AGENDA ITEM SUMMARY
Work Session: Context-Sensitive Design and Funding of Crest Drive Neighborhood
Street Improvements
Meeting Date: January 24, 2005 Agenda Item Number: B
Department: Public Works Staff Contact: Mark Schoening
www. cl. eugene, or. us Contact Telephone Number: 682-5243
ISSUE STATEMENT
This is an opportunity for the council to review and discuss the principles of context-sensitive design
(Attachment A) and options for moving forward with the design of street improvements for Crest Drive,
Storey Boulevard and Friendly Street in the Crest Drive Neighborhood in advance of assigning a
functional classification to any streets in the neighborhood.
BACKGROUND
In November 1999, the council adopted by Ordinance No. 20181, the "Street Classification Map, Figure
60" that depicts the classification of major streets within the Eugene Urban Growth Boundary,
consistent with TransPlan and the Metropolitan Plan. The 1999 Street Classification Map did not
classify the streets in the Crest Drive neighborhood. At that time, staff was directed to conduct a
separate transportation study to determine the appropriate classifications and street design standards for
the neighborhood. The Crest Drive Area Transportation Study was completed in September 2003.
In February 2004, the Planning Commission recommended the classification of certain segments of
Crest Drive, Storey Boulevard, Friendly Street and McLean Boulevard as neighborhood collectors and
the use of context-sensitive design processes in any future street improvement projects.
At a council work session on April 28, 2004, the council directed staff to perform additional and more
inclusive public involvement with the neighborhood to inform interested parties of our efforts and
provide opportunity for input on street classification in this area. An extensive public outreach effort
occurred over the summer of 2004.
The City Council held a work session on October 25, 2004, to review the recommendations of the
Planning Commission on the classification of streets in the Crest Drive neighborhood and to receive a
staff report on the public outreach efforts since April 2004. Although the council did not take any
action, it was clear that a majority of the council was not supportive of the Planning Commission
recommendation to classify segments of Friendly, Storey, Crest and McLean as neighborhood
collectors.
The City Council held a public hearing on October 25, 2004, on the classification of streets in the Crest
Drive neighborhood. Over 30 people provided testimony at the public hearing and nearly all were
L:\CMO\2005 Council Agendas\M050124\S050124B.doc
opposed to the classification of any streets in the Crest Drive neighborhood as neighborhood collectors.
Many of those opposed to the classification expressed concern about the design options available for
neighborhood collectors that would protect the character of their neighborhoods roadways. The council
did not take any action at the public hearing. After the public hearing it appeared that the majority of the
council favored addressing the issue of street design in advance of classification.
RELATED CITY POLICIES
The Street Classification Map in the Eugene Arterial and Collector Street Plan (ACSP) is intended to
clarify and implement policies set forth in the regional transportation system plan (TransPlan), the
Growth Management Study, and other adopted plans. The 1991 Federal Intermodal Surface
Transportation Act (ISTEA) and Oregon's Transportation Planning Rule require the State and each
county and municipality to functionally classify their public roads and streets.
When unimproved streets are brought up to City standards, it has been the policy and practice of the
City to assess the abutting and benefiting property owners for a portion of the cost of the improvements.
Over the course of several years, a Council Ad Hoc Committee on Street Improvement Funding
reviewed the assessment policies for all functional street classifications. The goal of the subcommittee
was to more equitably and fairly allocate the cost of street improvements to the benefiting properties.
Based upon the work of the subcommittee, in October 2000 the council adopted an ordinance that
substantially changed the assessment methods for arterial and collector streets. A year later in
November 2001, the council adopted an ordinance that substantially changed the assessment methods
for local streets.
COUNCIL OPTIONS
The options for funding the preliminary design of street improvements for portions of Crest Drive,
Storey Boulevard and Friendly Street using the principles of context-sensitive design include:
1. Direct the City Manager to prepare a resolution to form a local improvement district for the
design and construction of street improvements using the principles of context-sensitive design
for those sections of Crest Drive, Storey Boulevard, and Friendly Street shown on Attachment B.
2. Appropriate $240,000 in General Fund in the FY06 Annual Budget for the preliminary design of
street improvements using the principles of context-sensitive design for those sections of Crest
Drive, Storey Boulevard, and Friendly Street shown on Attachment B
3. Request that the County Board of Commissioners program funds for the improvement of those
sections of Crest Drive, Storey Boulevard, and Friendly Street shown on Attachment B in the
Lane County FY06-FY10 Capital Improvement Program.
CITY MANAGER'S RECOMMENDATION
The City Manager recommends that the council direct the City Manager to prepare a resolution to
initiate a local improvement district for the design and construction of street improvements using the
principles of context-sensitive design for those sections of Crest Drive, Storey Boulevard, and Friendly
Street shown on Attachment B. The resolution would also stipulate that upon completion of the
L:\CMO\2005 Council Agendas\M050124\S050124B.doc
preliminary design of the street improvements, the City Manager will return to the council at a work
session to discuss the issue of street classification. In the event that the project does not move forward
after the completion of the preliminary design, then a funding source would have to be identified to
reimburse the Assessment Fund for the estimated $240,000 in preliminary engineering costs.
SUGGESTED MOTION
Move to direct the City Manager to prepare a resolution to initiate a local improvement district for the
design and construction of street improvements using the principles of context-sensitive design for those
sections of Crest Drive, Storey Boulevard, and Friendly Street shown on Attachment B.
ATTACHMENTS
A. Context-Sensitive Design Process
B. Map of the Crest Drive Neighborhood
FOR MORE INFORMATION
Staff Contact: Mark Schoening
Telephone: 682-5243
Staff E-Mail: mark. a. schoening~ci, eugene, or. us
L:\CMO\2005 Council Agendas\M050124\S050124B.doc
ATTACHMENT A
Context Sensitive Design Process Conventional roadway design standards
define features such as minimum lane
Context Sensitive Design (CSD) is an widths, minimum degrees of horizontal
emerging roadway design technique that and vertical curvature, design speed, and
is flexible and sensitive to community design vehicle. They often reflect the
values. CSD is a collaborative, assumption that wider, straighter and
interdisciplinary methodology that flatter roadways are better, resulting in
involves all stakeholders throughout the sleeker roadways and higher design
project development process to design a speeds than what may be optimal in a
transportation facility that fits its given situation. When applied rigidly,
physical setting and preserves scenic, conventional standards can actually
aesthetic, historic, and environmental hinder efforts to achieve various
resources, while maintaining safety and community objectives. Context
mobility. CSD is an approach that Sensitive Design has been termed by the
considers the total context within which U.S. Department of Transportation as
a transportation improvement project "thinking beyond the pavement"
will exist.
Public Involvement in Context
CSD requires an early and continuous Sensitive Design
commitment to public involvement,
flexibility in exploring new solutions, Governmental actions that involve
and an openness to new ideas, change to existing residential
Community members and residents plan neighborhoods tend to be controversial.
an important role in identifying local and The following strategies are aimed at
regional concerns and solutions that may facilitating open communication with
better meet and balance the needs of all affected parties and to ensure continuous
stakeholders. Context Sensitive Design public involvement, up to and including
promotes six key principles, including: the decision-making process, which will
help minimize conflicts and foster public
· Balance safety, mobility, trust.
community and environmental
goals in the project. 1. The process will be fair,
· Involve the public and affected reasonable and open
parties early and continuously.
· Use an interdisciplinary team Citizens need to know that the decision-
tailored to each projects needs, making process is fair and reasonable,
· Address all modes of travel/ that they are being heard, and their
transportation, concerns are being considered.
· Apply flexibility inherent in Roadway projects or actions will not be
design standards, developed or physical changes to
existing roadways imposed upon
· Incorporate aesthetics as an
residents without early and continuous
integral part of good design.
public involvement. To initiate a
project, city staff will conduct an open
house, workshop or charrette to solicit 4. Continuity of involvement as
comments and ideas from the public. A project progresses
citizen involvement committee will be
formed with citizen volunteers, Continuity of public involvement in
potentially affected property owners, CSD will be maintained to ensure the
businesses, or other interested parties to project is kept on track without losing
assist with design and development of support. Many times citizen interest will
the project. The committee will be decline if issues are not clear, are
advisory and shall assist staff in considered to be insignificant, or all
deliberating key issues, collaborating on contributions have been made. The
the resolution of complex or process shall include the preparation of
controversial issues and formulating summary reports of decisions and
appropriate courses of action, commitments that have been made and
the process through which they were
2. Stakeholders will be invited and reached. These reports, the minutes of
involved all meetings, and the history of public
involvement will become an essential
The objective of public involvement part of the project documents and will
with CSD project development is to ensure that commitments are carried
bring public concerns to the forefront so through into construction or deployment
they can be debated and resolved. Early of any changes.
and continuous involvement of major
stakeholders in the process will be 5. Provide the City's basis for
solicited and no one who wants to decision making, including policies
participate will be excluded. Outreach and guidelines
techniques may be formal and informal
and will be adaptive to the availability The public involvement process will
and profile of volunteers, include disclosure of the policies and
guidelines that regulate roadway design
3. Public Involvement will parallel in the City of Eugene, since this is an
the decision process important factor in the decision process.
As decisions are made, staff will be
The public involvement process for CSD required to demonstrate how those
project development will not be a policies and guidelines affect the
discrete task, and will be integrated into outcome. The need for safety,
the work program and will parallel the constructability, maintainability and
technical decision-making process, cost-effectiveness of each element must
Employing CSD techniques is be balanced with issues of livability and
anticipated to add time to the project the need to move goods, services and
development process and timelines shall people. There needs to be adequate
be adjusted to provide the necessary time effort to demonstrate that any concepts
for the committee to meet for the or alternatives proposed by the public
purpose of identifying and resolving that cannot be incorporated due to policy
issues related to the project, or guideline incompatibilities were given
a fair review and due consideration.
6. Seek a clear understanding of
public concerns.
CSD public involvement will provide
opportunities for people to express their
specific concerns. Property owners and
interested parties opinions will be
actively solicited and the project
objectives shall address these concerns.
7. Demonstrate that concerns will be
considered
It must be clear to participants that all
projects are open to new ideas and there
is a process for considering
modifications. The CSD public
involvement process will provide a role
for citizens in the decision-making
process and staff will seek to modify the
project in response to valid public
concerns. The challenge is to balance
technical solutions and public concerns,
while adhering to critical elements of
safety and operational standards that
regulate project development.
8. Follow-up and Feedback
All issues raised through the public
involvement process will be followed up
promptly and resolved with participants,
or clear responses to concerns will be
provided. Key recommendations or
issues will be summarized, staff
responses to each will be distributed and
future opportunities to participate will be
defined. Whenever additional analysis is
required, it shall be completed as soon as
practicable after concerns or comments
are received. Although full consensus is
generally unattainable, we will endeavor
to hold this as our prime objective as we
work to achieve resolution of all issues.
ATTACHMENT B
Crest Drive Area
I W28TH AVE I
W 29TH AVE
I I
~ ~< "~ ~ :IOTHAVE
~'1
~ HST AVE
CREST DR
/
I
I CREST DR
I
W 36TH AVE
I w W36T. AVE
I .._ -- -- I 38TH AVE W 37TH AVE
J W 38TH AVE
W 40TH AVE
I ! .... '-'
PO'I'FNII~L
I ! ~ NEIGHBORHOOD COLLECTOR*
CREST STUDY AREA
* recommended by Eugene Planning Commission
8/04