was known by fellow workrm, church embers and friends alike for his ability m make everyone fol welcomed wh:iNver the situation. He is survived by his wife of 35 years, Kathryn; two sons from a previous marriage with Carol, Daniel Gaffney and Joshua Gaffney; 4 gmndchddmn Ashley Gaffney, Tyler (Karriv) Gaffney, Aaron Gaffney, Elias Gaffney, one great-grandchild, .Autumn and many nieces and nephews. Memorial donations in Mr. May,?, name may be directed to the Ant Baptist Church Building Fund or the Wounded Wamor Project in care of McHenry Funeral Home 206 NW 5th SL, Corvallis, OR 97330, A Celebration ofLife will be held a 1:00 pm, Smurday, May 9th at the Ant Baptist Church in Inaction Cry. Please leave you thoughts and memories far the family ar ww,mehevryfuneralhome com. The City of Eugene Eugene Public Works Department 011Fhas drafted an AMERICANS WITH DISABILITIES ACT TRANSITION PLAN to address barriers to accessibility within the City rights-of-way. The proposed Plan Is available for review at these locations "www.eugweorgov/ADAplao -Human Rights and Neighborhood Involvement Office (99 West 10th Ave., Suite 116) • Downtown Library (IDO West fifth Ave.) -City Manager's Office (125 East 8th Ave, 2nd Fbor) • Public Works Maintenance Office (1820 Roosevelt Blvd.) Comments accepted through May 31st in these ways: -Email to ADAplanged.eugene.or,us -Commentform can be completed at the above locations -Assistance filling out a comment farm Is available at the Human Rights and Neighborhood Involve- ment Office (99 West IOth Ave., Sulte 116) •Call 541-6825177 f Joyce Alice Hunt 1927-2015 Joyce was bum ]Wy 34 1927 in Pleasant IhO, Oregon m Ha]le(webb)and Cecil Wheeler, dnceshng from pioneer families. She attended Pleasant Hill schools and Narthwe Christian College in }' E.9. onShe emarried Darl M Hunt on July 01, 1950 -rr - They were married almost 65 years. They fi ed in Ea[em Oregon and —cited for the Forest Service and Pon Orford, Oregon where she was briefly a ministers wife m 1955. They moved to Pleasant Hill and then built a new haus. on inherited land in 1966 - a place she loved. She worked also in local stationary stores. She had 4 children - Greg (Elvie), Gayle, Gary (Posta) and Glen (Low. She Itad l3 grandchildren, 3 step -children. and 13 great- gmndchRdren. She loved gardening, flowers, art pricials, navel and especially activities with homily, She is also survived by siblings - Verden, Gwca, C-1and Celia and cousin Orem and many other family me sobers. She was the perfect example of a Chri mu woman. She died April 29, 2015. A memorial service will be f- pm May 06, 2015 m the Tran[ Church of Christ (Jester). Contributions may be made to the church. Ronnie Layne Murphy 1950-2015 Ron L. Murphy, 64, Died nexpectadly an Monday, April 27µ2O15. Roo as bora an July 21, 1950 in Belton TK, the youngest of five boys. Ttc graduated from Villa Park High School in Villa Park CA and also received his Associates Degree from Fullerton College in Fullerton. CA. He was drafted into the Marines in January 1970 and served his emenry to honor no fit January 1972 which included a or in Viet Nam. Ron stetted working on car in his ice. and his passion became his life occupation until the time of his dram. Ron never met a wanger and will be remembered for his warm smile, his hardy laughter, and his quick wit. Spending rizi with family, going camping, fishing with his brother, watching Sei-Fi, the Oregon Ducks play and following Nascar wean some of his favorite ways to relax. Survivors Include his wife Kay, son Shannon Corpus of Eugene, daughter Tow.ix Lemay (Ken) of Spokane, WA, brothers Houston (Carol) of Creswell. OR, Curtis (Christine) of Eugene, pad Anthony (Linda) of South Dakam. JJe is also survived by se en grandchildren, Desme' Carter (Jemmy), Justin and Nathan Corpus all of Eugene and Alexi, Makenzie, Shaylee, and Lyvdce Lemay of Spokane, WA. One very special little angel washorn the day hcfmnRan pusscd away. Our first great grandson Jutish Ron was preceded in death by his parents, J.D. and Omega Murphy and his lumber David Murphy. A Memorial Seance will be held Saturday, May 9, 2015 at 10 am. az the Veterans Center, 1626 Willamene SL, GeREANTiaS North Eugene Family Dental Doe _ Toothache have you doing Let us ansvier any - erasy things? questi— you might have CALLTODAY! AP ww.man[ihearing.mm'Wilesmin n..d, Stea .a: PLEASE JOIN US FOR OUR _. Thursday, May 7 „ 3PM-bpm RSVP;(441) 687-8900 EVENT HIGHLIGHTS • Tourthe practice and meet Or,Oanie' • Hear from past and Current patients as they share their experiences and answer questions • Meet ourAllergall'aObagi*Coolsculptinga Care Credir"" expert free gift first 20 indivllalsto alive • Sign-up %vhh Care Credit- night of event - receive t0 a off saxes valued at $1000 or more DR. LEE B. / J DANIEL ■ AESTHETIC PiASTIC SURGERY =THE SPA SIDE Gateway Toanm istem drop -ins welcome, 6:30-7:45 pm, LCC Downtown. 101h Ave, info at toddk.pe@gmaiLcom. FREE Adult Children of Alcoholics Meeting 7 -bpm, Santa Oam Church of Christ,175 Santa Clam Ave- Santa Clara. Nal -Anon Meeting, 7pm, Wesley United Methodist Church, 1385 Oakway Rd. FREE Co -Depen dents Anonymous 12 -step Meeting, 7 -Bpm, Valley Methodist Church, 25133 E Broadway, Veneta. FREE. Workers of the World Meeting, 7pm, New Day Bakery, 449 Blair Blvd., ico.clasma.scatt@ gmaii.com. FREE Open Mic Poetry, 7:30pm sign- up, Cush Cafe, 3235 Railmad Blvd.,.11393-6822. FREE KIDS/FAMLLJES Baby Pop Music 9:30am, Daisy's Place,' 1244 Lawrence FREE Medicare Basics, 5:30pm, Beth- el Library, 1990 Echo Hollow Road. FREE Jewelry 101, 6:30-8:30pm, Michaels, 3318 Gateway St - 988 -0506. FREE LECTURES/CIASSES'Rede. fining Realness; Janet Mock discusses Tans justice and intersectionaliby Spin, EMU Ballroom, UD. FREE ON THEAIR'The Point, 9-9:30am, KPOV S&9FM.Anar- 0hy,Radio w/Jahn Zerzan, 7pm, KWVABS.SFM. _ Taste afthe. World w/Wagoma continues. See Saturday. OLRDOORS/RECREMION - Obsidians: Hike Little North Santa.. 9 miles, reg. at ohsitl- arg. GEARS Bike pub: Fox Hollow. 25-50 mees, gam, Alton Baker Park -Free- ' WREWs Wetland Wander.'Egnt Thousand Years of0in!' w/Karin Bards, Sam-3pm, reg at 338- 7046. FREE Wildflowers Wa&w/Gail Baker,10am-noon, Mt. Pisgah Arboretum, 34901 Frank Parrish Rd., 747-3&17 SS, members - FREE Pool Hall cominues- See Thurs- day, May 7. SOCIAtDANCE Eugene Falk - Dancers, weekly international folk dancing 6:45pm lessons, S3; 7:45pm dance, $3, Wille - mala re Adult Activby Center; 215 W. C St., Spfd., 344-7591. eailonga: Argentine Tango Milonga, lessons and open dance, 8.11 pm, Vat's Club,1626 Willamette St S4 -S8. SPIRITUAL Relationship w/Sa- cred Tents, Instructional Gasses based on tent by Dogm. 7-9pm, Eugene Zendo, 2190 Garfield St, call 302.496. FREE. VOLUNTEER Eugene Park Stew- ards Work Party, gam -noon, Hendricks Park 1800 Skyline Blvd- 510-4636. FREE - WEDNESDAY MAY 13 - NENEFns Oakshire, Inspires, SS of every pint sold goes to WJ Skate Park & Urban Plaza, OakshirePub, 207 Madison St; 654-5520. FARMERS MARIMS The Comer Market, fresh local produce,. noon-6pm, 295 River Rd, . 513-0527 Sweetwater Farm Stand, II farm produce, products & red- pes, 4-Gpm,1243 Rainbow Dr. Coast Fork Farm Sand cornin- ues. See Saturday. - GATHERINGS League of Womw Voters Unit Meeting, 10am, East Eugene, 342.8243; 2pm, Cin swell/Cimage Grove, 942-767& Spm, SW Eugene, 3434n8. FREE Nar-Anan Meeting 12.30pm, Springfield Lutheran Church, 15421 St, Spfd. FREE. Parkinson's Pius Support Group, 1:30pm, 207 E Fifth Ave., 345. 2986. FREE, Peace Vigil, 4:30pm, 7th & Pead. FREE. Asperge7s Support Group, . "pm, 541 Willamette St FREE. Co -Dependents Anonymous, women -only 12 -step meeting, 6-lpm, St. Thomas Episcopal Church, 1465 Coburg Rd. FREE. NAN Connection Peer Support Group for individuals w/mental illness, bpm, NAMI Lane County Resource Center, 2411 MLKJr. Blvd. FREE.' HEALTH -lea Time Deadence: Bakingw/Almond Flwr,'Jaena Barren, noon-130pm, Natural Grocers, 201 Coburg Rd. FREE. qOS/FAMILIES Lapsh Stn- rydme, ages birth -3 w/adult, 1Dam, Springfield Library, 225 Sth St, Spfd. FREE. Preschool Storyume, ages 3-6, 10am, Springf eld Library, 225 5th St, Spfd. FREE. Family Board Game Night, Bpm, Castle ofGames, 660 Main, SpfdL FREE LECTURESICUSSES Medicare Made clear, 5-6pm, Oregon Insurace Lady Office,1163 Olive St, reg. at 222.9020. FREE. 'tillages and Empires" w/arche- ologist Stephen Oueppen, Spm, downtown Ibrary. FREE 'A Phomgmphic Memory. Seeing the Disappeared' w/Gusavo Germano, 7pm, Lillis Business Complex, U0. FREE. Creating Nurturing Environ - mems m Foster Healthy Child Development, 7pm, DRI, 1776 Millrace Or-, 4842123. FREE. City of Eugene and Eugene Urban Renewal Agency Budget Committee Meetings Notice The City of Eugene and Eugene Urban Renewal Agenry_Budget Committee is preparing to review the proposed budget for fiscal year 2015-20164FY16) and to provide its recommen- dations on the budget to the City Council. The Budget Committee wants your help in sed - ting e -ting funding priorities for our community. Please join the Budget Committee at its upcoming meetings to learn more and to speak about your priorities. Public Testimony and Deliberation on the FY16 Proposed Budget Tuesday, May 5, 2015 •5:30 pm Public Testimony, Deliberation and Action on the FY16 Proposed Budget Tuesday, May 12, 2015 • 5:30 pm All meetings will be held in the Bascom-TykesynRoom, Downtown Public -Library, 100 W 10th Avenue. .. .. - ..: .. How You Can Get Involved - - - Members of the public are encouraged to express their views on the FY16 proposed budget Public testimor ill betaken at 5:30 pm at the May 5 and May 12 Budget Committee meet- ings. Public testimony an'also be submitted by sending a written statement to the Budget Cohnn iftee or"'Oty-Council, c/o City of Eugene Finance Division, 100 W. 10th Ave. Ste. 400, Eugene, Oregon, 97401; submit a writtenstatement at the meeting or public hearing; or via the Budget'Cornmittee contact form at www.eugeneorgov/budget At the top -right of the webpage, dick the "Contact the Budget Committee" button- - How to Get More Information The FY16 proposed budget is available on the City of Eugene web site at www.eugene-cat gov/budgetstarting on Wednesday, April 22, 2015. Hard copies ofthe FY16 proposed budget are available for public review at the City of Eugene Finance Division (100 W 10th Avenue, Suite 400, Eugene, Oregon 97401), Downtown Public Library reference desk (100 W 10th Avenue, 2nd floor, Eugene, Oregon 97401), and at the City Managers Office (Lane County Public Service Building, 125 E 8th Avenue, Eugene, Oregon 97401), Wednesday, April 22, 2015. Budget Committee meeting materials and webcasts are available at www.eugene-or. go. /budget by selecting the "Get Involved" tab. Please contact the City of Eugene Finance Division at 541-682-5512 ifyou have any questions or need additional information. This notice was originally published on April 15 and this revision was published on May 1 on the City's website and may be viewed at http://www.eugene-or.gov/DocumentCenter/ View/19199 'What is College 1br2: A Defence of the Liberal Arts' w/Willlam- DeresiIrm.,7:30pm:Strau6 -- Hall U0 FREE. -- - ONTHEAfR'ThePoint' _ 9-9:30b.,KPUV8R9AM. _ 'That Atheist Show, weekly ral4 in, 7pm.Comcast 1V channel 29,790-6617. --. . OUTOOORS/RECREATtON Ob- sidians: Hike Amazon Hdwus/ Spencer Burne, 6.2 miles, reg a< " obudians.org, - -, Accessible Aquatics,swimming classes for individuals with disabilities, loam, Amazon Pool, 2600 Hilyard St. S7. Pool Hall continues- See Thurs- day, May 7 THURSDAY MAY 14 COMEDY Lady to Lady, three hilarious women, 930pm Docs Pad, 710 Willamette St S5. FILM Documentary The Woi Around US Al Jauera's cover- age of Op. Cast Lead in Gaza, 7pm, Growers Market, 454 WHII melte St. FREE GATHERINGS Eugene Metra Busi ss Networking Imarreconal, 11:30am, LCC Down own Center, 101 W. 10thAw. SR lunch Downtown Public Speakers Toastmasters pub -drop -ins welcome noon-S:DSpm, Les Lyle Conference Rm, Fourth Boor Wells Fargo Bldg., 99 E Broadway Ave, info at 48s- 1182. FREE Does Pad Drag Oueen Bingo continues. SeeThursday, May 7. Downtown Toastmasters mntin- ues.See Thursday,May7. c Eugene Metra Business Net- working International continues. See.Thursday, May 7. Nar-Amn Meetingcontfn m See Thursday; May 7.. - _ NI05/FAMILIESWoneeAut Ones Sterytime continues. Ser Thursday, May 7 Mountain View Academy Open House, 7 -Spm, 45 Moss St, - Lowell, 73S-1709. FREE. LECTURES/CUSSES Onean- One Job Hunting Help, 4-6pm, downtown library, reg at 682. S450.FREE- BBce Touring 101, bpm, OP Sam, 1225 E 18th Ave:, 346437L FREE. "Start/Grow an Arts & Crafts Business,' bpm, do_wmown - library. FREE LITERARYARTS Lunch w/author Judy Con, noon, The Book Nest, _1461 Mohawk Blvd., Spfd FREE ONTHEAIR'The Pointr 9-9:30am, KPOV 88.9FM. . -'Arts Journal" cument loa Comcast l arts, 9-10pm, Cost channel 29. OUMOORS/RECREATION - GEAR. Bike Club: Clearwater Tail and Springfield, 25 miles, Sam, Alton Baker Park FREE. Pool Hall for seniors continues. See Thursday, May 7 -SOCIAL DANCE Music & Dance Workshops wrailer de Son Ja- mcho, 7-9pm,American Legion - Hall 3448th St., Spfd. FREE. SPIRCTUAL &PI" rgihe Heal- ing Power Othe New Testament - continues. See Thursday, May 7 THEATERA Staampunk Sherlock Holmes continues. See Thurs. - day, May Z No Shame Workshop continues. " See Thursday, May 7. Trader Fork ltloozo continues. See Thursday, May 7. VOLUNTEER Care for Owen Rose Garden bringglaves & small hand -weeding tools, instruction provided, noon,3p n, end of K Jefferson 5t., 682-5025. CORVMS` AND SURROUNDING . AREAS -FIUDAY, MAY 8: Les Misefo T! 7:30Pro Friday & Satur-- - . day; 2:30pm Sunday, Majestic."' Theatre, 738-7469.820-S25: SATURDAY. MAY 9: Corvallis Fiermers-Market, gam -Spm, Firat SL. FREE.. THURSDAY, MAY 14: Dolly We Khcfien, 7:30prn today, through Saturday, Wimy- combe Hall Main Stage, OSU. s5 -S32. ATTENTIDN OPPORTUNITIES Auditions for Roving P.W. upcoming musical The Secrer c Gardenwill be held 2-4pm_ Saturday & Sunday, May 9-10, at Gaod Sam. Ctr, 3500 Hilyard. Seeking players 9 years and older for 28 to 30 roles. For info, all 686-2738 .,. or 343-2264. - U0 Outdoor Program: Field Geology Beach Walk. Sam. 4:30pm Saturday, May 9. For info, see outdoorprogram uoregon.edu/events. A portion of your purchase May 13-14 at Coburg Pizza benefits the animals of West ..Coast Dog and Cat Rescue. For firer, see westcoastdogandat. org. - Musicians needed for Dexter Lake Farmers Market. Call 937-3007. 'The City of Eugene Public Works Department has drafted an AMERICANS WITH Eugene DISABILITIES ACT RANSITION. PLAN to address, barriers to accessibility within the City rights-of-way. The proposed Plan is available for review at these locations •www.eugene-or.goy/ADAplan - .Human Rights and Neighborhood Involvement Office (99 West 10th Ave., Suite 116) •Downtown Library (100 West 10th Ave.) •cry Manager's Office (125 Fast 8th Ave., -2nd Floor) -Public Works Maintenance Office (1820 Roosevelt Blvd.)" Comments accepted through May 31stin these ways: -Email to ADAplan@ci.eugene.or.us -Comment form can be completed at the above locations. -Assistance filling out a comment form is aJailable at the Human Rights and Neighborhood Involvement.Office (99 West 10th Ave., Suite 116). -Call 541-682-5i77 - - - cvc rrxtr..o„ - Mir 1. aat5 igen Page 1 of 7 Like 8+1 T e t Share this Page: inShare InMotion News to Move You May 2015 A --- A J C �F Monthly Spotlight MAY IS BIKE MONTH - Click Below for Info Breakfast at the Bike Bridges - Coming soon to a bike bridge near you! Enjoy FREE coffee, bagels, cream cheese, bike bells, bike safety checks, bike registration, friends and fun! If you're biking or walking to work, school, or for fun, come join us! Breakfast at the bike bridges will be kicked off this year with the Business Commute Challenge on Tuesday May 12th at the DeFazio Bridge and our regular event All other events will I on the last Friday of month from May to October 7:OOAM-9:30AM. Do you enjoy Eugene Sunday Streets as mu as you enjoy Breakfa! at the Bike Bridges? l you still have your of ESS t -shirts? We want you to wear it and help us get a photo of every Sunday Streets shirt we've had! In This Issue: Mav is Bike Month Breakfast at the Bike Bridge 2015 Lane County Vehicle Registration Fee on Ballot in May Attend MovingAhead Workshops in Mav Sunday Streets Thanks You for Year 51 Road Repairs Need to Happen - Sitting in Traffic Doesn't Safe Routes to Schools VOLUNTEERS NEEDED for School Community Rides l Public Works Draft ADA Transition Plan Available for Review "Don't Be That Guy" Campaign EVENTS: 2015 Business Commute Challenge Cyclofemme Bike Ride http://www.icontact-archive.com/Tub_aPOQaQle9fGsNumBjrOH-FrTDGuP?w=2 6/22/2015 Don't get stuck in traffic this construction season. Go to KeepUshloving. Info to sign up for weekly updates about regional construction projects, detours and scheduled closures. Check out regional transportation options for the best way to get to your destination. KeepUsMoving. info is a partnership between the Lane Council of Governments, the cities of Eugene, Springfield, and Coburg, Lane County, ODOT, and Lane Transit District. We're working together to keep you moving Safe Routes to Schools VOLUNTEERS NEEDED for School Community Rides! Visit eugenespringfieldsrts.org or the Volunteer spot Contact Zane Wheeler for more info or to sign -tap: Zane.s.wheeler®c1.eugene.or.us or 541-682-6321 The program teaches 5th - 6th grade local middle school students how to ride their bikes safely among traffic. The class is a 10 day curriculum that culminates with 2 days of community rides around local neighborhoods. We need volunteers to ride with us during the community rides and help maintain a safe environment for a class on bikes. When: The below dates are scheduled for this spring. These dates may change based on class changes or weather. • Spencer Butte Middle - May 7 Et 8: 2:30-3:25 • Briggs Middle - May 7 Ft 8: 1:35-3:05 • Malabon Elementary - May 7 Et 8: 9:30-11:30 • Monroe Middle - May 21 Et 22: 10:00-11:48 £t 2:25-3:15 • Clear Lake Elementary - May 21 Et 22: 10:15-11:45 • Hamlin Middle - May 21 Et 22: 1:23-3:05 • Prairie Mt. School - June 5: 9:00-10:00, 11:15.12:15, 1:00-2:00 • Agnes Stewart - June 4 Et 5: 1:30-3:05 Like !fit r •• Public Works Draft ADA Transition Plan Available for Review The City of Eugene Public Works Department has conducted an evaluation of its public rights of way and drafted a transition plan that outlines how the organization will continue to comply with ADA regulations and provide, to the extent possible, safe access within the rights of way for all individuals. This plan will be a separate companion plan to the City's existing ADA Transition Plan. As part of this new transition plan, Public Works collected detailed data on over 15,000 sidewalk ramps and 250 pedestrian signals to develop transition schedules specific to these facilities. In addition to the inventory of ramps and pedestrian signals and schedules, the transition plan for the public rights of way also includes a system of barrier removal prioritization, information on how to request barrier removals from right-of-way facilities, and an appeals process. The draft plan is available for public comment through May 31. An electronic copy of the draft transition plan is available on the City website at www.eugene-or.eov/adaptan. Paper copies of the starting at Euphoria Chocolate at the corner of Bertelsen Rd. and Stewart Rd., ending at the Terry St. Railroad Bridge. Win fabulous prizes by getting your Wetland Passport stamped at each booth! Participating Organizations: City of Eugene, The Nature Conservancy, Bureau of Land Management, Lane County Parks, Long Tom Watershed Council, Lane Metro Youth Corps, Whole Earth Nature School, Oregon Department of Fish £t Wildlife, Northwest Youth Corps, GEARS, and Euphoria Chocolate. Prizes donated by: Cascades Raptor Center, Euphoria Chocolate, City of Eugene Recreation, Mt. Pisgah Arboretum, REI, Science Factory, City of Eugene Aquatics, Mountain Rose Herbs, and others. Mark your calendar for this FREE family -friendly event! Park at: • Euphoria Chocolate, 4090 Stewart Rd • WREN, 751 S. Danebo Ave • Data Logic, 959 Terry St. For more information, call 541-338-7047 or email info@wewettands.org Kidical Mass Family Bike Ride 3rd Saturday of Each Month: • May 16th Bike Friday is the largest local bike manufacturing facility in the state, they build bikes for our local bike safety education fleet and have recently started producing a great family bike called the Haul -a -Day . Come take a field trip to the facility and see how the bikes are built. Picnic Lunch! Bring some food and we'll add some too and provide some beverages too. Two departure locations including our first Bethel Page 5 of 7 http://www.icontact-archive.conVTub aPOQaQle9fGsNun-BjrOH-FrTDGuP?w=2 6/22/2015 draft transition plan for facilities in the public rights of way are also available at multiple locations: the Human Rights and Neighborhood Involvement Office (99 West 10th Ave, Suite 116), the Downtown Library (100 West 10th Avenue), the City Manager's Office (125 East 8th Avenue, 2nd Floor), and Public Works Maintenance Office (1820 Roosevelt Boulevard). For more information, contact Nancy Burns, ADA Transition Plan project manager, at 541-682-6887. That Guy." Using attention -grabbing images and humorous taglines, the campaign aims to convey some general "Don'ts" of riding the bus. Given the extremely diverse customers that we service, we felt that humor was the universal language that would convey these sometimes unpleasant messages. Every month the message will change to a different "courtesy," such as not eating on the bus and keeping your feet off the seats. We suspect that everyone will have their favorites as they rotate throughout the year. This month we are featuring the No Smoking rule to tag along with April's Earth Day, and last month was "Cover Your Cough," for the cold and flu season. We believe that these quirky ads will connect with our customers and remind them that Courtesy is Contagious. 2015 Business Commute Challenge! May 9-15 Join a friendly competition workplace against workplace - to see who can {, walk, bike, bus, carpool, or telework during the week of May 9-15. The workplace ith the most participation ins (based on size). Individual participants can win too! The more you participate this bigger the prize you have a chance to win. Visit commutechalllenge.ora to learn more, for a list of prizes and events, and to sign-up. The 2014 Business Commute Challenge is an event coordinated by Point2point at Lane Transit District. walk4bike 4bus 4 pooIaWINi School District Kidical Mass ride! Meet at Monroe City Park (10th Et Monroe) or WREN in the West Eugene Wetlands (751 S. Danebo Ave) at 10am (WREN ride will depart at 1 lam after check-in out the Walkin' Et Rollin' the Wetlands event) Basic Info: A family fun ride with trailers, trait -a -bikes, Xtracycles, tandems, oh my! We'll ride legal, safe, and hoot it up. Helmets are heavily encouraged (and legally required for the tikes under 16 years of age) www. kidicaImass. oro Camabell Bike Grou Departs rain or shine from Campbell Center (155 High St) for a relaxed in -town ride. Helmet required, weekly attendance is not. Rides are 10-20 miles, depending on who shows up. Call Campbell Center at 541- 682-5318 for more information. Wednesdays, 10:30am Oct -April, 9:30 am May -Sept. Walk n Talkers This self -led group walks 3-5 miles at a quick pace; there is usually a coffee stop along the way. The route varies and may have hills or rough pavement. The group walks rain or shine, year-round and departs at 9am sharp. Call Campbell Center at 541-682- 5318 for more information. Fridays, 9am. Cycling for Veterans Every Tuesday from 5:30pm-7:30pm. Meet at Maurie Jacobs Park, SE corner of parking lot off Fir Lane. More information, call Ree: 541-337-3710. Adaptive bikes available, call Paty: 541-682-5311. Open to all veterans including disabled veterans, friends and families of veterans. Improve your health and wellness lifestyle in a supportive environment. Page 6 of 7 http://www.icontact-archive.com/Tub_aPOQaQle9fGsNumBjTOH-FrTDGuP?w=2 6/22/2015 ukl� ? IN THIS EDITION �v • Compost Benefit Bethel Education MovinaAhead Workshops Throughout May • ADA Transition Plan Foundation Compost Sale! • Parks Update � • Playborhood! Saturday, May 9, 2015 • New Generations Film streets you use every day! Festival MovingAhead is your opportunity to identify MoVingAhead • Proposed Vehicle Fee • Vets Comn/New Home 1 Making Great Cities • The Dignity Project Moving.Ahead Workshops Throughout May Eugene and Springfield residents - now is the time to _.. help shape the future of the�� streets you use every day! _ a MovingAhead is your opportunity to identify MoVingAhead ( 'Too often we underestimate the improvements for people STREETS AND PLACES REIMA power of a touch, a smile, a kind word, a listening ear, an honest 1 who walk, bike and take transit on some of our region's most important streets. MovingAhead is hosting workshops in your neighborhood to gather input about how you think these streets should work in the future.Bring your family; supervised children's activities and snacks will be provided. Presentation and group activities will begin at 5:30 p.m. Highway 99 Corridor Monday, May 18 5-7:30 p.m. Willamette High School, 1801 Echo Hollow Rd., Eugene River Road Corridor Tuesday, May 19 5-7:30 p.m. North Eugene High School, 200 Silver Ln., Eugene 30th Avenue/Lane Community College Corridor Wednesday, May 27 5-7:30 p.m. Eugene Public Library, 100 W 10th Ave., Eugene Northeast Corridors (Coburg Road, MILK Jr. Blvd./Centennial Blvd., Valley River Center) Thursday, May 28 5-7:30 p.m. Monroe Middle School, 2800 Bailey Ln., Eugene Our community values transportation that is safe and convenient for everyone whether on foot, bike, a bus, or in a car. A safe and accessible transportation system supports great neighborhoods and helps keep us and our economy healthy. The City of Eugene and the Lane Transit District (LTD) - with the help of other regional partners - are launching MovingAhead to determine how to improve the main streets that connect our neighborhoods, shopping areas, and jobs. MovingAhead will prioritize transit, walking, and biking projects so they can be funded and built. It will focus on the key corridors identified in Envision Eugene, Springfield 2030, LTD's Long -Range Transit Plan, and the Regional Transportation_ Plan. Participate in our online workshop at MovingAhead.org from May 11 -June 5. For more information about MovingAhead, visit MovingAhead.or , view a fact sheet or sign up on the mailing list. to l�k 1 7k Public Works Draft ADA Transition Plan compliment, or the smallest act of caring, all of which have the potential to turn a life around." - Leo Buscaglia OTHER GREAT INFORMATION: • Mayor & Council Newsletter • City Council Tentative Working Agenda • Eugene Police Auditor Newsletters • Planning Commission • UO Community Contact Newsletter CALENDARS • Neighborhood Associations • Human Rights Commission • City Calendar of Events M.–I NEW SUMMER RECREATION GUIDE See Guide— Now Arailab to for Review The City of Eugene Public Works Department has conducted an evaluation of its public rights of way and drafted a transition plan that outlines how the organization will continue to comply with ADA regulations and provide, to the extent possible, safe access within the rights of way for all individuals. This plan will be a separate companion plan to the City's existing ADA Transition Plan. As part of this new transition plan, Public Works collected detailed data on over 15,000 sidewalk ramps and 250 pedestrian signals to develop transition schedules specific to these facilities. In addition to the inventory of ramps and pedestrian signals and schedules, the transition plan for the public rights of way also includes a system of barrier removal prioritization, information on how to request barrier removals from right-of-way facilities, and an appeals process. The draft plan is available for public comment through May 31. An electronic copy of the draft transition plan is available on the City website at www.eugene- or.gov/adaplan. Paper copies of the draft transition plan for facilities in the public rights of way are also available at multiple locations: the Human Rights and Neighborhood Involvement Office (99 West 10th Ave, Suite 116), the Downtown Library (100 West 10th Avenue), the City Manager's Office (125 East 8th Avenue, 2nd Floor), and Public Works Maintenance Office (1820 Roosevelt Boulevard). itapi kik 4TWK Welcoming Parks for our Latino Neighbors Rienrenidosl 'Bienvenidos' or 'welcome' is something we want Eugene's Latino community members to feel in Eugene parks. A local study done in 2012 identified that Eugene's Latino community members do not always feel welcome in Eugene parks. The Office of Human Rights Et Neighborhood Involvement (HRNI), in partnership with the University of Oregon Center for Latino/a and Latin American Studies (CLLAS), is working with staff in Parks and Recreation to do specialized outreach with the Latino community as part of the Parks Et Recreation System Plan. The Parks and Recreation System Plan will guide the development and operation of Eugene's parks, trails, recreation facilities and sports fields for the next 10 From: Pat Langan Sent: Monday, May 25, 2015 3:23 PM To: CEADAPIan Subject: ADA Transition Plan for Assessibility in Public Right -of Way I have just reviewed what Eugene propose for removing barriers in City's public Right -of -Way. One thing I don't see addressed is City installed SPEED BUMPS or SPEED HUMPS on unimproved streets that does not have curbs and gutter, shoulders and/or sidewalk. On these streets people in wheelchairs, on bikes, or walking have to use the street paving for access. With the SPEED BUMPS, they create barriers that are impassable and very dangerous while wheelchairs have to travel out in the middle of the street trying to,eross over the humps and dodge traffic. Most of the time a wheelchair need to back up,over the bumps placing their back to traffic. Not a good situation. Any plan needs to include removal or provisions for a way to go around them. Either installing sidewalks of turnouts or just plain removing the bump barriers altogether. Are there any public hearings or meetings so people can voice their concerns? If so when and where. If not, why not? Please give me an answer before your May 31st deadline for comments. You can reach me at this e-mail address or by calling me at . R. P. Langan. Appendix 9.4 Requestsfor Service and Grievance Criteria and Procedures and Forms City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way APPENDIX 9.4 Request for Service and Grievance Criteria and Procedures Decision Criteria The follow criteria will be used by Public Works staff and decision -makers in evaluating requests for service and grievances: • The Public Works ADA Transition Plan for Facilities within the Right of Way. • Engineering principles as described in the Public Improvements Design Standards Manual and the 2011 Notice of Proposed Rulemaking for ADA Guidelines for facilities within the Right of Way (until a final rule is adopted is adopted by FHWA/DOJ). • Existing local, state and federal laws regulating the use of public ways. • The efficient use of the public way by the public. For example, distance to nearest accessible crossing, how long has barrier been an issue for complainant. • The use of abutting property. • The intensity of the use of the street by vehicles and pedestrians. • The physical condition and characteristics of the street and abutting property. • Construction within or adjacent to the street. Investigation Criteria and Procedures 1. Initial Contact — A complaint may be filed in a variety of methods — in person, by telephone, mail and on- line. The complaint will be recorded in MMS and an acknowledgement of receipt will be sent to the complainant that describes the next steps to processing the complaint. 2. The complaint shall be investigated unless: • The complaint is withdrawn. • There has not been a Request for Service (RFS) made. • The complainant fails to provide required information after numerous requests. • The complaint is not timely filed. • Any issues that do not involve ADA barriers within the right of way will be directed to the appropriate entity. Under no circumstances is the complainant discouraged from filing a complaint. • Barrier is not within City's jurisdiction. (private property, ODOT, Lane County) 3. The authorized staff representative (per Transition Plan process or by delegation) will contact the complainant in order to acknowledge receipt of the complaint, introduce self and provide personal contact information, review the complaint, explain the grievance process and schedule an interview. 4. The "investigator' shall prepare a written record of the investigation which includes: • The name of the complainant, contact information and additional preferences for communication (in addition to the required written response). • Basis of complaint — i.e., Complainant's description of the barrier in the right way. • Remedy sought by the complainant. • Information needed in order to address the issue — include sources for information and key staff. • Estimated investigation timeline. Conducting the investigation: • The investigation will address only those issues relevant to barriers within the right of way. • While the information is subject to public information laws, confidentiality will be maintained as much as possible. Oftentimes people may self -disclose personal information that does not need to be documented, a common example would be medical information. MMS will be used to document a chronological record of the contacts made throughout the investigation — be sure to enter information into MMS. Initial Contact — Request for Service Actions: Timelines: Create Request for Service (RFS) in MMS using one of the Investigation and response to the request applicable codes. within 30 calendar days from date of Staff assigned to the selected MMS code reviews the Acknowledge receipt (if requested) of the request and acknowledges its receipt. request for service within 5 business days. (Document acknowledgement in the MMS record.) Track phone calls through the action log notes. • The grievance must be filed within 180 days of the (E-mail, voice mail or on-line requests only) If the incorrect MMS code was used, forward and revise the code or work group to appropriate team. Follow-up on the revision to ensure acknowledgement timeline is met. Response — Request for Service Actions: Timelines: Create WO then investigate the request for service and Investigation and response to the request respond with information within 30 calendar days from date of submitting a grievance. Should be able to find the acknowledgement. Close WO in MMS Once issue has been solved or addressed Initial Contact - Grievance Actions: Timelines: Record grievance in MMS. Written decision within 15 business days of • Note a request for service must be filed prior to interview (or date interview is declined). submitting a grievance. Should be able to find the previously submitted request in MMS and make Extensions in 15 business day increments are the grievance a "child" of the original request. allowed upon notification. • The grievance must be filed within 180 days of the request for service response. If not filed within this timeline, it should be re-entered as a request for service (not a grievance). Staff assigned to the selected MMS code, review the Acknowledge receipt of the grievance within 5 grievance and acknowledge its receipt. Create a WO business days. (Document acknowledgement in the MMS record.) Public Works Section (Team) Manager initiates contact and Contact and interview complainant within 15 interviews complainant. Complainant may decline the business days from acknowledgment. interview. (Document contact and interview in MMS record) Investigation and Response — Grievance (Section or Team Manager) Actions: Timelines: Complete any additional investigation and prepare a Written decision within 15 business days of written decision in the format requested by the interview (or date interview is declined). complainant. If additional time is needed to investigate or respond to the Extensions in 15 business day increments are complaint, notify the complainant. allowed upon notification. Appeal — Grievance (Public Works Director or Division Manager designee) Actions: Timelines: Public Works Director will meet with the complainant, unless declined by the complainant. Meeting within 15 calendar days of the date of appeal. Complete any additional investigation and prepare a Written decision within 15 calendar days of written decision in the format requested by the meeting (or date meeting is declined). complainant. Key: MMS = Maintenance Management System; WO = Work Order S, M - City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Appendix 9.6 Summary of State/Local Plans and Documents State Oregon Transportation Plan (OTP) - 2006 Most recently updated and adopted by the Oregon Transportation Commission in 2006, the OTP is a 25 -year transportation plan with a comprehensive assessment of state, regional, and local (private and public) transportation facilities and services including airports, bicycle and pedestrian facilities, highways and roadways, pipelines, port and waterway facilities, public transportation, and railroads. Oregon Bicycle and Pedestrian Plan (OBPP) -1995 Adopted by the Oregon Transportation Commission in 1995 and included as an element of the OTP, the OBPP provides general principles and policies used by ODOT to provide bike and pedestrian routes along state highways and serves as guidance to cities and counties in the development of such local routes. Oregon Bicycle and Pedestrian Design Guide — 2011 Adopted as part of the OBPP and most recently updated in 2011 and included as Appendix L of the current Oregon Highway Design Manual (see below), these recommended design standards are used by the ODOT for state highway projects and are intended to meet or exceed national standards including the current ADA accessibility guidelines. Oregon Department of Transportation (ODOT) ADA Section 504 Transition Plan — 2011 Initially issued in 1992, ODOT updated its Transition Plan in 2004 and most recently in 2011. In the current Transition Plan, the ODOT's Highway Division includes a curb ramp inventory and schedule. The plan also cites funding sources for sidewalks, curb ramps and other ADA -related facilities and states that any ODOT-administered grant programs or any projects administered by the ODOT Local Government program for projects that include these kinds of improvements must comply with the current ADA guidelines, as required. In addition, private property development along state highways is required to construct sidewalks and curb ramps, where applicable. Oregon Highway Design Manual - 2012 This manual provides uniform standards and procedures for the ODOT, including those related to achieving ADA compliancy, and is used for all projects that are located on the state highways. city TransPlan - The Eugene -Springfield Transportation System Plan (TSP) - 2002 Originally adopted in 1986 and most recently updated in 2002, TransPlan is considered the Transportation Functional Plan (TFP) of the Metro Plan for the cities of Eugene and Springfield and Lane County and is adopted as the federally required Regional Transportation Plan (RTP). The first objective of TransPlan is to "...Provide adequate levels of accessibility and mobility for the efficient movement of people, goods and services within the region." 9.9650 TransPlan Policy (4) outlines the desire "...to improve transit service and facilities to increase the system's accessibility, attractiveness, and convenience for all users, including the transportation disadvantaged population." Eugene Pedestrian & Bicycle Strategic Plan (BPSP) (TSP Strategy 4.2, Action 4.2.3) - 2008 The BPSP, created in 2008 as a 5 -year plan, is intended to guide City planners and involve the community in the effort to make the city more "walkable and bikeable". It supports many community goals including one of equity to provide the same mobility opportunities to all citizens, including persons with disabilities, that they may experience the same "mobility opportunities" as those who drive vehicles. Eugene Pedestrian and Bicycle & Pedestrian Master Plan (BPMP) — 2012 The BPMP, created in 2012 to serve as the pedestrian and bicycle elements of the TSP, has three primary objectives to 1) expand and improve the pedestrian and bicycle networks; 2) address safety and equity of all users including persons with disabilities; and 3) provide pedestrian- and bicycle- related support facilities that encourage walking and bicycling. An update to the City's ADA Transition Plan (see below) is a recommendation of the BPMP. Central Area Transportation Study (CATS) — 2006 Completed in 1987 and most recently updated in 2006, CATS is considered a refinement of the TSP for the greater downtown and University of Oregon areas. The document promotes the development of a transportation system that provides for the safe and efficient movement of motor vehicles, pedestrians, bicycles, and transit vehicles. City of Eugene ADA Transition Plan — Phase 7, 2008 See description in section 1.2 above. Housing and Urban Development (HUD) Consolidated Plan A five-year planning document developed in collaboration with the city of Springfield to meet HUD requirements to establish priorities and progress measurements for address housing, homeless, community, and economic development needs and resources. Removal of barriers to accessibility is a HUD -approved component of the Consolidated Plan and therefore eligible for Community Development Block Grant (CDBG) funding (see section 5.3). Lane Transit District (LTD) Lane Coordinated Public Transit Human Services Transportation Plan (Lane Coordinated Plan) This plan was adopted by the Lane Transit Board of Directors in 2007 and most recently updated in 2009 to include elements as required by the Federal Transit Administration to ensure compliance with federal and state requirements and guidelines. The LTD EZ Access Program serves older adults and persons with disabilities with transportation that best suits their needs. The LTD ADA -compliant paratransit service RideSource is a complimentary service that provides the larger communities of Eugene and Springfield with individual prescheduled trips for persons with disability unable to use the fixed route service and has been provided since 1993. !IIIIF 11 i 1 1 1 111 1`111 111111111il I I i RM Mi City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Appendix 9.7 Definitions and Acronyms (not comprehensive) Selected ADA Definitions as published by Access Board Accessible: Describes a facility in the public right-of-way that complies with ADA guidelines. Alteration: A change to a facility in the public right-of-way that affects or could affect pedestrian access, circulation, or use. Blended Transition: A raised pedestrian street crossing, depressed corner, or similar connection between the pedestrian access route at the level of the sidewalk and the level of the pedestrian street crossing that has a great of 5 percent or less. Curb Ramp: A ramp that cuts through or is built up to the curb. Curb ramps can be perpendicular or parallel, or a combination of parallel and perpendicular ramps. Element: An architectural or mechanical component of a building, facility, space, site, or public right-of-way. Facility: All or any portion of building, structures, improvements, elements, and pedestrian or vehicular routes located in the public right-of-way. Pedestrian Access Route: A continuous and unobstructed path of travel provided for pedestrians with disabilities within or coinciding with a pedestrian circulation path. Pedestrian Circulation Path: A prepared exterior or interior surface provided for pedestrian travel in the public right-of-way. Public Right -of --Way: Public land or property, usually in interconnected corridors, that is acquired for or dedicated to transportation purposes. 929310MMMM101 Excerpt, Adopted 6 -year Capital Improvement Program (CIP) for Curb Ramps and APS City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way Transportation Overview The majority of projects in the Transportation section are derived from the Eugene Transportation System Plan adopted in 2013, and the 2035 Regional Transportation Plan, updated in 2011. Other plans and policies include: • Master Traffic Communications Plan; • Community Climate and Energy Action Plan; • Americans with Disabilities Transition Plan; • Pavement Management Program; • Pedestrian and Bicycle Master Plan; • Arterial -Collector Street Plan; • Neighborhood and local area refinement plans; and • Envision Eugene recommendations. Transportation capital projects fall into the following five categories: 1. Functional and Safety Improvements - This category includes proposed transportation improvements involving: • Neighborhood transportation livability projects; • ADA projects, such as accessible pedestrian signals and sidewalk access ramps; • Shared use paths rehabilitation; • Pedestrian crossing treatments; and • Traffic signals, streetlights, and intersection improvements. New Capital Facilities - This category includes new streets built by the City or by private developers and new shared -use paths. Funds for this category come from the System Development Capital Projects Fund (SDC's), Special Assessment Capital Projects Fund, and in some cases grants from other agencies (State, Federal, and County). 3. Preservation - These projects preserve the investment of existing improved transportation facilities where routine preventative maintenance activities are no longer cost-effective. These projects typically include overlays, slurry seals, and, in some cases, reconstruction of existing streets. These projects are funded through the local motor vehicle fuel tax, Transportation System Development Charge reimbursement fee, Federal Funds and General Obligation bonds. 4. Upgrades to City Standards - Projects that improve the existing substandard facilities to City Standards. Typically these are street improvements which include improving the road structure, curbs and gutters, sidewalks, and underground utilities on an as needed basis. The primary funds used for these projects are assessments, System Development Charges (SDC's), and the Transportation Capital Fund. Two upgrades to City Standards projects are included in the FY16-21 Capital Improvement Program: Bethel Drive, Hwy. 99 to Roosevelt, and County Farm Road. City of Eugene 2016 - 2021 Capital Improvement Program Page 164 S. Capacity Enhancement -Projects in this category typically involve increasing the number of vehicles or bikes that can travel through the system. Funding for these projects generally comes from a combination of assessments, System Development Charges (SDC's), and the Transportation Capital Fund. Transportation projects provide opportunities to respond to adopted Growth Management Policies #11 (enhancing alternative modes of transportation), #13 (relieving severe congestion), and #15 (supporting desirable forms of development). Funding FY14 was the last year of funding from the 2008 Ballot Measure 20-145, which authorized the issuance of $35.9 million in general obligation bonds for the purpose of funding major street preservation projects and off street shared use paths. On November 6, 2012, Eugene voters approved a new bond measure to fix streets. The bond measure authorized the issuance of $43 million in general obligation bonds for the purpose of funding major street preservation projects, along with an annual average of $516,000 to be spent on bicycle and pedestrian projects. System Development Charge (SDC) projects are being funded at the current level of development within the City of Eugene. The Transportation SDC reimbursement component will provide $300,000 annually. The Pavement Preservation Fund is derived from the five cent local motor vehicle fuel tax and can be used to preserve the transportation system, but not increase capacity or upgrade the streets. The motor vehicle fuel tax is projected to provide about $2.85 million annually. It is projected that with total annual pavement preservation funding resources of $18 million, the City could fully fund and stabilize the annual overlay program and begin to make considerable progress on the backlog of needed reconstruction projects. City of Eugene 2016 - 2021 Capital Improvement Program Page 165 Transportation Funding Sources FY16-21 CIP Totals $62.5 Million in Funded Projects Transportation SDC, Wastewater Utility - I $5,392,000 Capital, $600,000 I Stormwater Utility - I Capital, $3,000,000 i Pavement I Preservation 2012 { Capital, $17,100,000 Transportation Bond, $32,000,000 General Capital i Projects, $180,000 Federal Funds, $4,240,000 City of Eugene 2016 - 2021 Capital Improvement Program Page 165 9 y 0 0 0 O It) VI 0 0 0 0 N to t� N O QM iptl W Ipt1 O O Lp^1 N 0 0 0 0 O O O O p O M O VI W Y1 N p 0 �y M M � 0 0 0 0 0 0 0 0 0 p H ,co„� O M O �+1 W D` 4• of O N N O N� W M W � c 'N H N � N p M 0 to W l�Ri � H pM 0 to W e O+ Q` d' d' ti M C N N a' D\ M m N N N � v d v SEuu L d d a N d d �`• y 0! d � a U VI VI to Vf � C C C O C G C G C C •C r+ G C C G C G C C Vi fi G. LL ' [i L•. LL Li [z IL O .o c O C R E F m c ,o 0 � of a _ ++ R R C O C o N R R C = F FRJ ; C o 0 C E >IM c a m A n o A <zcn iL R c O F- O m c - o T F o c v N G a C v City of Eugene 2016 - 2021 Capital Improvement Program Page 166 'ransportation Funding Secured .unctional and Safety Improvements Neighborhood Transportation Livability Project Description: This program is an expansion of the traffic calming program to address multiple transportation issues that affect neighborhood livablity on local streets. Neighborhood transportation projects on local streets including traffic calming projects: speed humps, diverters, chokers, circles, street lights; bike and pedestrian improvements; transit facilities; and other street enhancements. Program addresses neighborhood livability issues which are prioritized with the assistance of neighborhood organizations. This project meets priority measure 1 of TransPlan Financial Policy #6 to preserve the functionality of the existing transportation system by providing improvements that increase safety for alternative modes, and safer traffic operations. Project Status: In Progress This is an ongoing project included in previous CIPS. Funds are budgeted under this program and are later transferred to specific projects as they are identified and developed. Funded at $30,000 per year in the FY12, FY13, FY14 and FY15 capital budgets. Specific Plans/Policies Related to this Project: Council Specific Direction Capital Costs ($ in thousands) and 2016 2017 2018 2019 2020 2021 Total eneral Capital Projects $30 $30 $30 $30 $30 $30 $180 'otal $30 $30 $30 $30 $30 $30 $180 Neighborhood: Citywide Ward: Citywide Traffic calming speed hump City of Eugene 2016 - 2021 Capital Improvement Program Page 167 Transportation Funding Identified Functional and Safety Improvements Traffic Operations Improvement Program Project Description: Safety and transportation system management improvements, including adding turn lanes and bicycle lanes, pedestrian crossings, median islands, safety devices, and other restriping and channelization modifications. This project meets priority measure 1 of TransPlan Financial Policy #6 to preserve the functionality of the existing transportation system by providing safety improvements for alternative modes and by improving traffic operations. Project Status: /n Progress This is an ongoing project included in previous CIPs. Funds are budgeted under this program and are later transferred to specific capital projects as they are identified and developed. Funded at $75,000 in FY12, and $100,000 in FY13 and FY14 capital budgets, and $50,000 in FY15 capital budget. Specific Plans/Policies Related to this Project: City of Eugene Transportation System Plan (formerly Transplan) Capital Costs ($ in thousands) d 2016 2017 2018 2019 2020 2021 Total isportation SDC $100 $100 $100 $100 $100 $100 $600 al $100 $100 $100 $100 $100 $100 $600 Neighborhood: Citywide Ward: Citywide Pedestrian Island City of Eugene 2016 - 2021 Capital Improvement Program Page 168 Transportation Funding Identified Functional and Safety Improvements Traffic Signal Improvements and Upgrades Project Description: Install new traffic signals and upgrade existing traffic signal system to improve efficiency, reduce delay, improve air quality, and facilitate multi -modal traffic flow. Project locations are based on a priority rating system that considers traffic volumes, delays, accidents, standard signal warrants and other traffic and development -dependent factors. This project meets priority measure 1 of TransPlan Financial Policy #6 to preserve the functionality of the existing transportation system by providing safety improvements for alternative modes and by improving traffic operations. Project Status: /n Progress This is an ongoing project included in previous CIPS. Funds are budgeted under this program and are later transferred to specific projects as they are identified and developed. Project was funded at $112,000 in FY12, $150,000 in FY13, FY14 and FY15. A portion of the funding for this project is not yet identified. Specific Plans/Policies Related to this Project: City of Eugene Transportation System Plan (formerly Transplan) Master Traffic Communications Plan Traffic Signal List Capital Costs ($ in thousands) d 2016 2017 2018 2019 2020 2021 Total isportation SDC $150 $150 $150 $150 $150 $150 $900 al $150 $150 $150 $150 $150 $150 $900 Neighborhood: Citywide Ward: Citywide L ok Traffic signal City of Eugene 2016 - 2021 Capital Improvement Program Page 169 Transportation Funding Secured New Capital Facilities Shared Use Path Jessen Path from Beltline Road to Terry Street Project Description: Construct a shared use path in west Eugene connecting the Beltline Road path to Terry Street. The proposed path is approximately 5,900' long, and includes a 12' wide wearing surface with 2' wide shoulders and pedestrian scale lighting. Also construct connector paths at Devos, E Irwin, and W Irwin Streets. This project will provide a valuable east -west shared use path in west Eugene, connecting the Beltline Path, a 146 -acre natural area, neighborhoods and Terry Street which connects to schools and the Fern Ridge Path. This project meets priority measure 4 of TransPlan Financial Policy #6. This project provides an east -west off-street path in west Eugene where there are few such facilities and is included in the Six -Year CIP because it includes funding sources - transportation SDCs and federal Transportation Alternatives funds - that are not available for projects that meet the first priority measure of "Protect the existing system'. Project Status: Not Started This project was previously included in FY12-17 and FY14-19 CIP. An application for a federal transportation enhancement grant has been submitted. Funding for preservation & maintenance costs associated with this project has not yet been identified. Specific Plans/Policies Related to this Project: City of Eugene Transportation System Plan (formerly Transplan) Eugene Pedestrian and Bicycle Master Plan Capital Costs ($ in thousands) Fund 2016 2017 2018 2019 2020 2021 Total Federal Funds $180 $0 $1,720 $0 $0 $0 $1,900 Transportation SDC $19 $0 $176 $0 $0 $0 $195 Total $199 $0 $1,896 $0 $0 $0 $2,095 Preserve Maintain $0 $0 $0 $7 $7 $7 Neighborhood: Bethel Ward: Ward 6 Shared Use Path/Jessen Path from Beltline Road to Terry Street City of Eugene 2016 - 2021 Capital Improvement Program Page 170 Transportation Funding Secured Preservation and Maintenance Pavement Preservation Program Project Description: Preserve existing improved streets City-wide, through overlays and surface treatments. This program also includes reconstruction projects for roadways deteriorated to a point where investment in capital preservation and preventative maintenance are not cost-effective. Project Status: In Progress This is an ongoing project that has been included in CIP for a number of years. Funded at $2.7 million in FY10, $3.6 million in FY11, $3.6 million in FY12, $3.4 million in FY13, $3.7 million in FY14, and $3.3 million in FY15. Other parts of the Pavement Preservation Program are the projects funded through the 2012 Street Bonds and unfunded project backlog. Specific Plans/Policies Related to this Project: Pavement Management Program Capital Costs ($ in thousands) Fund 2016 2017 2018 2019 2020 2021 Total Wastewater Utility - Capital $100 $100 $100 $100 $100 $100 $600 Transportation SDC $300 $300 $300 $300 $300 $300 $1,800 Stormwater Utility - Capital $500 $500 $500 $500 $500 $500 $3,000 Pavement Preservation Capital $2,850 $2,850 $2,850 $2,850 $2,850 $2,850 $17,100 Total $3,750 $3,750 $3,750 $3,750 $3,750 $3,750 $22,500 Neighborhood: Citywide Ward: Citywide Pavement Preservation Program in action. City of Eugene 2016 - 2021 Capital Improvement Program Page 171 Transportation Funding Secured Preservation and Maintenance Pavement Preservation Program - Transportation Bonds Project Description: The 2015 Pavement Management Report listed the City's backlog of needed pavement preservation projects at over $848 million. In May 2007, the Council Subcommittee on Transportation Funding Solutions recommended a total yearly pavement preservation funding target of $18 million. Staff estimates that current funding sources for pavement preservation (i.e., $0.05local motor vehicle fuel tax and Transportation SDCs reimbursement component) will generate about $3.2 million in annual revenue for FY16-21. The voters approved a five-year general obligation bond in November 2008 to address a portion of the funding gap. The bond listed 32 specific projects to be completed and at least $350,000 each year for off-street shared -use path projects. In November 2012, the voters approved a $43 million five-year general obligation bond, which replaced the 2008 bond upon its expiration. The 2012 bond funds 76 specific projects, with $516,000 annually allocated towards bicycle and pedestrian projects. Project Status: In Progress This project was included in FY10-15, FY12-17 and FY14-19 CIP. Funded at $9.14 million in FY12, $7.48 million in FY13, $5.41 million in FY14 and $8 million in FY15. Specific Plans/Policies Related to this Project: City of Eugene Transportation System Plan (formerly Transplan) Pavement Management Program Capital Costs ($ in thousands) Fund 2016 2017 2018 2019 2020 2021 Total 2012 Transportation Bond $8,290 $8,590 $8,900 $6,220 $0 $0 $32,000 Total $8,290 $8,590 $8,900 $6,220 $0 $0 $32,000 Neighborhood: Citywide Ward: Citywide Capital pavement overlay in progress. City of Eugene 2016 - 2021 Capital Improvement Program Page 172 Transportation Funding Secured Upgrades and Capacity Enhancement Amazon Active Transportation Corridor Project Description: This project is to implement walking, running, and bicycling improvements to East/West Amazon Drives and to extend Amazon Path south to Tugman Park. Widen the sidewalk from E 33rd Avenue to the south end of Tugman Park. Install three prefabricated 10' wide steel pedestrian bridges (45' long) over Amazon Creek to increase mobility and transit access. Develop a two-way separated bicycle facility on East or West Amazon Drive from Hilyard Street to Snell Street. Improve the intersection at either 33rd Avenue or 34th Avenue for access to the Amazon Path, to the Rexius Trail and two-way separated bicycle facility. Repair and replace the Rexius Running Trail (approximately from Hilyard Street to Snell Street). This project meets priority measure 2 of TransPlan Financial Policy #6. This project improves the efficiency and capacity of existing pedestrian and bicycle facilities and is included in the CIP because it includes funding sources - transportation SDCs and federal Transportation Alternatives funds - that are not available for projects that meet the first priority measure of "Protect the existing system". Project Status: Not Started This project was included in the FY14-19 CIP. Public Works Department will be applying for funding as part of the 2015-2018 Oregon Statewide Transportation Improvement Program (STIP). Specific Plans/Policies Related to this Project: City of Eugene Transportation System Plan (formerly Transplan) Eugene Pedestrian and Bicycle Master Plan Capital Costs ($ in thousands) Fund 2016 2017 2018 2019 2020 2021 Total Federal Funds $224 $27 $1,290 $0 $0 $0 $1,541 Transportation SDC $23 $3 $133 $0 $0 $0 $159 Total $247 $30 $1,423 $0 $0 $0 $1,700 Neighborhood: Southeast Ward: Ward 2 Amazon Active Transportation Corridor City of Eugene 2016 - 2021 Capital Improvement Program Page 173 Transportation Funding Secured Upgrades and Capacity Enhancement Northeast Livable Streets Project Description: Formalize the bicycle boulevard network in three neighborhoods (Cal Young, Northeast, Harlow). Projects include wayfinding signs, shared lane markings, traffic calming, diversion, and enhanced pedestrian crossings. This project meets priority measure 2 of TransPlan Financial Policy #6. This project improves the efficiency and capacity of existing bicycle facilities and is included in the CIP because it includes funding sources - transportation SDCs and federal Transportation Alternatives funds - that are not available for projects that meet the first priority measure of `Protect the existing system". Project Status: Not Started This project was included in the FY14-19 CIP. Public Works Department is applying for funding through combined Transportation Enhancements and Oregon Bike & Pedestrian grant programs. Specific Plans/Policies Related to this Project: City of Eugene Transportation System Plan (formerly Transplan) Eugene Pedestrian and Bicycle Master Plan Capital COStS ($ in thousands) Fund Federal Funds Transportation SDC 2016 2017 2018 2019 2020 2021 Total $104 $54 $641 $0 $0 $0 $799 $11 $6 $66 $0 $0 $0 $83 Total $115 $60 $707 $0 $0 $0 $882 Neighborhood: Multiple Neighborhoods Ward: Multiple Wards Northeast Livable Street City of Eugene 2016 - 2021 Capital Improvement Program Page 174 JOE��- Y �Q L cwU Y s •iP a e Ra .,. wmsnati v — a ~Co` n �..� Northeast Livable Street City of Eugene 2016 - 2021 Capital Improvement Program Page 174 transportation Funding Identified Jpgrades and Capacity Enhancement Services for New Development/Grant Matching Funds Transportation Project Description: Unspecified petitioned infrastructure improvements to support new development and response to infrastructure needs in developing areas (typically transportation improvement projects that may include wastewater and stormwater system components). Also, the local funding match for bicycle and pedestrian improvements funded through state and federal grant projects. This funding will be used for projects to improve unimproved collector streets to City standards and meets priority 2 of TransPlan Financial Policy #6 by improving the safety, efficiency and capacity of existing transportation facilities, and by providing better access for alternative modes. Also projects using this funding will include funding sources - assessments to benefiting properties and transportation SDC's- that are not available for projects that meet the first priority measure of "Protect the existing system". Finally, these funds may be used to provide the local match for state and federal grant funds. Project Status: /n Progress This is an ongoing program that is being expanded to include local match funds for grant opportunities. Funds are budgeted under this program and are later transferred to specific capital projects as they are identified and developed. Funded at $150,000 in FY14, $450,000 in FY15. Specific Plans/Policies Related to this Project: SDC City Code and Methodologies Capital Costs ($ in thousands) ,und 2016 2017 2018 2019 2020 2021 Total ransportation SDC $39 $391 $25 $400 $400 $400 $1,655 notal $39 $391 $25 $400 $400 $400 $1,655 Neighborhood: Citywide Ward: Citywide Shared -use path under construction City of Eugene 2016 - 2021 Capital Improvement Program Page 175 UJI, 400��� Administrative Order to Adopt City of Eugene Transition Plan for Accessibility in the Public Rights -of -Way